Permanent Occupancy | | | 8/19/2013 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 5/17/2013 | 5/20/2013 | 5/20/2013 | P | PASS |
Jim Storey
|
|
|
call before going out//Erin Phone #: ###-####
|
FIRE-Final Inspection | 5/7/2013 | 5/8/2013 | 5/9/2013 | P | PASS |
Forrest France
|
|
|
Life safety final okay pending approved style lever hardware is provided at the back exit- to be verified at structural final as agreed. Stairway gate has been secured open.
|
FIRE-Final Inspection | 4/4/2013 | 4/4/2013 | 4/4/2013 | P | NR |
Forrest France
|
|
|
Final pending corrections
|
BLD-Final | 4/2/2013 | 4/3/2013 | 4/3/2013 | P | NR |
Tony Young
|
|
|
erin - call prior to meet Phone #: ###-####,, conf only
|
FIRE-Final Inspection | 4/2/2013 | 4/3/2013 | 4/3/2013 | A | FAIL |
Forrest France
|
|
|
Correction items include; provide approved hardware at the front and back exit doors, post "door to remain...." signage, remove the gate at the interior stairway.
|
Issue PAID IN FULL permit | | | 3/26/2013 | | DONE |
Christina Prado
|
|
|
mailed to applicant
|
Plan assigned to (TLW) | 10/17/2012 | | 10/19/2012 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 10/19/2012 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/19/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 10/19/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Telephone call | | | 10/19/2012 | | DONE |
Christina Prado
|
|
|
Called Erin to advise permit is ready
|
Print Occupancy Form | | | 10/19/2012 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 10/19/2012 | | DONE |
Christina Prado
|
|
|
|
Routing - PLAN CHECK | 10/17/2012 | | 10/18/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/17/2012 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/17/2012 | | DONE |
Christina Prado
|
|
|
|
First Notice | | 8/29/2013 | | | |
|
|
|
|
Application received | | 10/17/2012 | | | |
|
|
|
|