Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD12-02688
StatusFinaled
Name HC COMPANY INC
Site Address 401 N STEELHEAD WAY
Project NameVW / Audi Detail Shop
Customer Number 
ePlanReviewYes
Description
(VW / Audi Detail Shop) 1/3/13 PLAN MODIFICATION - Changes include the addition of a new mechanical system in order to establish this space as a full service shop vs. a detailing only shop. **TLW** Permit to occupy a new tenant space within an existing building for automobile detailing. Tenant will install two new interior car lifts, new exterior compressor room, and electrical work, mechanical and plumbing work. This building is fully fire sprinklered. Any modifications to the building fire sprinkler system will require a separate permit; as regulated by the fire department. Fire & life safety compliance for door hardware, exit signage, emergency egress lighting and egress illumination shall be provided if not already existing. *Drs*
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 2/18/20132/15/2013 DONE
This permit finaled on the web by Brian Warbis
BLD-Final2/7/20132/8/20132/8/2013APASS
DetailsMike Jordan
darin Phone #: ###-####. Ok for perm occ.
Permanent Occupancy  2/8/2013 DONE
DetailsChristina Prado
FIRE-Final Inspection2/7/20132/7/20132/7/2013PPASS
DetailsTroy Cobbley
Life safety passed
FIRE-Conference2/5/20132/6/20132/6/2013ACANC
DetailsTroy Cobbley
Wrong permit number called in.
FIRE-Final Inspection2/5/20132/6/20132/6/2013APART
DetailsTroy Cobbley
A temporary occupancy is being given with Scott Arellano's permission until the new fire sprinkler permit has been addressed.
BLD-Final2/5/20132/6/20132/6/2013PPART
DetailsMike Jordan
Darren Phone #: ###-####. Ok for temp occ. Will be ok for perm occ. once fire/life/safety singns perm.
Temporary Occupancy2/6/20135/7/20132/6/2013 DONE
DetailsChristina Prado
FIRE-Conference2/5/20132/5/20132/5/2013PDONE
DetailsTroy Cobbley
Darren and I went over life safety requirements. All life safety items are ok except for what appears to be blocked upright sprinkler heads at new mechanical penatrations. This work was outside of the sprinkler contractors scope of work.
BLD-Conference2/1/20132/4/20132/4/2013ADONE
DetailsMike Jordan
darren Phone #: ###-####
CHANGE STATUS TO (ISS)  1/31/2013 DONE
DetailsTisha Gallop
paid for plan mod
BLD-Conference1/14/20131/15/20131/15/2013ADONE
DetailsMike Jordan
darren - call 30 mins prior to meet Phone #: ###-####
Plan assigned to (TLW)1/3/2013 1/15/2013 DONE
DetailsTim L. Woodard
ePlanReview - Plan Modification
Routing - FIRE1/3/2013 1/14/2013 PASS
DetailsScott Arellano
Attached IFC plan review report to plans.
Routing - PLAN CHECK1/3/2013 1/10/2013 PASS
DetailsTim L. Woodard
Routing - Addressing1/4/2013 1/4/2013 PASS
DetailsApril Wing
Routing PW Sewer Rating1/3/2013 1/4/2013 PASS
DetailsBeverly Mountain
Routing PW Environmental1/3/2013 1/3/2013 PASS
DetailsWalt Baumgartner
oil sediment interceptor must have vented headspace per plumbing code
BLD-Framing/Rough-in11/30/201211/30/201211/30/2012PPASS
DetailsMike Jordan
Steel stud - Steve Phone #: ###-####. Interior stell stud walls for new washbay and compressor room ok.
Permit Ready to Issue  10/30/2012 DONE
DetailsTisha Gallop
Print Occupancy Form  10/30/2012 DONE
DetailsChristina Prado
Issue PAID IN FULL permit  10/30/2012 DONE
DetailsChristina Prado
Plan assigned to (DRS)10/19/201210/19/201210/29/2012 PASS
DetailsDan Stuart
PLANS/APPL TAKEN TO FRONT DESK  10/29/2012 PASS
Routing - PLAN CHECK10/15/2012 10/29/2012 PASS
DetailsDan Stuart
1st review completed  10/29/2012 PASS
DetailsDan Stuart
Plan assigned to (TLW)10/15/2012 10/19/2012 DEFR
DetailsTim L. Woodard
Review deffered to Dan S.
Routing - FIRE10/15/2012 10/19/2012 PASS
DetailsScott Arellano
Attached Fire Code comments to plans.
Routing PW Sewer Rating10/15/2012 10/16/2012 PASS
DetailsConnie Baumgartner
Routing PW Environmental10/15/2012 10/16/2012 PASS
DetailsWalt Baumgartner
oil/sed interceptor must comply w/ vented headspace code requirements, plans note one trench drain in car wash area
Routing - Addressing10/15/2012 10/16/2012 PASS
DetailsApril Wing
Routing - PUBLIC WORKS10/15/2012 10/16/2012 PASS
DetailsConnie Baumgartner
Intake Approval  10/15/2012 PASS
DetailsTim L. Woodard
Application received  10/8/2012 DONE
Application submitted via PDS Online on Oct 8 2012 1:14PM