Third Notice | | 8/4/2013 | 8/8/2013 | | DONE |
|
|
|
|
Print Statement | | | 8/8/2013 | | DONE |
Tisha Gallop
|
|
|
mailed to Diversified Range Enterprises
|
Second Notice | | 7/13/2013 | 7/30/2013 | | DONE |
|
|
|
|
First Notice | | 6/10/2013 | 7/3/2013 | | DONE |
|
|
|
|
BLD-Final | 5/30/2013 | 5/31/2013 | 5/31/2013 | A | PASS |
Tom Arcoraci
|
|
|
call before to meet//Jason Phone #: ###-####
|
Permanent Occupancy | | | 5/31/2013 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 5/29/2013 | 5/30/2013 | 5/30/2013 | A | NR |
Tom Arcoraci
|
|
|
call before to meet//Jason Phone #: ###-####
|
FIRE-Final Inspection | 5/29/2013 | 5/29/2013 | 5/29/2013 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 5/16/2013 | 5/17/2013 | 5/17/2013 | A | FAIL |
Troy Cobbley
|
|
|
No city approved plans/documents on site for inspection.
|
Zoning Approval | 5/16/2013 | 5/16/2013 | 5/16/2013 | | DONE |
Cody Riddle
|
|
|
|
BLD-Final | 5/13/2013 | 5/14/2013 | 5/14/2013 | A | NR |
Tom Arcoraci
|
|
|
jason Phone #: ###-####
|
DOC - Permit Finaled | 5/14/2013 | 5/14/2013 | 5/14/2013 | P | CANC |
Tom Arcoraci
|
|
|
|
BLD-Concrete | 3/7/2013 | 3/8/2013 | 3/8/2013 | A | PASS |
Tom Arcoraci
|
|
|
Request for rebar inspection for this project Phone #: ###-#### >> Inspection requested via web by Jennifer Osterburg pending mti spec insp
|
OVERRIDE | | | 11/30/2012 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 11/30/2012 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 11/30/2012 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 11/30/2012 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 11/27/2012 | | DONE |
|
|
|
Spoke with Jennifer, need RP, ACHD Letter, and GC forn - fee amount given (value staying the same, GC submitted project)
|
1st review completed | | | 11/26/2012 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/26/2012 | | DONE |
John Menard
|
|
|
|
Plan assigned to (JCM) | 11/19/2012 | | 11/26/2012 | | PASS |
John Menard
|
|
|
|
Routing PW Drainage | 11/19/2012 | | 11/26/2012 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLAN CHECK | 11/19/2012 | | 11/21/2012 | | PASS |
John Menard
|
|
|
|
Route to Impact Fee Review | 11/19/2012 | 11/23/2012 | 11/20/2012 | | PASS |
Cindy M. Gould
|
|
|
Open sided picnic shelter no impact fees
|
Routing - FIRE | 11/19/2012 | 11/19/2012 | 11/20/2012 | | PASS |
Scott Arellano
|
|
|
No comments attached with plans.
|
Pending Assignment by JCM | 11/19/2012 | | 11/19/2012 | | DONE |
John Menard
|
|
|
|
Routing - Erosion and Sediment | 11/19/2012 | | 11/19/2012 | | PASS |
Kimberly M. Johnson
|
|
|
waiver approved
|
Routing - PUBLIC WORKS | 11/19/2012 | | 11/19/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 11/19/2012 | | 11/19/2012 | | PASS |
April Wing
|
|
|
|
Routing - PLANNING Land Div | 11/19/2012 | | 11/19/2012 | | PASS |
Dave Abo
|
|
|
Parcel over 5 acres in size.
|
Routing - PLANNING | 11/19/2012 | | 11/19/2012 | | PASS |
Cody Riddle
|
|
|
The park is zoned A-1. The structure/concrete work is an allowed use within the park.
|
Payment Received | | | 11/16/2012 | | DONE |
|
|
|
Payment received via Govolutions
|
Intake Approval | | | 11/16/2012 | | PASS |
|
|
|
Approved the Plan Intake Review.
|
Intake Approval | | | 11/1/2012 | | FAIL |
|
|
|
A Registered Design Professional in Responsible Charge is an Idaho Licensed Architect or Engineer. Please revise the form to show a qualified person.
The drawings suggest that Special Inspection may be required for some activities. The structural drawings and calculations are stamped by a David Dayton. Please have him fill out, sign, and stamp the Special Inspection form.
|
Intake Approval | | | 10/30/2012 | | FAIL |
|
|
|
Note the circled items on the plan intake form. Need registered design professional form and statement of Special Inspections form. CJW
|
Intake Approval | | | 10/17/2012 | | FAIL |
|
|
|
Jennifer,
I was unable to do a plan intake review on your project (BLD12-02742) because the submission was incomplete. Please find attached a copy of Form #502 (New Commercial Plan Intake Submittal Checklist). Please consider each item and make sure it is provided and uploaded if applicable. I have tried to identify those items that are applicable by circling them. I have also included a contact sheet so that you know who to call with your questions. Please upload the filled out checklist into the “Documents” folder after you have completed it.
I have also included a copy of the ePlanReview standards for your review. I moved the structural calcs and the fire extinguisher letter to the “Documents” folder and deleted them from the “Drawings” folder. Please follow those standards.
After you have verified that your submission is complete, please finish your task in ePlanReview so that it will come back to me and I can do the plan intake review. Thanks.
Carl J. Westfall
Boise City IBC Plans Examiner
|
Application received | | | 10/12/2012 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 12 2012 3:35PM
|