Print Statement | | | 2/7/2014 | | DONE |
Tisha Gallop
|
|
|
mailed to Weldon Stutzman
|
Second Notice | | 1/9/2014 | 1/27/2014 | | DONE |
|
|
|
combined Bld12-02831 (shell) and Bld13-1425 (TI) to calc final values. credit given to shell permit for value pulled on TI, ok per Rita.
|
First Notice | 12/3/2013 | 12/3/2013 | 12/30/2013 | | DONE |
Tom Arcoraci
|
|
|
mailed to Weldon Stutzman
|
BLD-Final | 12/3/2013 | 12/3/2013 | 12/3/2013 | P | PASS |
Tom Arcoraci
|
|
|
Brian (Tom this is the one we spoke of yesterday, Brian M signed off this morning) Phone #: ###-####
|
BLD-Final | 12/3/2013 | 12/3/2013 | 12/3/2013 | P | PASS |
Tom Arcoraci
|
|
|
Brian (Tom this is the one we spoke of yesterday, Brian M signed off this morning) Phone #: ###-####
|
DOC - Permit Finaled | 12/3/2013 | 12/3/2013 | 12/3/2013 | P | PASS |
Tom Arcoraci
|
|
|
|
Inspection Record Card- Bld | | | 12/2/2013 | | DONE |
|
|
|
|
BLD-Final | 10/30/2013 | 10/31/2013 | 11/1/2013 | A | PART |
Tom Arcoraci
|
|
|
ok after P/W SIGNS
|
DOC - Permit Finaled | 11/1/2013 | 11/1/2013 | 11/1/2013 | P | PASS |
Tom Arcoraci
|
|
|
(This activity was added in error so we have changed the case status back to Issued.)
|
BLD-Final | 10/30/2013 | 10/30/2013 | 10/30/2013 | P | NR |
Tom Arcoraci
|
|
|
Brian Phone #: ###-####
|
BLD-Wall Bracing | 5/2/2013 | 5/2/2013 | 10/30/2013 | P | PASS |
Tom Arcoraci
|
|
|
MIKE Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 10/30/2013 | | DONE |
|
|
|
|
Zoning Approval | 10/18/2013 | 10/21/2013 | 10/21/2013 | | PASS |
Josh Wilson
|
|
|
|
FIRE-Final Inspection | 10/15/2013 | 10/15/2013 | 10/15/2013 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Energy code compliance | 7/1/2013 | 7/2/2013 | 7/2/2013 | A | PASS |
Jim Sly
|
|
|
call when done to let know how inspection went because he is out of town//Frank Phone #: ###-####
|
BLD-Framing/Rough-in | 6/27/2013 | 6/27/2013 | 6/27/2013 | P | PASS |
Tom Arcoraci
|
|
|
james Phone #: ###-####
|
Fees Due Hold | 6/13/2013 | | 6/27/2013 | | DONE |
Christina Prado
|
|
|
|
Print Statement | | | 6/12/2013 | | DONE |
|
|
|
|
Plan resubmittals received | | | 4/5/2013 | | |
|
|
|
received a statement of special inspections and taken to Sam Zahorka's desk
|
BLD-Foundation | 3/26/2013 | 3/27/2013 | 3/27/2013 | A | PASS |
Tom Arcoraci
|
|
|
jared Phone #: ###-####
|
BLD-Footing | 3/25/2013 | 3/25/2013 | 3/25/2013 | P | PASS |
Tom Arcoraci
|
|
|
frank Phone #: ###-####
|
Issue PAID IN FULL permit | | | 3/11/2013 | | DONE |
Tisha Gallop
|
|
|
|
OVERRIDE | | | 1/10/2013 | | |
|
|
|
|
Routing - PLUMBING | 1/9/2013 | | 1/10/2013 | | PASS |
Bill VanDegrift
|
|
|
3/4" cold water to the restrooms required.
|
Routing - PLAN CHECK | 1/10/2013 | | 1/10/2013 | | PASS |
Sam Zahorka
|
|
|
No electrical work is approved under this permit. Future electrical work will require separate permits and permit submittals are required to show compliance with the 2009 IECC for interior lighting power and switching compliance.
