Plan assigned to (CDM) | 12/4/2012 | 12/4/2012 | 12/17/2012 | | DONE |
Carl D Madsen
|
|
|
|
BLD-Final | 12/10/2012 | 12/10/2012 | 12/10/2012 | P | PASS |
Jim Sly
|
|
|
Jed Phone #: ###-#### OK for Perm Occ.
|
FIRE-Final Inspection | 12/7/2012 | 12/10/2012 | 12/10/2012 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
Permanent Occupancy | | | 12/10/2012 | | DONE |
Tisha Gallop
|
|
|
|
CHANGE STATUS TO (ISS) | | | 12/7/2012 | | DONE |
Tisha Gallop
|
|
|
picked up city approved revised floor plan
|
Telephone call | | | 12/5/2012 | | DONE |
Tisha Gallop
|
|
|
called Michael Reich and told him need to come pick up revised floor plan and reschedule inspections.
|
Case Summary (BLD) | | | 12/5/2012 | | DONE |
|
|
|
|
Plan resubmittals received | | | 12/4/2012 | | DONE |
Christina Prado
|
|
|
received two sets of revised floor plans; gave to carl for review
|
FIRE-Final Inspection | 11/19/2012 | 11/20/2012 | 11/20/2012 | A | FAIL |
Troy Cobbley
|
|
|
All life safety items are ok except the floor plan needs to be resubmitted showing the actual wall layout. It appears some of this tenants area is now in the adjoining tenants area.
|
FIRE-Final Inspection | 10/31/2012 | 10/31/2012 | 10/31/2012 | P | CANC |
Troy Cobbley
|
|
|
JED Phone #: ###-#### CARISSA called to canc this inspection ///dld
|
BLD-Final | 10/26/2012 | 10/30/2012 | 10/30/2012 | A | NR |
Jim Sly
|
|
|
Carissa Phone #: ###-####
Need fire final
|
FIRE-Final Inspection | 10/26/2012 | 10/29/2012 | 10/29/2012 | P | FAIL |
Troy Cobbley
|
|
|
Provide city approved plans for inspection, provide access to all rooms. I noted that the thumbturn lock will need to be removed at the tenant door and the sticker provided. I also spoke to Carissa about providing code compliant hardware for the double doors at the building main exit/ground floor.
|
Telephone call | | | 10/26/2012 | | DONE |
Christina Prado
|
|
|
Called MIchael to advise permit is ready for pick up
|
Print Occupancy Form | | | 10/26/2012 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 10/26/2012 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 10/26/2012 | | DONE |
|
|
|
|
Plan assigned to (CDM) | | 10/18/2012 | 10/25/2012 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 10/18/2012 | | 10/25/2012 | | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 10/25/2012 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/25/2012 | | |
|
|
|
|
Case Summary (BLD) | | | 10/25/2012 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/18/2012 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/18/2012 | | DONE |
Christina Prado
|
|
|
|
Routing - Addressing | 10/18/2012 | | 10/18/2012 | | PASS |
April Wing
|
|
|
Spoke to tenant and verfied the ste number
|
Routing - PUBLIC WORKS | 10/18/2012 | | 10/18/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Rating | 10/18/2012 | | 10/18/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Application received | | 10/18/2012 | | | |
|
|
|
|
Routing - PLAN CHECK | 12/4/2012 | | | | |
Carl D Madsen
|
|
|
|