Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD12-02734
StatusFinaled
Name IND SCHOOL DIST OF BOISE CITY
Site Address 701 E BOISE AVE
Project NameTIMBERLINE HS PRESSBOX & BLEAC
Customer Number 
ePlanReviewNo
Description
TIMBERLINE HS PRESSBOX & BLEACHERS- Remove existing bleachers & press box; prepare site for accessible route compliance; add water hydrant; support structure for new bleachers and press box; new bleachers complying with per ICC 300-07 Standard with 8 wheel chair accessible spaces with adjacent companion seating; and electrical work. Structural plan submittal for bleachers and press box are deferred submittals to be provided by contractor awarded the project. Work on bleacher installation cannot begin until required plans to show compliance with ICC 300 have been submitted, reviewed and approved. drs/SRZ
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  6/24/2013 DONE
DetailsBarbara Stitt
Second Notice 6/13/20136/4/2013 DONE
First Notice 4/26/20136/3/2013 DONE
Faxed 6-3-13
Print Occupancy Form  4/16/2013 DONE
DetailsTisha Gallop
Permanent Occupancy  4/16/2013 DONE
DetailsTisha Gallop
BLD-Final4/15/20134/15/20134/15/2013PPASS
DetailsJim Storey
jim Phone #: ###-####
DOC - Permit Finaled4/15/20134/15/20134/15/2013PPASS
DetailsJim Storey
BLD-Final4/9/20134/9/20134/9/2013PFAIL
DetailsJim Storey
jim Phone #: ###-#### min 1 1/2 handrail// min 12 extention top handrail.
FIRE-Final Inspection4/9/20134/9/20134/9/2013PPASS
DetailsForrest France
Life safety inspection passed with the exception of one item- plan note #8 on sheet A1.2 must be provided prior to occupancy. Contractor to post fire extinguisher as discussed.
BLD-Framing/Rough-in3/5/20133/5/20133/5/2013PPASS
DetailsJim Storey
dave Phone #: ###-#### sam to address ada route w/arch pending
Telephone call  3/5/2013 DONE
DetailsSam Zahorka
Spoke with the architect David Blueker. Asked about the accessible route from the ticket booth to the hard suface that connects the accessible parking and the material being used as the floor surface for the accessible route pathway. He stated he would preform a site visit but it was his understanding they just have not completed that portion of walkway yet and the pathway material will be verified for compliance. He stated he would call me back after he investigates.
BLD-Concrete2/21/20132/22/20132/22/2013PPASS
DetailsJim Storey
Around 1 for Rebar - Jim Phone #: ###-#### si report pending
Plan resubmittals received  2/11/2013  
Received 2 copies of sheets Cover sheet, Section view @ home plate, Section view @ first and third plate, Seating layout @first base, Seating layout @ home base, Seating layout @ third base, Detail page, 2 copies of Structural calculations and taken to Sam Zahorka as a Deferred subittal
Plan Reviewer's activity  2/11/2013 DONE
DetailsSam Zahorka
Deferred submittal for Bleachers are in compliance with ICC-300. Plans and calculations taken to permit counter for issuance.
Telephone call  2/11/2013 DONE
DetailsBarbara Stitt
Called Dave Allen Construction and told them that the deferred submittal plans are ready for pick up//2-11-13
Plan resubmittals received  2/7/2013  
Recieved 2 copies of sheets Cover sheet, Section view @ home Plate, Section view @ First base & third base, Seating Layout at First base, Seating Layout @ Home Plate, Seating Layout @ Third Base, Detail Page and routed to Sam Zahorka as a Defered submittal per his request
Issue PAID IN FULL permit  12/31/2012 DONE
DetailsBarbara Stitt
OVERRIDE  11/19/2012  
Plan assigned to (DRS)10/15/201210/15/201211/19/2012 PASS
DetailsDan Stuart
Routing - PLAN CHECK11/1/2012 11/19/2012 PASS
DetailsDan Stuart
Approved with all plan review comments & conditions of all agencies and deferred submittals for bleacher structural design and code compliance with ICC 300.
PLANS/APPL TAKEN TO FRONT DESK  11/19/2012 PASS
Print Occupancy Form  11/19/2012 DONE
DetailsBarbara Stitt
Telephone call  11/19/2012 DONE
DetailsChristina Prado
called David to advise permit is ready and GC/RCE & Rp are required prior to issuance. Also gave fees due
Permit Ready to Issue  11/19/2012 DONE
DetailsChristina Prado
Plan resubmittals received  11/16/2012  
Received 1 plan review response letter dated 11-13-12 from David Blenker to Dan Stuart, 2 copies of letter to Dan Stuart dated 11-5-12 from Chris Wendrowski regarding restroom use, 1 copy of plan review report, 2 copies of sheet G0.1, A1.2 inserted and taken back to Dan Stuart
Routing - PLAN CHECK10/29/2012 11/1/2012 FAIL
DetailsDan Stuart
Copy of review emailed to architect.
Plan resubmittals requested  11/1/2012 DONE
DetailsDan Stuart
Need to address plumbing fixture requirements and availability per chapter 29 IBC for A5 occupancy use group.
Plan resubmittals requested  11/1/2012 DONE
Plan review e-mailed to architect.
Routing - FIRE10/25/2012 10/29/2012 PASS
DetailsScott Arellano
Plans are approved as shown. No separate Fire Comments attached.
1st review completed  10/29/2012 FAIL
Failed plan check.
Telephone call  10/25/2012 DONE
DetailsDan Stuart
Called David Bleuker concerning plumbing fixtures required for A5 occupancy. Waiting for response.
Routing - PLAN CHECK10/19/2012 10/25/2012 FAIL
DetailsDan Stuart
Routing to fire code analyst for review. Need information on plumbing fixture's compliance per chapter 29 IBC for A5 occupancy.
Routing - PLUMBING  10/19/2012 PASS
DetailsBill VanDegrift
New water line hydrant. Cap existing sewer line. ADDITIONAL CROSS CONNECTION PROTECTION MAY BE REQUIRED
Routing - PLANNING10/15/2012 10/18/2012 PASS
DetailsSue Cummings
Routing - Erosion and Sediment10/18/2012 10/18/2012 PASS
DetailsKimberly M. Johnson
Routing - PLANNING Land Div10/15/2012 10/15/2012 PASS
DetailsTodd Tucker
Pending Assignment by JCB10/12/2012 10/15/2012 DONE
DetailsJason Blais
Application received 10/12/201210/12/2012 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  10/12/2012 DONE
DetailsBarbara Stitt
Intake Approval  10/12/2012 PASS
DetailsCarl Westfall
Recd Pcfee & Taken To Pln CK  10/12/2012 DONE
DetailsBarbara Stitt