Case Summary (BLD) | | | 12/10/2015 | | DONE |
|
|
|
|
Third Notice | | 7/24/2013 | 7/19/2013 | | DONE |
|
|
|
|
Print Statement | | | 7/19/2013 | | DONE |
Christina Prado
|
|
|
|
Third Notice | | 6/8/2013 | 7/2/2013 | | DONE |
Tisha Gallop
|
|
|
6/12/13 received final value from Cecyl Brock/EKC, but it was application page. I e-mailed her back need form 306. --- faxed to EKC 7/2/13
|
Second Notice | | 5/3/2013 | 6/3/2013 | | DONE |
|
|
|
Faxed 6-3-13
|
First Notice | 3/29/2013 | 3/29/2013 | 4/23/2013 | | DONE |
Dave Hannah
|
|
|
Faxed 4-23-13
|
BLD-Final | 3/28/2013 | 3/29/2013 | 3/29/2013 | A | PASS |
Dave Hannah
|
|
|
tony - call 30 mins prior Phone #: ###-####
|
DOC - Permit Finaled | 3/29/2013 | 3/29/2013 | 3/29/2013 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 3/26/2013 | 3/27/2013 | 3/28/2013 | A | DEFR |
Jim Storey
|
|
|
Tony-PLease call at least 30 mins prior to insepction Phone #: ###-#### pending ele
|
FIRE-Final Inspection | 3/26/2013 | 3/26/2013 | 3/27/2013 | P | PASS |
Forrest France
|
|
|
Fire life safety finaled. New door hardware can be verified at structural final as discussed.
|
FIRE-Final Inspection | 3/19/2013 | 3/20/2013 | 3/21/2013 | A | FAIL |
Forrest France
|
|
|
Door hardware at the second storefront exit still needs revision. Fire extinguishers have been serviced.
|
FIRE-Final Inspection | 3/6/2013 | 3/7/2013 | 3/7/2013 | A | FAIL |
Forrest France
|
|
|
C/N items include- provide current certifications for the existing fire extinguishers, provide approved hardware at the second storefront exit door.
|
FIRE-Final Inspection | 1/22/2013 | 1/22/2013 | 1/22/2013 | P | PART |
Forrest France
|
|
|
Okay to cover drop ceilings- Life safety final NR.
|
BLD-Conference | 1/17/2013 | 1/18/2013 | 1/18/2013 | A | PASS |
Jim Storey
|
|
|
please call ahead for access - tony Phone #: ###-#### ceilling and floor assembly ok pending others.
|
BLD-Framing/Rough-in | 1/9/2013 | 1/9/2013 | 1/9/2013 | P | PASS |
Jim Storey
|
|
|
tony please call 30 min before going out Phone #: ###-####2nd floor wall ok
|
Issue PAID IN FULL permit | | | 12/13/2012 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Bld | | | 12/4/2012 | | DONE |
|
|
|
|
Telephone call | | | 12/4/2012 | | DONE |
Christina Prado
|
|
|
Called Ryan to advise permit is ready pending GC information and gave fees due
|
Permit Ready to Issue | | | 12/4/2012 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (TLW) | 11/29/2012 | | 12/3/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 11/29/2012 | | 12/3/2012 | | PASS |
Tim L. Woodard
|
|
|
Plan Modification approved. No change to code review. TLW
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/3/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 12/3/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Plan resubmittals received | | | 11/29/2012 | | DONE |
Christina Prado
|
|
|
Received two sets of plans marked G0.01, A0.10, A1.10, A1.30, A5.01, A7.10, A8.10, M-0.00, M-2.11, P-0.00, P-2.11, E0.1, EC.1, EL.1, EL.2, EP.1 & EP.2. Also received two sets of plans marked Clean Air Solutions; routed to Tim for review
|
Plan assigned to (TLW) | 10/1/2012 | | 10/19/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 10/9/2012 | | 10/19/2012 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 10/19/2012 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/19/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 10/19/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Inspection Record Card- Bld | | | 10/19/2012 | | DONE |
|
|
|
|
Telephone call | | | 10/19/2012 | | DONE |
Christina Prado
|
|
|
Called Ryan to advise permit is ready; gave fees due and also advised GC is required prior to issuance
|
Permit Ready to Issue | | | 10/19/2012 | | DONE |
Christina Prado
|
|
|
|
Plan resubmittals received | | | 10/15/2012 | | |
|
|
|
Received a cover transmittal and 2 copies of sheets G0.01, A0.10, A1.10, A1.30, A5.01, A7.10, A8.10, M-0.00, M-2.11, P-0.00, P-2.11, E0.1, EC.1, EL.1, EL.2, EP.1, EP.2 and taken to Tim Woodard
|
Routing - FIRE | 10/3/2012 | | 10/9/2012 | | PASS |
Scott Arellano
|
|
|
No separate comments attached.
|
1st review completed | | | 10/9/2012 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 10/2/2012 | | 10/3/2012 | | PEND |
Tim L. Woodard
|
|
|
Approved per: recieving calc on existing roof trusses adequacy to carry new suspended filtration system. TLW
|
Routing - PUBLIC WORKS | 10/1/2012 | | 10/2/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Rating | 10/2/2012 | | 10/2/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Application received | | 9/28/2012 | 10/1/2012 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/1/2012 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/1/2012 | | DONE |
|
|
|
|
Intake Approval | | | 10/1/2012 | | PASS |
|
|
|
|
Routing - Addressing | 10/1/2012 | | 10/1/2012 | | PASS |
April Wing
|
|
|
|