|
Telephone call | | | 1/10/2013 | | DONE |
Sam Zahorka
|
|
|
Telephoned the architect Mr. Fairchild and verified no interior lighting or switching is part of this permit. He stated this is correct so I red-lined the plans to require future permits for electrical work. The electrical work will require separate permits and permit submittals are required to show compliance with the 2009 IECC for interior lighting power and switching compliance.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/10/2013 | | DONE |
Sam Zahorka
|
|
|
|
Inspection Record Card- Bld | | | 1/10/2013 | | DONE |
|
|
|
|
Telephone call | | | 1/10/2013 | | DONE |
Christina Prado
|
|
|
Left message for Weldon giving fees due and advising permit is ready for issuance pending ACHD letter, Rp & GC form
|
Permit Ready to Issue | | | 1/10/2013 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (SRZ) | 10/24/2012 | | 1/10/2013 | | PASS |
Sam Zahorka
|
|
|
1st review complete. Corrections needed for other reviewing departments.
|
Plan resubmittals received | | | 1/8/2013 | | DONE |
Tisha Gallop
|
|
|
received three copies of plan sheets P-101 & P-102; inserted by LEG and taken back to Sam Zahorka
|
Telephone call | | | 1/3/2013 | | DONE |
|
|
|
Called and discussed project with Weldon Stutzman. He does not want this changed to a cold shell. We are going to leave this as a shell and core permit. He is going to call the plumbing engineer and have him contact Bill VanDeGrigt. Once we get the plumbing resubmittals if we need anything changed on the archtitectural plans Sam will let Mike Fairchild kknow, but the revised plumbing plans should be all we need.
|
Telephone call | | | 12/17/2012 | | DONE |
Sam Zahorka
|
|
|
Called the architect. Telephone number is no longer in service. I then called the applicant and requested he return my telephone call. Plumbing review still needs corrections prior to issuance.
|
Routing - Erosion and Sediment | 12/11/2012 | | 12/13/2012 | | PASS |
Kimberly M. Johnson
|
|
|
|
Routing - PLUMBING | 12/13/2012 | | 12/13/2012 | | FAIL |
Bill VanDegrift
|
|
|
Please address all items that were listed as corrections on the first review.
|
Routing - PUBLIC WORKS | 12/10/2012 | | 12/11/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Drainage | 12/10/2012 | | 12/11/2012 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLAN CHECK | 12/11/2012 | | 12/11/2012 | | FAIL |
Sam Zahorka
|
|
|
|
Routing Off Site - STRUCTURAL | 12/4/2012 | | 12/11/2012 | | PASS |
Sam Zahorka
|
|
|
|
1st review completed | | | 12/10/2012 | | FAIL |
|
|
|
Failed ESC, PW, Plumbing
|
Routing - PLAN CHECK | 12/10/2012 | | 12/10/2012 | | FAIL |
Sam Zahorka
|
|
|
|
Routing - FIRE | 12/6/2012 | | 12/10/2012 | | PASS |
Scott Arellano
|
|
|
Attached Comments to plans.
|
Routing - PLAN CHECK | 11/21/2012 | | 12/6/2012 | | FAIL |
Sam Zahorka
|
|
|
|
Telephone call | | | 12/4/2012 | | DONE |
Tisha Gallop
|
|
|
called Action Couriers for pick up
|
Plan resubmittals received | | | 12/3/2012 | | DONE |
Christina Prado
|
|
|
Received three sets of revised structural calcs, structural plan review comments and plans marked C-100, S-100, P-102, C-101 as well as four sets of plans marked C-102; gave to Sam for additional review
|
Routing - PUBLIC WORKS | 11/15/2012 | | 11/21/2012 | | FAIL |
Connie Baumgartner
|
|
|
Failed by Brian Murphy.
