Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD12-02821
StatusFinaled
Name BOISE HUNTER HOMES
Site Address 2848 S PALMATIER WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 2608 sq. ft., two story (first story 2019 sq. ft., second story 589 sq. ft.) single family dwelling with 5 bedrooms, 3 bathrooms, approximately 575 sq. ft. of covered patio/porch and a 683 sq. ft. attached garage per the approved plans, plan review report and any notations. This structure is located in WUI zone B and requires a class A fire rated roofing material. SP-01 zoning and setbacks per planning. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled  12/29/2015 DONE
pass 6-21-13
BLD-Final6/20/20136/21/20136/21/2013ADONE
DetailsTony Young
Rollo-Dave please let Barb @ permit desk for bond release they need landscaping and driveway installed thanks Phone #: ###-####
BLD-Final2/25/20132/25/20132/25/2013PFAIL
DetailsJim Sly
Rollo Phone #: ###-####
Need hard surfaced driveway.
BLD-Energy code compliance1/4/20131/7/20131/7/2013APASS
DetailsDave Hannah
Rollo Phone #: ###-####
BLD-Framing/Rough-in1/3/20131/3/20131/3/2013PPASS
DetailsDave Hannah
Rollo Phone #: ###-####
BLD-Framing/Rough-in1/2/20131/3/20131/3/2013ANR
DetailsDave Hannah
Rollo Phone #: ###-#### no truss engineering on site
BLD-Wall Bracing12/12/201212/12/201212/12/2012PPASS
DetailsDave Hannah
rollo Phone #: ###-####
BLD-Foundation11/16/201211/20/201211/20/2012APART
DetailsMike Jordan
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD-Footing11/16/201211/19/201211/19/2012PNR
DetailsTom Arcoraci
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
Issue PAID IN FULL permit  11/15/2012 DONE
DetailsChristina Prado
OVERRIDE  11/13/2012  
Inspection Record Card- Bld  11/13/2012 DONE
Telephone call  11/13/2012 DONE
DetailsChristina Prado
called Bryan to advise permit is ready and gave fees due
Permit Ready to Issue  11/13/2012 DONE
DetailsChristina Prado
Plan assigned to (CDM)10/23/201210/23/201211/10/2012 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK  11/10/2012 PASS
DetailsCarl D Madsen
1st review completed  11/10/2012 DONE
PLANS/APPL TAKEN TO FRONT DESK  11/10/2012  
Case Summary (BLD)  11/10/2012 DONE
Routing - PLANNING11/2/2012 11/2/2012 PASS
DetailsDavid Moser
route to Carl M.
Routing - MECHANICAL10/26/2012 11/2/2012 PASS
DetailsTroy James
Plan resubmittals received  10/31/2012 DONE
DetailsTisha Gallop
received two full new sets of plans in response to planning reveiw; put with plans in Mechanical review.
Routing - PLANNING10/23/2012 10/26/2012 FAIL
DetailsColleen T Carroll
Failed; The building does not provide 22 feet of backup from the garage with the 3 foot landscape buffer
Route to Impact Fee Review10/23/201210/26/201210/25/2012 PASS
DetailsCindy M. Gould
Application received 10/23/201210/23/2012 DONE
Recd Pcfee & Taken To Pln CK  10/23/2012 DONE
Plans ACCEPTED BY PLAN TECH  10/23/2012  
Intake Approval  10/23/2012 PASS
Routing - Addressing10/23/2012 10/23/2012 PASS
DetailsApril Wing
Routing - PUBLIC WORKS10/23/2012 10/23/2012 PASS
DetailsConnie Baumgartner