Third Notice | | 6/9/2013 | 6/7/2013 | | DONE |
Christina Prado
|
|
|
complete 6-7-13
|
Print Statement | | | 6/7/2013 | | DONE |
Christina Prado
|
|
|
|
Second Notice | | 5/3/2013 | 6/4/2013 | | DONE |
|
|
|
|
First Notice | | 3/25/2013 | 4/23/2013 | | DONE |
Christina Prado
|
|
|
mailed 4-23-13
|
BLD-Final | 3/15/2013 | 3/15/2013 | 3/15/2013 | A | PASS |
Mike Jordan
|
|
|
ok for perm occ. OPen electrical permit should not be attched to this permit. It is for lighting upgrade not part of this scope of work.
|
Permanent Occupancy | | | 3/15/2013 | | DONE |
|
|
|
|
BLD-Conference | 2/4/2013 | 2/5/2013 | 2/5/2013 | A | DONE |
Mike Jordan
|
|
|
john Phone #: ###-####. Contractor to remove screws from upstairs walls that were installed into grid and provide support to the structure.
|
Zoning Approval | 2/4/2013 | 2/4/2013 | 2/4/2013 | | PASS |
Josh Wilson
|
|
|
|
BLD-Final | 2/1/2013 | 2/1/2013 | 2/1/2013 | P | PART |
Mike Jordan
|
|
|
john Phone #: ###-####. ok for temp. occ.
|
FIRE-Final Inspection | 1/31/2013 | 2/1/2013 | 2/1/2013 | A | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
Temporary Occupancy | 2/1/2013 | 5/2/2013 | 2/1/2013 | | DONE |
Darla L Downs
|
|
|
|
FIRE-Conference | 1/30/2013 | 1/31/2013 | 1/31/2013 | A | PASS |
Troy Cobbley
|
|
|
I finished the life safety inspection. Life safety can be signed off when the project related fire alarm permit is finaled.
|
FIRE-Final Inspection | 1/29/2013 | 1/30/2013 | 1/30/2013 | A | CANC |
Troy Cobbley
|
|
|
John Mead Phone #: ###-####
|
FIRE-Final Inspection | 1/28/2013 | 1/29/2013 | 1/29/2013 | A | FAIL |
Troy Cobbley
|
|
|
John and I went over the life safety requirements. Three exit doors need to be provided with single action hardware and all exit signs and emergency lights need to be repaired and tested. I received clarification from Carl Westfall that exit discharge lights are not required and that the exising fire doors are not required either. Fire extinguisher placement is ok. Gate has 20'-0" clearance. Address is installed in two locations.
|
BLD-Conference | 1/16/2013 | 1/17/2013 | 1/17/2013 | A | PART |
Tom Arcoraci
|
|
|
John Phone #: ###-#### no inspections made a meeting with all inspectors about final inspection issues would be prudent
|
Plan assigned to (CJW) | 10/26/2012 | 10/26/2012 | 11/26/2012 | | PASS |
Carl Westfall
|
|
|
PRIMARY WEAPONS SYSTEMS (20 days Nov. 21)
|
Routing PW Sewer Rating | 11/23/2012 | | 11/26/2012 | | PASS |
Connie Baumgartner
|
|
|
Number of fixtures may have changed.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/26/2012 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/26/2012 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 11/26/2012 | | DONE |
Tisha Gallop
|
|
|
|
Issue PAID IN FULL permit | | | 11/26/2012 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | 11/19/2012 | | 11/23/2012 | | PASS |
Carl Westfall
|
|
|
Drawings approved with "red lines".
|
Routing PW Environmental | 11/23/2012 | | 11/23/2012 | | PASS |
Walt Baumgartner
|
|
|
|
Plan resubmittals received | | | 11/19/2012 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/26/2012 | | 11/15/2012 | | FAIL |
Carl Westfall
|
|
|
Completed the 1st IBC plan review. Response required.
|
1st review completed | | | 11/15/2012 | | FAIL |
|
|
|
Failed Environmental and Building.
|
Routing - FIRE | 10/26/2012 | | 11/7/2012 | | PASS |
Scott Arellano
|
|
|
Comments included with plans.
|
Routing - Addressing | 10/26/2012 | | 10/29/2012 | | PASS |
April Wing
|
|
|
|
Routing - PUBLIC WORKS | 10/26/2012 | | 10/29/2012 | | PASS |
Barbara Moore
|
|
|
|
Routing PW Sewer Rating | 10/29/2012 | | 10/29/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Environmental | 10/29/2012 | | 10/29/2012 | | FAIL |
Walt Baumgartner
|
|
|
Lead architect was told 8/31/12 that pretreatment program permit for metalfinishing operations was required prior to installation of equipment or startup of "parkerizing" operations. Contact Walt at ###-#### for more information.
|
Routing - Design Review | 10/26/2012 | | 10/29/2012 | | PASS |
Josh Wilson
|
|
|
OK per CZC12-00226
|
Plan Reviewer's activity | | | 10/26/2012 | | DONE |
|
|
|
Fees were verified on October 25 by Christina.
|
Intake Approval | | | 10/25/2012 | | PASS |
|
|
|
|
Intake Approval | | | 10/19/2012 | | FAIL |
Tim L. Woodard
|
|
|
Robert,
Please upload all small documents applicable to this project into the documents folder. Among those should be the checklist that will line out all other documents required. After that you will also need to make the drawings comply with the "Electronic Submittal Guide" including: all sheets must be uploaded horizontally and sheets A-511 and A-721 need to show the whole plan sheet.
Tim Woodard
Boise City Plans Examiner II
###-####
twoodard@cityofboise.org
|
Payment Received | | | 10/18/2012 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 10/18/2012 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 18 2012 1:32PM
|