Second Notice | | 6/17/2019 | 6/27/2019 | | DONE |
|
|
|
This permit finaled on the web by Dane Barlow
|
First Notice | 5/14/2019 | 5/14/2019 | 6/7/2019 | | DONE |
Jim Storey
|
|
|
mailed 6-10-19
|
DOC - Permit Finaled | 5/14/2019 | 5/14/2019 | 5/14/2019 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 2/25/2013 | 2/25/2013 | 2/25/2013 | P | PART |
Jim Storey
|
|
|
Marti Phone #: ###-#### final ok pending mech and plm perm sign offs 301
|
BLD-Final | 2/22/2013 | 2/22/2013 | 2/22/2013 | P | PART |
Jim Storey
|
|
|
marty Phone #: ###-#### door hardware to be single function unlocking.
|
FIRE-Final Inspection | 2/22/2013 | 2/22/2013 | 2/22/2013 | P | PASS |
Jim Storey
|
|
|
*Re-assigned by Scott Arellano*
marty Phone #: ###-#### final ok 301
|
FIRE-Conference | 2/21/2013 | 2/21/2013 | 2/21/2013 | P | DONE |
Forrest France
|
|
|
Conference with tenant regarding life safety conditions for occupancy approval.
|
BLD-Framing/Rough-in | 1/18/2013 | 1/22/2013 | 1/22/2013 | A | PASS |
Tom Arcoraci
|
|
|
dane Phone #: ###-####
|
BLD-Framing/Rough-in | 1/17/2013 | 1/18/2013 | 1/18/2013 | P | NR |
Jim Storey
|
|
|
as late as possible - Dane Phone #: ###-####
|
BLD-Framing/Rough-in | 1/15/2013 | 1/16/2013 | 1/16/2013 | P | FAIL |
Jim Storey
|
|
|
dane Phone #: ###-#### 2 floor joist cut need floor support/ airseal needed// ele failled// iecc for shell 19 floor and walls/ 38 roof
|
(F) Reprint permit | | | 1/14/2013 | | DONE |
Tisha Gallop
|
|
|
|
Print Occupancy Form | | | 1/14/2013 | | DONE |
|
|
|
|
Telephone call | | | 1/14/2013 | | |
|
|
|
1-14-13 called Dane Barlow left message permit ready and fee given ///dld
|
Issue PAID IN FULL permit | | | 1/14/2013 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 12/24/2012 | | 1/11/2013 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - MECHANICAL | 1/9/2013 | | 1/11/2013 | | PASS |
Tim L. Woodard
|
|
|
Approved by Troy James. TLW
|
Routing - PLAN CHECK | 1/11/2013 | | 1/11/2013 | | PASS |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 1/11/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Plan resubmittals received | | | 1/9/2013 | | |
|
|
|
Received 1 copy of response letter to Troy James dated 1-6-13 from Duane Craig, 1 copy HVAC Laod Calcs, 1 copy of sheets HV-3, HV-2, HV-1 and taken to Tim Woodard's desk
|
Routing - PLAN CHECK | 12/24/2012 | | 1/2/2013 | | PEND |
Tim L. Woodard
|
|
|
12-26-12 / Sent plans to mechanical and plumbing for review. TLW 1-2-13 / Plans failed Mechanical waiting for new sheets. TLW
|
Routing - MECHANICAL | 12/28/2012 | | 12/31/2012 | | FAIL |
Troy James
|
|
|
emailed corrections to Dane Barlow
|
Routing - PUBLIC WORKS | 12/26/2012 | | 12/28/2012 | | PASS |
Beverly Mountain
|
|
|
|
Routing - PLUMBING | 12/28/2012 | | 12/28/2012 | | PASS |
Daryl Spivey
|
|
|
1. Vent floor drain at water heater.
2. Vent floor drain at RPBA backflow.
3. Per plans and 2003 UPC.
|
Routing - Addressing | 12/27/2012 | | 12/27/2012 | | PASS |
Jason C. Taylor
|
|
|
|
Plan resubmittals received | | | 12/26/2012 | | |
|
|
|
12-24-12 received 2 commercial HVAC loads & 3 copies of sheets P-1,P-2,HV-1,HV-2 sent to Tim W.
|
Plan Modification Accepted | | | 12/24/2012 | | |
|
|
|
12-24-12 plan modification excepted for BLD12-02727 to To eliminate two office spaces to create an open salon, add a working space and break room where another office was located. Add sinks to back room, and janitorial closet sheet affected A-1
|
Plan assigned to (TLW) | 11/13/2012 | | 11/30/2012 | | PASS |
Tim L. Woodard
|
|
|
Failed 1st review
|
Routing - PLAN CHECK | 11/30/2012 | | 11/30/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 11/30/2012 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/30/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 11/30/2012 | | DONE |
|
|
|
|
Telephone call | | | 11/30/2012 | | DONE |
Tisha Gallop
|
|
|
Dane Barlow called, told him permit is ready and fee due.
|
Permit Ready to Issue | | | 11/30/2012 | | DONE |
Tisha Gallop
|
|
|
|
Issue PAID IN FULL permit | | | 11/30/2012 | | DONE |
Tisha Gallop
|
|
|
|
CHANGE ISSUED DATE | | | 11/30/2012 | | DONE |
|
|
|
|
CHANGE ISSUED DATE | | | 11/30/2012 | | DONE |
Darla L Downs
|
|
|
|
Plan resubmittals received | | | 11/21/2012 | | DONE |
Christina Prado
|
|
|
Received two sets of plans marked G-1 & A-2 as well as 2 sets Lighting Compliance sheets; gave to Tim for further review
|
Plan assigned to (CDM) | 10/25/2012 | 10/25/2012 | 11/13/2012 | | DEFR |
Carl D Madsen
|
|
|
Plans Deferred to Tim W.
|
Routing - PLAN CHECK | 10/29/2012 | | 11/13/2012 | | FAIL |
Carl D Madsen
|
|
|
Failed 1st Review. Refer to plan review report. TLW
|
1st review completed | | | 11/13/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PUBLIC WORKS | 10/25/2012 | | 10/29/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Rating | 10/29/2012 | | 10/29/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 10/26/2012 | | 10/26/2012 | | PASS |
April Wing
|
|
|
|
Application received | | 10/11/2012 | 10/25/2012 | | DONE |
Tisha Gallop
|
|
|
|
Intake Approval | | | 10/25/2012 | | PASS |
Tim L. Woodard
|
|
|
Stamped plans submitted on 10-25. TLW
|
Plans ACCEPTED BY PLAN TECH | | | 10/18/2012 | | DONE |
Tisha Gallop
|
|
|
need arch and eng seal on plans///received stamped plans on 10/25/12
|
Recd Pcfee & Taken To Pln CK | | | 10/18/2012 | | DONE |
Tisha Gallop
|
|
|
|