Permanent Occupancy | | | 10/18/2012 | | DONE |
Tisha Gallop
|
|
|
e-mailed to applicant; told him need to have a copy on project site.
|
BLD-Final | 10/16/2012 | 10/17/2012 | 10/17/2012 | A | PASS |
Mike Jordan
|
|
|
Tracey Phone #: ###-####. OK for perm occ.
|
FIRE-Final Inspection | 10/16/2012 | 10/17/2012 | 10/17/2012 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 10/15/2012 | 10/16/2012 | 10/16/2012 | A | NR |
Mike Jordan
|
|
|
Tracey Phone #: ###-####
|
FIRE-Final Inspection | 10/15/2012 | 10/15/2012 | 10/15/2012 | P | FAIL |
Troy Cobbley
|
|
|
Provide ADA hardware on the office pocket door as per the previous correction notice. Also repair the exit sign at the main exit.
|
Issue PAID IN FULL permit | | | 10/12/2012 | | DONE |
|
|
|
e-mailed all documents and sign off card to applicant
|
Plan assigned to (TLW) | 10/10/2012 | | 10/11/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 10/10/2012 | | 10/11/2012 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 10/11/2012 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/11/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 10/11/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Permit Ready to Issue | | | 10/11/2012 | | DONE |
Tisha Gallop
|
|
|
|
Print Occupancy Form | | | 10/11/2012 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 10/11/2012 | | DONE |
Tisha Gallop
|
|
|
called Shawn Davis and left vm permit is ready.
|
Plans ACCEPTED BY PLAN TECH | | | 10/10/2012 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | 10/10/2012 | | | |
|
|
|
|