Permit Information
Permit NumberBLD12-02801
StatusFinaled
Name SCHUERMAN FREDERICK M
Site Address 6046 W EMERALD ST
Project NameSt. Alphonsus Systems
Customer Number 
ePlanReviewYes
Description
(ST. ALPHONSUS SYSTEMS PROJECT CONSULTANTS) Combining two existing office tenant spaces (2,050 sq. ft. + 2,323 sq. ft.) to become one tenant office space of 4,373 sq. ft. Work includes demolition within existing vacant spaces except for existing HVAC units, new crawl space duct work, new receptacles, data and lighting fixtures, new plumbing fixtures to include two fully accessible HIS & HERS restrooms. New interior partitions, finishes, doors, frames and ADA hardware, etc. All per reviewed plans to include all plan review reports of all plan review agency and red line notes as part of the approved plans. Deferred submittal for this project relates to modification of property lines for this building being approved by Planning Land Div, Dave Abo, before a certificate of occupancy can be issued. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  10/10/2013 DONE
DetailsBarbara Stitt
Third Notice 9/3/20139/30/2013 DONE
mailed to Fred Schuerman
Third Notice 8/6/20138/29/2013 DONE
DetailsTisha Gallop
faxed to Fred Schuerman
Second Notice 7/12/20138/1/2013 DONE
Faxed 8/1/13
First Notice 6/13/20137/2/2013 DONE
DetailsBarbara Stitt
faxed 7-2-13
BLD-Final6/3/20136/3/20136/3/2013PPASS
DetailsTom Arcoraci
Dave Phone #: ###-####
BLD-Final6/3/20136/3/20136/3/2013PPASS
DetailsTom Arcoraci
Dave Phone #: ###-#### ok for perm
Permanent Occupancy  6/3/2013 DONE
DetailsChristina Prado
Temporary Occupancy5/31/20138/29/20135/31/2013 DONE
DetailsBarbara Stitt
Plan Reviewer's activity  5/29/2013 DONE
DetailsSam Zahorka
Received completed parcel consolidation record of survey. Called the inspector and informed him it's ok to issue Final C.of O based on receiving approved R.O.S. and parcel consolidation.
Plan Reviewer's activity  4/25/2013 DONE
DetailsSam Zahorka
Called the inspector Tom Arcoraci and let him know the interior lot lines have been Removed. We are still waiting for Planning and Land Division to pass ROS prior to Final occupancy.
BLD-Aging Inspection4/22/20134/22/20134/22/2013 PEND
DetailsTom Arcoraci
Temporary Occupancy2/21/20135/22/20132/21/2013 DONE
DetailsDarla L Downs
BLD-Final2/20/20132/20/20132/20/2013PPART
DetailsJim Storey
Dave Phone #: ###-#### ada signage to be on latch side of door/ papper desp. instaled// p/l to be resolved for perm. occ. per bo letter with card.
FIRE-Final Inspection2/20/20132/20/20132/20/2013PPASS
DetailsTroy Cobbley
Life safety passed. Sam and Bill Matter worked out the door hardware issues.
Plan Reviewer's activity  2/20/2013 DONE
DetailsSam Zahorka
The sliding glass doors in offices #3, #4, #9, #10, and #11 are not required means of egress doors. The door hardware is not required to comply with the 2009 IBC section 1008.1.9. This decision is based on the travel distance being 75 feet or less to an exit door. A new floor plan showing the travel distances is attached to this permit. SRZ
Telephone call  2/20/2013 DONE
DetailsSam Zahorka
Spoke with the architect and the Fire Inspector. Hardware on office sliding doors is not required to comply with means of egress hardware provisions or accessibility.
FIRE-Final Inspection2/15/20132/19/20132/19/2013AFAIL
DetailsTroy Cobbley
The door hardware issues for the sliding glass doors needs addressed. I spoke to the architect about the requirements and deferred him to plan review to revisit the requirements and if they want a re-assesment of the original plan reviewer interpretation.
FIRE-Final Inspection2/15/20132/15/20132/15/2013PCANC
DetailsTroy Cobbley
Overbooked. Dave is going to reschedule for tuesday.
BLD-Framing/Rough-in12/19/201212/20/201212/20/2012APASS
DetailsJim Sly
dave Phone #: ###-####
Permit Ready to Issue  12/19/2012 DONE
DetailsTisha Gallop
Print Occupancy Form  12/19/2012 DONE
Issue PAID IN FULL permit  12/19/2012  
Routing - PUBLIC WORKS11/21/2012 12/19/2012 PASS
DetailsConnie Baumgartner
Plan assigned to (DRS)11/6/201211/6/201212/18/2012 PASS
DetailsDan Stuart
Failed 1st review - eplanreview
Routing - PLAN CHECK11/29/2012 12/18/2012 PASS
DetailsDan Stuart
Approved with property line issue commitment letter from owner & approved by building official attached to plans.
PLANS/APPL TAKEN TO FRONT DESK  12/18/2012 PASS
DetailsDan Stuart
Plan resubmittals received  11/29/2012 PEND
Received new plan sheets A0.0, A1.1 and E1. Waiting for letter from architect and owner committing to address property line issues before a permanent C.O. can be issued.
Routing - PLAN CHECK11/27/2012 11/29/2012 FAIL
DetailsDan Stuart
Plan resubmittals provided.Waiting for letter from owner acknowledging need for plat modification and agrement to proceed to make needed modifications as required for Planning land Div., Dave Abo. A final c.O. cannot be issued until the property line issues are resolved.
Plan resubmittals requested  11/29/2012 DONE
E-mail sent to Bill Matter , Architect, concerning required letter from owner, as jason Blais, Building Official had previously disgussed with Bill Matter. Bill Matter was directed to contact Jason directly if he needed clarification about what was to be included in the letter. A copy of the email is attached to this permit.
Routing - PLANNING Land Div11/26/2012 11/27/2012 PASS
DetailsDave Abo
This is not a condominium. It is a subdivision (Emerald Professional Park). Prior to issuance of Certificate of Occupancy, a Record of Survey - Property Line Adjustment must be recorded for Building "B" that will include changes in 2009 and 2010.
1st review completed  11/27/2012 FAIL
DetailsDan Stuart
Failed plan review.
Plan resubmittals requested  11/27/2012 DONE
Copy of agency comments plan review sent to architect.
Routing - FIRE11/21/2012 11/26/2012 PASS
DetailsScott Arellano
Attached Comments to plans.
Routing - PLAN CHECK11/21/2012 11/26/2012 FAIL
DetailsDan Stuart
Resubmittals required. Copy of plan review emailed to Bill Matter and attached to permit. Pending plan review by Planning Land Div.
Routing PW Sewer Rating11/23/2012 11/23/2012 PASS
DetailsConnie Baumgartner
Routing - Addressing11/21/2012 11/21/2012 PASS
DetailsApril Wing
Intake Approval  11/6/2012 PASS
Application received  10/19/2012 DONE