|
Routing PW Drainage | 11/16/2012 | | 11/21/2012 | | FAIL |
Brian Murphy
|
|
|
NEED REVISED COPIES
|
Routing Off Site - STRUCTURAL | 11/19/2012 | | 11/21/2012 | | FAIL |
Sam Zahorka
|
|
|
Structural Plan Check Re-review comments sent to the architect to forward to the engineer.
|
Telephone call | | | 11/19/2012 | | DONE |
Tisha Gallop
|
|
|
called Action Couriers for pick up of resubs
|
Plan resubmittals received | | | 11/16/2012 | | DONE |
Tisha Gallop
|
|
|
received response to structural comments, three copies of structural calcs and plan sheets A0.0, L1.1, C-100, C-101, A1.0, A3.0, S-100, S-101; inserted into plan by permit tech. and taken back to Brian Murphy, routed third set resubs to outside engineering.
|
Plan resubmittals received | | | 11/15/2012 | | DONE |
Tisha Gallop
|
|
|
received two copies of Storm Water Plan, O & M Plan, ESC narrative, plan sheet ESC & SWPPP Plan, and five copies of plan sheet C-102; inserted into plans by permit tech and rerouted to Public Works since Sam is out of office.
|
Routing - PLAN CHECK | 10/30/2012 | | 11/15/2012 | | PEND |
Sam Zahorka
|
|
|
rerouted to PW due to resubmittals received
|
Routing Off Site - STRUCTURAL | 10/24/2012 | | 10/31/2012 | | FAIL |
Sam Zahorka
|
|
|
|
Routing - Erosion and Sediment | 10/29/2012 | | 10/30/2012 | | FAIL |
Kimberly M. Johnson
|
|
|
Plan is missing the following elements: BMP installation details, drawings does not show swale in SE corner, construction start and finish dates, sequence of activities, erosion controls (i.e. temporary stabilization), approved inlet protection (filter fabric is not approved for DI's), waste disposal practices for fuels, paint, ect, spill prevention and control practices, ESC permit sign posting. Emailed PD 10/30
|
Routing - PLUMBING | | | 10/30/2012 | | FAIL |
Bill VanDegrift
|
|
|
1) thermol expansion protection required
2) move service protection inside building
3)vent floor drains
4) pipe t&p drain to exterior
5)size water per UPC
|
Routing - PUBLIC WORKS | 10/24/2012 | | 10/29/2012 | | FAIL |
Connie Baumgartner
|
|
|
Failed by Brian Murphy
|
Routing PW Solid Waste | 10/29/2012 | | 10/29/2012 | | PASS |
Peter J. McCullough
|
|
|
Carts only, to be taken to Bethel St. for collection.
|
Routing PW Sewer Rating | 10/29/2012 | | 10/29/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Drainage | 10/26/2012 | | 10/29/2012 | | FAIL |
Brian Murphy
|
|
|
SWALES DO NOT MEET BOISE CITY DESIGN STDS FOR INFILTRATION
|
Application received | | 10/23/2012 | 10/24/2012 | | DONE |
Tisha Gallop
|
|
|
|
Pending Assignment by JCM | 10/24/2012 | | 10/24/2012 | | DONE |
John Menard
|
|
|
|
Routing - PLANNING | | | 10/24/2012 | | PASS |
Todd Tucker
|
|
|
cva12-00033 Todd Tucker
|
Routing - PLANNING Land Div | 10/24/2012 | | 10/24/2012 | | PASS |
Todd Tucker
|
|
|
|
Telephone call | | | 10/24/2012 | | DONE |
Tisha Gallop
|
|
|
called Action Couriers for pick up
|
Routing - Design Review | 10/24/2012 | | 10/24/2012 | | PASS |
Josh Wilson
|
|
|
OK w/ redlines Sheet L1.1
|
Recd Pcfee & Taken To Pln CK | | | 10/23/2012 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/23/2012 | | DONE |
Tisha Gallop
|
|
|
|
Routing - Addressing | 10/26/2012 | | | | PASS |
|
|
|
Owner spoke to Scott A. in the Fire dept and he was okay with this new bldg keeping the current address on N Orchard St.
|