Second Notice | | 8/15/2013 | 8/13/2013 | | DONE |
|
|
|
final value done in combination with pool project Bld12-02772
|
Print Statement | | | 8/13/2013 | | DONE |
Tisha Gallop
|
|
|
mailed to Woodriver Builders
|
Telephone call | | | 8/8/2013 | | DONE |
Tisha Gallop
|
|
|
Received in mail final cert of value with project value only filled out spoke to and e-mailed Todd Blackwell with Woodriver. Told him need breakdown of values and ok to combine clubhouse (bld12-02722) and pool permit (bld12-02551) into one final value.
|
First Notice | | 7/5/2013 | 8/5/2013 | | DONE |
|
|
|
|
Permanent Occupancy | | | 6/25/2013 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 6/19/2013 | 6/20/2013 | 6/20/2013 | P | PASS |
Jim Sly
|
|
|
Bob Phone #: ###-#### OK for Perm Occ.
|
PubWorks Occupancy Approval | 6/20/2013 | 6/20/2013 | 6/20/2013 | | DONE |
Jason C. Taylor
|
|
|
Visited site, stormdrain connected to gutters. Ok for occupancy.
Jason Taylor ###-####
|
FIRE-Final Inspection | 5/9/2013 | 5/9/2013 | 5/9/2013 | P | PASS |
Troy Cobbley
|
|
|
life safety passed.
|
FIRE-Final Inspection | 4/29/2013 | 4/30/2013 | 4/30/2013 | A | FAIL |
Troy Cobbley
|
|
|
Provide an exit sign, emergency lighting and exit discharge lighting as per approved plan or discuss with plan review. Remove all thumbturn dead bolts as discussed and per approved plans. Key is allowed at the main exit all other need to be single action.
|
FIRE-Final Inspection | 4/26/2013 | 4/29/2013 | 4/29/2013 | A | FAIL |
Troy Cobbley
|
|
|
No city approved plans/notes on site. I went over general life safety requirements with the builder. He currently has thumbturn deadbolts on all doors which will probably be an issue. Also needs address.
|
BLD-Energy code compliance | 3/18/2013 | 3/20/2013 | 3/21/2013 | P | PASS |
Tony Young
|
|
|
bob Phone #: ###-####
|
BLD-Other | 3/20/2013 | 3/20/2013 | 3/21/2013 | P | PASS |
Tony Young
|
|
|
fire rated eaves - Bobby Phone #: ###-####
|
BLD-Framing/Rough-in | 3/18/2013 | 3/19/2013 | 3/20/2013 | P | PART |
Tony Young
|
|
|
bob Phone #: ###-####,, ok to insulate,, needs full plumbing rough in
|
BLD-Wall Bracing | 3/11/2013 | 3/11/2013 | 3/11/2013 | P | PASS |
Tony Young
|
|
|
Bobby Phone #: ###-####
|
BLD-Footing | 12/12/2012 | 12/12/2012 | 12/24/2012 | P | PASS |
Tony Young
|
|
|
Joe Phone #: ###-####
|
BLD-Foundation | 12/13/2012 | 12/13/2012 | 12/14/2012 | P | DONE |
Tony Young
|
|
|
Joe Phone #: ###-####
|
Routing PW Grading-Hillside | 12/14/2012 | | 12/14/2012 | | PASS |
Jim Wyllie
|
|
|
Received letter from geotechnical engineer approving footing subgrade. Okay to schedule a footing inspection. Jim Wyllie (###-####)
|
BLD-Footing | 12/11/2012 | 12/12/2012 | 12/12/2012 | A | PEND |
Tony Young
|
|
|
Joe Phone #: ###-####,, ok pending sub grade ok from JW
|
BLD-Footing | 12/11/2012 | 12/11/2012 | 12/11/2012 | P | NR |
Tony Young
|
|
|
Joe Phone #: ###-####
|
Issue PAID IN FULL permit | | | 12/4/2012 | | DONE |
Barbara Stitt
|
|
|
|
OVERRIDE | | | 11/30/2012 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/30/2012 | | DONE |
Sam Zahorka
|
|
|
|
Print Occupancy Form | | | 11/30/2012 | | DONE |
|
|
|
|
Telephone call | | | 11/30/2012 | | DONE |
Christina Prado
|
|
|
Called Todd to advise permit is ready and ACHD & RP are required prior to issuance as well as the fees due
|
Permit Ready to Issue | | | 11/30/2012 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (SRZ) | 10/11/2012 | | 11/30/2012 | | PASS |
Sam Zahorka
|
|
|
1st review completed.
