Case Summary (BLD) | | | 6/21/2017 | | DONE |
|
|
|
emailed to Lisa G in email after she requested the summary
|
BLD-Final | 11/19/2012 | 11/21/2012 | 11/21/2012 | P | DONE |
Tony Young
|
|
|
BEN Phone #: ###-####,, c of c issued
|
DOC - Permit Finaled | 11/21/2012 | 11/21/2012 | 11/21/2012 | P | PASS |
Tony Young
|
|
|
|
CHANGE STATUS TO (FNL) | | | 11/21/2012 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 10/29/2012 | 10/29/2012 | 11/2/2012 | P | DONE |
Tony Young
|
|
|
ben please call for acess Phone #: ###-####
|
BLD-Energy code compliance | 10/31/2012 | 10/31/2012 | 10/31/2012 | P | DONE |
Tony Young
|
|
|
ben please call for acess Phone #: ###-####,, energy n/a,, insulation added where possible
|
BLD-Framing/Rough-in | 10/30/2012 | 10/30/2012 | 10/30/2012 | P | PASS |
Tony Young
|
|
|
ben please call for acess Phone #: ###-####
|
BLD-Framing/Rough-in | 10/18/2012 | 10/18/2012 | 10/18/2012 | P | FAIL |
Tony Young
|
|
|
Ben Olson Phone #: ###-####,,, correction posted,, no cover allowed
|
BLD-Framing/Rough-in | 10/17/2012 | 10/18/2012 | 10/18/2012 | A | NR |
Tony Young
|
|
|
Ben Olson Phone #: ###-####,, need trades signed off 1st
|
Application received | | 10/12/2012 | 10/12/2012 | | DONE |
Barbara Stitt
|
|
|
|
Routing Walk-In (Zoning) | 10/12/2012 | 10/12/2012 | 10/12/2012 | A | PASS |
Colleen T Carroll
|
|
|
Existing dwelling is a 0 lot line. Deck existing repair only.
|
Routing Walk-In (BLD) | 10/12/2012 | 10/12/2012 | 10/12/2012 | A | FAIL |
Carl D Madsen
|
|
|
Needs existing vs new construction
|
Case Summary (BLD) | | | 10/12/2012 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/12/2012 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/12/2012 | | 10/12/2012 | | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 10/12/2012 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/12/2012 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 10/12/2012 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 10/12/2012 | | DONE |
Barbara Stitt
|
|
|
|