Print Statement | | | 6/17/2013 | | DONE |
Tisha Gallop
|
|
|
|
Third Notice | | 6/8/2013 | 6/4/2013 | | DONE |
|
|
|
completed 6-4-13
|
Third Notice | | 4/27/2013 | 6/3/2013 | | DONE |
|
|
|
faxed
|
Second Notice | | 4/1/2013 | 4/22/2013 | | DONE |
Christina Prado
|
|
|
mailed 4-23-13
|
First Notice | | 3/1/2013 | 3/22/2013 | | DONE |
|
|
|
|
BLD-Final | 2/15/2013 | 2/19/2013 | 2/19/2013 | P | PASS |
Mike Jordan
|
|
|
bryan Phone #: ###-####. ok for perm. occ.
|
FIRE-Final Inspection | 2/15/2013 | 2/19/2013 | 2/19/2013 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
Permanent Occupancy | | | 2/19/2013 | | DONE |
|
|
|
|
BLD-Other | 1/31/2013 | 1/31/2013 | 1/31/2013 | P | PASS |
Mike Jordan
|
|
|
brian Phone #: ###-####. ceiling grid ok.
|
FIRE-Conference | 1/28/2013 | 1/29/2013 | 1/29/2013 | A | DONE |
Troy Cobbley
|
|
|
I let Brian know that the remote annunciator will need to be relocated to be within the same room as the fire alarm control panel and that a permit will be required for the work. This was verified by the plan reviewer.
|
FIRE-Conference | 1/25/2013 | 1/28/2013 | 1/28/2013 | A | DONE |
Troy Cobbley
|
|
|
Brian and I went over general life safety requirements which included door hardware on the dressing rooms, rear exit door and main exit doors. There is an issue with the placement of the existing remoter annunciator for the fire alarm system which will require me to make a return trip and involve the fire plans examiner for its final placement.
|
Print Occupancy Form | | | 1/22/2013 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 1/7/2013 | 1/8/2013 | 1/8/2013 | A | CANC |
Mike Jordan
|
|
|
Derrick Phone #: ###-####
|
BLD-Framing/Rough-in | 1/8/2013 | 1/8/2013 | 1/8/2013 | A | PASS |
Mike Jordan
|
|
|
Derrick Phone #: ###-####
|
BLD-Framing/Rough-in | 1/7/2013 | 1/7/2013 | 1/7/2013 | P | FAIL |
Mike Jordan
|
|
|
Derrick Phone #: ###-####. no approved plans on site. no inspection.
|
Print Occupancy Form | | | 11/20/2012 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 11/20/2012 | | DONE |
Tisha Gallop
|
|
|
|
Issue PAID IN FULL permit | | | 11/20/2012 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (DRS) | 11/1/2012 | 11/1/2012 | 11/19/2012 | | PASS |
Dan Stuart
|
|
|
ePlanReview case
|
Routing - PLAN CHECK | 11/1/2012 | | 11/19/2012 | | PASS |
Dan Stuart
|
|
|
Plan sheets red-lined.
|
1st review completed | | | 11/19/2012 | | PASS |
Dan Stuart
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/19/2012 | | PASS |
|
|
|
|
Routing - FIRE | 11/1/2012 | | 11/7/2012 | | PASS |
Scott Arellano
|
|
|
Attached comments to case.
|
Routing - Design Review | 11/1/2012 | | 11/2/2012 | | PASS |
Josh Wilson
|
|
|
Josh Wilson - One new exterior door at rear
|
Routing PW Sewer Rating | 11/2/2012 | | 11/2/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 11/1/2012 | | 11/2/2012 | | PASS |
April Wing
|
|
|
|
Routing - PUBLIC WORKS | 11/1/2012 | | 11/2/2012 | | PASS |
Beverly Mountain
|
|
|
|
Intake Approval | | | 11/1/2012 | | PASS |
John Menard
|
|
|
Intake passed on 10/31/12 by John Menard. Plan Review Fees paid on 11/1/12.
|
Pending Assignment by JCB | 11/1/2012 | | 11/1/2012 | | DONE |
Jason Blais
|
|
|
|
Application received | | | 10/23/2012 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 23 2012 1:56PM
|