Permanent Occupancy | | | 10/5/2012 | | DONE |
|
|
|
|
BLD-Final | 10/4/2012 | 10/4/2012 | 10/4/2012 | P | PASS |
Tom Arcoraci
|
|
|
Petra Phone #: ###-####
|
FIRE-Final Inspection | 10/3/2012 | 10/4/2012 | 10/4/2012 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 9/28/2012 | 10/2/2012 | 10/2/2012 | P | CANC |
Troy Cobbley
|
|
|
Please call ahead for access - Petra Phone #: ###-####
|
FIRE-Conference | 9/28/2012 | 9/28/2012 | 9/28/2012 | P | DONE |
Troy Cobbley
|
|
|
I met Petra and the building owner and discussed hardware options on the south/rear exit door.
|
BLD-Conference | 9/26/2012 | 9/27/2012 | 9/27/2012 | A | PASS |
Tom Arcoraci
|
|
|
Petra-As early as possible please and please call first Phone #: ###-#### went over items required for occupancy
|
FIRE-Final Inspection | 9/26/2012 | 9/26/2012 | 9/26/2012 | P | FAIL |
Troy Cobbley
|
|
|
Provide sticker at the main exit, provide annual inspection for the fire extinguisher, remove the dead bolts, top and bottom, at the main exit, remove the thumbturn deadbolt at the rear exit and provide single action hardware or get plan review approval to cover door since only one exit is required.
|
BLD-Final | 9/26/2012 | 9/27/2012 | 9/26/2012 | A | CANC |
Tom Arcoraci
|
|
|
early as poss//call first//Petra Phone #: ###-####
|
Plan assigned to (TLW) | 9/21/2012 | | 9/26/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 9/21/2012 | | 9/26/2012 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 9/26/2012 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/26/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 9/26/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 9/26/2012 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 9/26/2012 | | DONE |
Christina Prado
|
|
|
called Petra to advise permit is ready
|
Permit Ready to Issue | | | 9/26/2012 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 9/26/2012 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | 9/21/2012 | 9/21/2012 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/21/2012 | | DONE |
Tisha Gallop
|
|
|
|