|
Routing - FIRE | 11/28/2012 | | 11/29/2012 | | PASS |
Scott Arellano
|
|
|
No separate comments attached. One fire extinguisher is required within the clubhouse and a posted sign indicating a maxumum occupancy at 26.
|
1st review completed | | | 11/29/2012 | | FAIL |
|
|
|
Failed Plan Check and PW
|
Routing - PLAN CHECK | 11/29/2012 | | 11/29/2012 | | PASS |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 10/24/2012 | | 11/28/2012 | | FAIL |
Sam Zahorka
|
|
|
|
Plan resubmittals received | | | 11/16/2012 | | DONE |
|
|
|
rec'd two copies of sheets A2.0; A3.0; S1.0; S2.0; M-1; P-1; P-2; E-1; E-2 - inserted by todd and taken back to Sam
|
Telephone call | | | 11/9/2012 | | DONE |
Sam Zahorka
|
|
|
Spoke with Todd Blackwell. Explained that I preformed a pre-plan review plumbing fixture count for this project to verify a possibility for an early foundation start. Additional plumbing fixtures are needed (1 additional female water closet and drinking fountains). No Early Foundation start can be issued until revise floor plans has been submitted. Plan review will be completed A.S.A.P. 1st review is technically due by 11/21/12.
|
Plan Reviewer's activity | | | 11/8/2012 | | DONE |
Sam Zahorka
|
|
|
I preformed a pre-plan review plumbing fixture count for this project to verify a possibility for an early foundation start. Additional plumbing fixtures are needed (1 additional female water closet and drinking fountains). No Early Foundation start can be issued until revise floor plans has been submitted. Plan review will be completed A.S.A.P.
|
Routing - PLANNING | 10/23/2012 | | 10/24/2012 | | PASS |
Joshua Johnson
|
|
|
|
Routing - PLUMBING | 10/23/2012 | | 10/23/2012 | | PASS |
Daryl Spivey
|
|
|
1. Protect outside shower water and drains against freezing.
2. Provide RPBP on 1" water for pool equipment.
3. Size hot water as noted on prints- 3/4" to water heater and out to fixtures.
4. Per 2003 UPC.
|
Routing - Erosion and Sediment | 10/18/2012 | | 10/23/2012 | | PASS |
Kimberly M. Johnson
|
|
|
LM for PD 10/19. LM for PD 10/22. Called PD 10/23 to review stabilization and SWPPP amendment requirements. Plan approved per redlines and conditions.
|
Routing PW Grading-Hillside | 10/18/2012 | | 10/18/2012 | | PASS |
Jim Wyllie
|
|
|
Prior to scheduling a footing subgrade inspection, provide a letter from the the geotechnical engineer approving the footing subgrade. Jim Wyllie (###-####)
|
Routing PW Drainage | 10/17/2012 | | 10/18/2012 | | PASS |
Brian Murphy
|
|
|
HILLSIDE NOT ODI. WILL BE HILLSIDE REVIEW
|
Routing - PUBLIC WORKS | 10/12/2012 | | 10/18/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Grading-Hillside | 10/15/2012 | | 10/17/2012 | | FAIL |
Jim Wyllie
|
|
|
Applicant needs authorization from ACHD to connect to street storm drain system. Jim Wyllie (###-####)
|
Routing PW Sewer Rating | 10/17/2012 | | 10/17/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 10/15/2012 | | 10/15/2012 | | PASS |
April Wing
|
|
|
Changed address and parcel number to reflect current site plan.
|
Routing - PLANNING Land Div | 10/11/2012 | | 10/12/2012 | | PASS |
Dave Abo
|
|
|
Approved. The construction of the pool is a requirement of the CUP which must be completed prior to approval of other phases of Eyrie Canyon.
|
Plans ACCEPTED BY PLAN TECH | | | 10/11/2012 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/11/2012 | | DONE |
Christina Prado
|
|
|
|
Pending Assignment by JCM | 10/11/2012 | | 10/11/2012 | | DONE |
John Menard
|
|
|
|
Application received | | 9/24/2012 | | | |
|
|
|
|