Information based on query as of Wednesday, August 14, 2024.
Permit Information
Permit NumberBLD12-02808
StatusFinaled
Name INFINITY DESIGN INC
Site Address 1300 W HILL RD
Project Name 
Customer Number 
ePlanReviewYes
Description
Permit for the construction of a new 3,400 sq. ft., one story single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 389 sq. ft. of covered patio/porch and a 1,136 sq. ft. attached garage per the approved plans, plan review report, attached engineering and any notations. A letter from the applicant’s geotechnical engineer indicating that the footing sub-grade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946. R-1C zoning and setbacks per planning. CDM
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  8/19/2014 DONE
DetailsCandy A. Nichols
Case Summary (BLD)  8/19/2014 DONE
DetailsCandy A. Nichols
Case Summary (BLD)  8/19/2014 DONE
DetailsCandy A. Nichols
Permanent Occupancy  8/19/2014 DONE
DetailsCandy A. Nichols
Case Summary (BLD)  8/19/2014 DONE
DetailsCandy A. Nichols
Letter of compliance/Occupancy  8/19/2014 DONE
DetailsTisha Gallop
BLD-Final8/12/20148/12/20148/12/2014PDONE
DetailsTony Young
Larry Phone #: ###-####
DOC - Permit Finaled8/12/20148/12/20148/12/2014PPASS
DetailsTony Young
c of o issued
PubWorks Occupancy Approval8/11/20148/11/20148/11/2014 DONE
DetailsJason C. Taylor
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
BLD-Final7/22/20147/22/20147/22/2014PNR
DetailsTony Young
Larry Phone #: ###-####
BLD-Final7/21/20147/22/20147/22/2014APEND
DetailsTony Young
Larry Phone #: ###-####
BLD-Final7/15/20147/18/20147/21/2014PPEND
DetailsTony Young
Larry Phone #: ###-####
BLD-Final7/15/20147/15/20147/15/2014PPEND
DetailsTony Young
Larry Phone #: ###-####,, conf only.. need hillside approval
BLD-Final7/14/20147/15/20147/15/2014APEND
DetailsTony Young
Larry Phone #: ###-####,, need hill side 1st
BLD-Final5/20/20145/21/20145/21/2014ANR
DetailsTony Young
Al-Please call prior to inspection and as early as possible Phone #: ###-####
BLD-Energy code compliance4/3/20144/4/20144/4/2014APASS
DetailsTony Young
Larry Phone #: ###-####
Plan assigned to (CDM)6/11/20136/11/20134/4/2014 DONE
DetailsCarl D Madsen
BLD-Framing/Rough-in4/3/20144/3/20144/3/2014PPASS
DetailsTony Young
Larry Phone #: ###-####
BLD-Framing/Rough-in3/31/20144/1/20144/1/2014APART
DetailsTony Young
re inspection,, ok to insulate
BLD-Framing/Rough-in3/31/20143/31/20143/31/2014PPEND
DetailsTony Young
re inspection
BLD-Framing/Rough-in3/28/20143/31/20143/31/2014APEND
DetailsTony Young
re inspection
BLD-Framing/Rough-in3/28/20143/28/20143/28/2014PPART
DetailsTony Young
Larry Phone #: ###-####,,need plumbing rough in completed,, fire blocks,, point loads
BLD-Framing/Rough-in3/27/20143/28/20143/28/2014APART
DetailsTony Young
Larry Phone #: ###-#### ,needs full plumbing rough in,, hangers nails,, fireblocks,, point loads
Plan Modification Accepted  3/19/2014 DONE
new manual j
Routing - MECHANICAL3/19/2014 3/19/2014 PASS
DetailsTroy James
resubmitted manual j
BLD-Other1/16/20141/16/20141/16/2014PPASS
DetailsTony Young
larry - shear panel Phone #: ###-####,, exterior shear ok
BLD-Wall Bracing12/20/201312/23/201312/23/2013ANR
DetailsTony Young
larry Phone #: ###-####,, RE NAIL PER PLAN,, ok to cover roof at builders descretion
BLD-Foundation10/16/201310/17/201310/17/2013APART
DetailsTony Young
James Phone #: ###-####
CHANGE STATUS TO (ISS)  10/16/2013 DONE
DetailsBarbara Stitt
Per Carl Madsen ok to change status back issue now that sub grade approval is ok///10-16-13 BAS
BLD-Footing10/2/201310/2/201310/3/2013PPASS
DetailsTony Young
Phone #: ###-####
PubWorks Subgrade Approval9/25/20139/25/20139/25/2013 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer (MTI) indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Issue PAID IN FULL permit  4/4/2013 DONE
DetailsBarbara Stitt
Telephone call  4/2/2013 DONE
DetailsChristina Prado
Certified letter returned in mail. Called and left message with Larry @Infinity Design explaining process to extend permit if necessary or permit must be picked up prior to April 22nd to avoid expiration.
Expiration Notice3/29/20134/19/20133/29/2013 DONE
DetailsChristina Prado
OVERRIDE  2/14/2013  
Plan assigned to (CDM)11/2/201211/2/20122/14/2013 PASS
DetailsCarl D Madsen
project dox
Telephone call  2/14/2013 DONE
DetailsTisha Gallop
called Larry Keller and left vm permit is ready, fees due and need licensed RP (not homeowner).
Routing - PLAN CHECK1/10/2013 2/14/2013 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  2/14/2013  
Inspection Record Card- Bld  2/14/2013 DONE
DetailsTisha Gallop
Permit Ready to Issue  2/14/2013 DONE
DetailsTisha Gallop
Routing - MECHANICAL2/12/2013 2/12/2013 PASS
DetailsTroy James
eplan, approved with corrections
Routing - FIRE  2/8/2013 PASS
DetailsScott Arellano
Approved as shown per Boise Fire Marshal.
Routing PW Grading-Hillside1/16/2013 1/16/2013 PASS
DetailsJim Wyllie
Routing - MECHANICAL1/14/2013 1/14/2013 FAIL
DetailsTroy James
eplan
Routing - PLANNING1/10/2013 1/10/2013 PASS
DetailsDavid Moser
Routing - FIRE  1/10/2013 FAIL
*Fire department apparatus must be able to reach within 150 feet of the furthest exterior portion of this building from an approved roadway in order to comply with IFC 503.1.1.
Routing PW Grading-Hillside11/2/2012 12/4/2012 FAIL
DetailsJim Wyllie
Provide a geotechnical engineering report. Provide calculations for the drainage system. Provide a swale detail. Correct a flat area of the drainage swale along the northwest corner of the house. Plan shows a pipe beneath the driveway. Call out pipe and add inverts. Jim W. (###-####)
Routing - PLAN CHECK11/2/2012 12/3/2012 FAIL
DetailsCarl D Madsen
project dox
Routing - FIRE11/9/2012 11/9/2012 FAIL
DetailsScott Arellano
Correction item has been noted on plans.

