Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD12-02722
StatusFinaled
Name WOOD RIVER BUILDERS
Site Address 2161 W WINTER CAMP DR
Project NameEyrie Canyon Pool
Customer Number 
ePlanReviewNo
Description
Eyrie Canyon Pool - To construct an in-ground 25' x 40' gunite swimming pool, ranging from approximately 3'-6" depth to 5' depth, with related pool heater, filtering and operation equipment. Pool, deck & equipment shall be bonded per the NEC. Reinforcement and wall thickness to be in accordance with reviewed plans and engineering. Site plan indicates a barrier fence of 48" height, gates and gate hardware to comply with Section 3109 & Sec. 1008.2, 2009 IBC. The clubhouse, the required fencing around the pool, and accessible restrooms were constructed under BLD12-02551. The required fence barrier, egress/access gates and panic hardware shall be installed and approved for code compliance before the pool permit can be finaled for use. Plumbing fixtures, IBC Ch. 29, for pool/deck occupant load to be provided for code compliance see (restrooms & fixtures for Clubhouse, BLD12-02551). Maximum occupant loads sign shall be posted for the Pool/Deck area (129) which was used to establish plumbing fixture requirements. Accessibility of recreational facilities is responsibility of contractor, design professional & owners per current ADA requirements. NOTE: All storage and handling of chemicals shall be per the Fire Code. All work per the approved plans, attached plan review comments, and conditions of all reviewing agencies for this project. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled  1/4/2016 DONE
final passed 6-27-13
Second Notice 8/15/20138/13/2013 DONE
final value done in combination with clubhouse project Bld12-02551
Telephone call  8/8/2013 DONE
DetailsTisha Gallop
Received in mail final cert of value with project value only filled out spoke to and e-mailed Todd Blackwell with Woodriver. Told him need breakdown of values and ok to combine clubhouse (bld12-02722) and pool permit (bld12-02551) into one final value.
BLD-Final6/26/20136/27/20136/27/2013APASS
DetailsTony Young
Bob Phone #: ###-####
FIRE-Final Inspection6/24/20136/26/20136/26/2013PPASS
DetailsTroy Cobbley
life safety passed
BLD-Final6/19/20136/20/20136/20/2013PNR
DetailsJim Sly
Bob Phone #: ###-####
Need fire life safety inspection.
PubWorks Occupancy Approval6/20/20136/20/20136/20/2013 DONE
DetailsJason C. Taylor
FIRE-Final Inspection5/8/20135/9/20135/9/2013ACANC
DetailsTroy Cobbley
Wrong permit number. Needed club house
BLD-Other3/19/20133/20/20133/20/2013ACANC
DetailsTony Young
fire rated eaves - Bobby Phone #: ###-####
this is the pool permit,, pool house eaves ok
BLD-Other3/19/20133/19/20133/20/2013PCANC
DetailsTony Young
fire rated eaves - Bobby Phone #: ###-####
BLD-Framing/Rough-in3/12/20133/13/20133/13/2013APART
DetailsTony Young
Bobby Phone #: ###-####,, rebar for pool,, replace rebar standoffs with plastic or dobies,, ok to shoot when ready
Routing PW Grading-Hillside12/13/2012 12/13/2012 PASS
DetailsJim Wyllie
Received letter from geotechnical engineer approving footing subgrade. Okay to schedule a footing inspection. Jim Wyllie (###-####)
Issue PAID IN FULL permit  12/4/2012 DONE
DetailsBarbara Stitt
PLANS/APPL TAKEN TO FRONT DESK  11/30/2012 DONE
DetailsSam Zahorka
Inspection Record Card- Bld  11/30/2012 DONE
Telephone call  11/30/2012 DONE
DetailsChristina Prado
called Todd to advise permit is ready and gave fees due
Permit Ready to Issue  11/30/2012 DONE
DetailsChristina Prado
Plan assigned to (SRZ)10/11/2012 11/30/2012 PASS
DetailsSam Zahorka
1st review completed.
Routing - PLUMBING  11/30/2012 PASS
DetailsDaryl Spivey
Routing - Erosion and Sediment10/18/2012 11/30/2012 PASS
DetailsKimberly M. Johnson
Routing - FIRE11/28/2012 11/29/2012 PASS
DetailsScott Arellano
No comments.
Routing - PLAN CHECK10/24/2012 11/29/2012 PASS
DetailsSam Zahorka
Routing - PLANNING  10/24/2012 PASS
Routing - PUBLIC WORKS10/15/2012 10/18/2012 PASS
DetailsConnie Baumgartner
Routing PW Sewer Rating10/17/2012 10/17/2012 PASS
DetailsConnie Baumgartner
Routing - Addressing10/15/2012 10/15/2012 PASS
DetailsApril Wing
Changed address and parcel number to reflect the current site plan.
Plans ACCEPTED BY PLAN TECH  10/11/2012 DONE
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  10/11/2012 DONE
DetailsChristina Prado
Pending Assignment by JCM10/11/2012 10/11/2012 DONE
DetailsJohn Menard
Application received 10/11/2012