Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberBLD12-02539
StatusFinaled
Name TERRY ADAMS INC
Site Address 350 N MILWAUKEE ST Unit: 2173
Project NameBTS SPACE 2173
Customer Number 
ePlanReviewNo
Description
(OAKLEY - RACKING) To install steel storage racking exceeding 8' in height (12 foot high storage shelving) within a tenant space (See BLD12-01669) per approved plans and structural engineering. SPECIAL INSPECTIONS ARE REQUIRED. Work to include: To install 384 square feet total area of racking/shelving (including aisles). Each unit will be bolted to the floor and have more than 36" isles between rows. The design, testing and utilization of industrial steel storage racks shall be in accordance with the RMI/ANSI MH 16.1. A Letter of Completion is to be issued when done. The existing envelope is not being affected by this permit. EACH RACKING SYSTEM SHALL HAVE A PLAQUE LOCATED AT EACH RACKING SYSTEM STATING THE MAXIMUM WEIGHT TO BE STORED ON THAT PERTICULAR RACKING SYSTEM PER THE ENGINEERS CRITERIA STATED ON THE PLANS FOR EACH RACKING SYSTEM. NOTE: "This building is fully Fire Sprinklered for with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department." **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 10/25/201210/17/2012 DONE
First Notice10/12/201210/12/201210/15/2012 DONE
DetailsTom Arcoraci
faxed 10-15-12
BLD-Final10/11/201210/12/201210/12/2012PPASS
DetailsTom Arcoraci
Chet Phone #: ###-####
DOC - Permit Finaled10/12/201210/12/201210/12/2012PPASS
DetailsTom Arcoraci
FIRE-Final Inspection10/11/201210/12/201210/12/2012APASS
DetailsTroy Cobbley
life safety passed.
Letter of compliance/Occupancy  10/12/2012 DONE
DetailsChristina Prado
Issue PAID IN FULL permit  10/11/2012 DONE
DetailsTisha Gallop
Plan assigned to (SRZ)10/1/201210/1/201210/9/2012 PASS
DetailsSam Zahorka
1st review completed. Waiting for Fire to pass
Routing - FIRE10/4/2012 10/9/2012 PASS
DetailsScott Arellano
Plans are approved as shown. No comments attached to plans.
1st review completed  10/9/2012 PASS
Routing - PLAN CHECK10/9/2012 10/9/2012 PASS
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  10/9/2012 DONE
DetailsSam Zahorka
Inspection Record Card- Bld  10/9/2012 DONE
DetailsChristina Prado
Inspection Record Card- Bld  10/9/2012 DONE
DetailsChristina Prado
Permit Ready to Issue  10/9/2012 DONE
DetailsTisha Gallop
Telephone call  10/9/2012 DONE
DetailsTisha Gallop
called Rukhsana and left vm permit is ready, fees and need GC/RCE/form.
Routing - PLAN CHECK10/1/2012 10/4/2012 PASS
DetailsSam Zahorka
Pending Assignment by JCB9/28/2012 10/1/2012 DONE
DetailsJason Blais
Application received 9/21/20129/28/2012 DONE
DetailsChristina Prado
Plans ACCEPTED BY PLAN TECH  9/28/2012 DONE
DetailsChristina Prado
Intake Approval  9/28/2012 PASS
DetailsTim L. Woodard
Intake passed on 9/21/12. Plan Review Fees paid on 9/28/12.
Recd Pcfee & Taken To Pln CK  9/28/2012 DONE
DetailsChristina Prado