Second Notice | | 3/1/2013 | 2/28/2013 | | DONE |
|
|
|
This permit finaled on the web by John Schafer
|
First Notice | | 2/10/2013 | 2/19/2013 | | DONE |
|
|
|
|
BLD-Final | 1/31/2013 | 1/31/2013 | 1/31/2013 | P | CANC |
Jim Storey
|
|
|
Greg Phone #: ###-####
|
Permanent Occupancy | | | 1/31/2013 | | DONE |
Christina Prado
|
|
|
|
Meeting | | | 1/29/2013 | | DONE |
Tisha Gallop
|
|
|
Per Bill V. no plumbing permit required for this project. Initial plumbing value given was for scope that does not require a permit.
|
Plan Reviewer's activity | | | 1/29/2013 | | DONE |
Sam Zahorka
|
|
|
No Plumbing signature sign-off required per Bill Vandegrift.
|
BLD-Final | 1/24/2013 | 1/25/2013 | 1/25/2013 | A | PASS |
Jim Storey
|
|
|
greg Phone #: ###-#### final ok pending ele sign off.
|
FIRE-Final Inspection | 1/24/2013 | 1/25/2013 | 1/25/2013 | A | PASS |
Forrest France
|
|
|
Fire life safety inspection completed acceptable.
|
FIRE-Conference | 1/24/2013 | 1/24/2013 | 1/24/2013 | P | DONE |
Forrest France
|
|
|
Contact Greg on site re: fire life safety insp.
|
BLD-Ceiling Grid Inspection | 1/10/2013 | 1/11/2013 | 1/11/2013 | A | PASS |
Jim Storey
|
|
|
entrance at 3031 Elder - Greg Phone #: ###-####
|
FIRE-Sprinkler Rough-in | 1/10/2013 | 1/10/2013 | 1/10/2013 | A | PART |
Forrest France
|
|
|
Scope of fire sprinkler system modifications are approved for cover at the remodel area grid ceilings.
|
Issue PAID IN FULL permit | | | 11/30/2012 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (SRZ) | 11/15/2012 | 11/15/2012 | 11/27/2012 | | PASS |
Sam Zahorka
|
|
|
resubmittal
|
Routing - PLAN CHECK | 11/15/2012 | | 11/27/2012 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/27/2012 | | DONE |
Sam Zahorka
|
|
|
|
Permit Ready to Issue | | | 11/27/2012 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 11/27/2012 | | DONE |
Tisha Gallop
|
|
|
called Greg Toolson and left mssg permit is ready, new fees, and need GC/rce form
|
Plan resubmittals received | | | 11/15/2012 | | DONE |
Tisha Gallop
|
|
|
received two copies of letter from architect, plan sheets A3.0, A4.0, M0.00, M1.11, M2.11, M3.00, M4.00, revised cert of value (reduced scope of work); taken to Sam Zahorka with plans that are in drawer in RDY status. Routed to SRZ and changed to REV status.
|
Routing - PLAN CHECK | 10/18/2012 | | 10/25/2012 | | PASS |
Sam Zahorka
|
|
|
|
Plan assigned to (SRZ) | 10/19/2012 | | 10/25/2012 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/25/2012 | | DONE |
Sam Zahorka
|
|
|
|
Routing - FIRE | | | 10/25/2012 | | PASS |
Sam Zahorka
|
|
|
"To be field verified"
|
1st review completed | | | 10/25/2012 | | DONE |
Sam Zahorka
|
|
|
|
Print Occupancy Form | | | 10/25/2012 | | DONE |
|
|
|
|
Telephone call | | | 10/25/2012 | | DONE |
Christina Prado
|
|
|
Called Greg to advise permit is ready, gave fees due, GC is needed
|
Permit Ready to Issue | | | 10/25/2012 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (TLW) | | | 10/19/2012 | | DONE |
Tim L. Woodard
|
|
|
Reassigned to Sam Z.
|
Routing - PUBLIC WORKS | 10/17/2012 | | 10/18/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Application received | | 10/17/2012 | 10/17/2012 | | DONE |
Christina Prado
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/17/2012 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 10/17/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/17/2012 | | DONE |
Christina Prado
|
|
|
|
Routing - Addressing | 10/17/2012 | | 10/17/2012 | | PASS |
April Wing
|
|
|
|