*Fire department apparatus must be able to reach within 150 feet of the furthest exterior portion of this building from an approved roadway in order to comply with IFC 503.1.1.

*Option 1: Resubmit plans indicating the furthest exterior portion of the residence to be within 150 feet of the common driveway entrance located at Hill Road, as measured around the exterior of the structure. Or

*Option 2: Resubmit plans indicating an acceptable code alternate, such as the installation of an approved fire sprinkler system, designed in accordance with NFPA 13D.
Routing - MECHANICAL11/2/2012 11/7/2012 FAIL
DetailsTroy James
eplan
Routing - Erosion and Sediment11/2/2012 11/6/2012 PASS
DetailsKimberly M. Johnson
Route to Impact Fee Review11/2/201211/7/201211/5/2012 PASS
DetailsCindy M. Gould
credit for demo permit BLD12-02022
Routing PW Sewer Rating11/2/2012 11/5/2012 PASS
DetailsConnie Baumgartner
Routing - PLANNING11/2/2012 11/5/2012 FAIL
DetailsDavid Moser
Failed; the ROS is not complete. The application must be routed to the land division for review.
Routing - Addressing11/2/2012 11/5/2012 PASS
DetailsApril Wing
Routing - PUBLIC WORKS11/2/2012 11/5/2012 PASS
DetailsConnie Baumgartner
Recd Pcfee & Taken To Pln CK  11/2/2012 DONE
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  11/2/2012 DONE
DetailsTisha Gallop
1st review completed  11/2/2012 DONE
Intake Approval  11/1/2012 PASS
DetailsTisha Gallop
Telephone call  10/23/2012 DONE
DetailsTisha Gallop
called Larry and told him if done uploading documents and plans he needs to sign off on task for prescreen to begin.
Intake Approval  10/23/2012 FAIL
DetailsTisha Gallop
Application received  10/22/2012 DONE
Application submitted via PDS Online on Oct 22 2012 9:15AM
First Notice 8/29/2014   
Routing - PLAN CHECK6/11/2013    
DetailsCarl D Madsen