Permanent Occupancy | | | 12/28/2015 | | DONE |
|
|
|
|
BLD-Final | 2/13/2013 | 2/13/2013 | 2/13/2013 | P | PASS |
Tony Young
|
|
|
zach Phone #: ###-####,, ok for full c of o
|
BLD-Conference | 2/5/2013 | 2/5/2013 | 2/5/2013 | P | PASS |
Tony Young
|
|
|
Zack Phone #: ###-####,, clarified some ADA issues
|
BLD-Final | 2/4/2013 | 2/4/2013 | 2/5/2013 | P | PART |
Tony Young
|
|
|
Zack Phone #: ###-####,, temp occ ok,, need to finish some details
|
FIRE-Final Inspection | 1/30/2013 | 1/31/2013 | 1/31/2013 | P | PASS |
Forrest France
|
|
|
Corrections finished. Fire life safety passed.
|
BLD-Final | 1/31/2013 | 1/31/2013 | 1/31/2013 | P | NR |
Tony Young
|
|
|
zach Phone #: ###-####,, need tradezs,, ADA compliance,, conf. only
|
FIRE-Final Inspection | 1/31/2013 | 1/31/2013 | 1/31/2013 | A | PART |
Forrest France
|
|
|
Previous C/N items finsihed with the exception of door hardware at the basement level south exit and a current annual inspection of the existing fire sprinkler system.
|
BLD-Final | 1/22/2013 | 1/23/2013 | 1/23/2013 | P | NR |
Tony Young
|
|
|
Derrick Phone #: ###-####
|
FIRE-Final Inspection | 1/22/2013 | 1/23/2013 | 1/23/2013 | A | FAIL |
Forrest France
|
|
|
C/N items include; final open fire sprinkler permit, provide missing outside waterflow bell, keys at knox box, repair EM lights at the restroom corridor and basement levels, install EM lights per plan at the east and west exits, revise door hardware at four locations.
|
FIRE-Conference | 12/31/2012 | 12/31/2012 | 12/31/2012 | P | DONE |
Forrest France
|
|
|
|
BLD-Framing/Rough-in | 11/19/2012 | 11/20/2012 | 11/20/2012 | A | PASS |
Tony Young
|
|
|
Zach Phone #: ###-####,, walls ok to cover
|
Print Occupancy Form | | | 11/19/2012 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 11/19/2012 | | DONE |
Tisha Gallop
|
|
|
|
Issue PAID IN FULL permit | | | 11/19/2012 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (DRS) | 10/22/2012 | 10/22/2012 | 11/16/2012 | | PASS |
Dan Stuart
|
|
|
|
Routing - PLAN CHECK | 11/16/2012 | | 11/16/2012 | | PASS |
Dan Stuart
|
|
|
Resubmittals received and reviewed. Red line comments added and copy of agency plan review comments were attached.
|
Plan resubmittals received | | | 11/16/2012 | | DONE |
|
|
|
e-palan review resubmittals uploaded.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/16/2012 | | PASS |
Dan Stuart
|
|
|
|
Routing - FIRE | 11/7/2012 | | 11/9/2012 | | PASS |
Scott Arellano
|
|
|
Attached plan review report to plans.
|
1st review completed | | | 11/9/2012 | | FAIL |
Dan Stuart
|
|
|
Failed in IBC Plan check
|
Plan resubmittals requested | | | 11/9/2012 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/22/2012 | | 11/8/2012 | | FAIL |
Dan Stuart
|
|
|
Resubmittals required.
|
Routing - Addressing | 10/24/2012 | | 10/24/2012 | | PASS |
April Wing
|
|
|
|
Routing PW Sewer Rating | 10/23/2012 | | 10/23/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PUBLIC WORKS | 10/23/2012 | | 10/23/2012 | | PASS |
Beverly Mountain
|
|
|
|
Intake Approval | | | 10/22/2012 | | |
Tim L. Woodard
|
|
|
|
Application received | | | 10/4/2012 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 4 2012 11:36AM
|