BLD-Final | 5/7/2013 | 5/7/2013 | 5/7/2013 | P | PASS |
Jim Storey
|
|
|
Ray-Please call for access info Phone #: ###-####
|
DOC - Permit Finaled | 5/7/2013 | 5/7/2013 | 5/7/2013 | P | PASS |
Jim Storey
|
|
|
|
PubWorks Occupancy Approval | 5/7/2013 | 5/7/2013 | 5/7/2013 | | DONE |
Jason C. Taylor
|
|
|
Recieved civil engineers acceptance letter for drainage conditions. A roof drainage pipe was placed on the east side of the house and was approved by P.W. C of O my be given. Jason Taylor ###-####.
|
BLD-Final | 5/3/2013 | 5/6/2013 | 5/6/2013 | A | PART |
Jim Storey
|
|
|
call for access - ray Phone #: ###-#### perimitor insulation computer rm crawl space pw sign off
|
BLD-Final | 4/26/2013 | 4/29/2013 | 4/29/2013 | P | NR |
Jim Storey
|
|
|
ray please call for access Phone #: ###-#### pending hillside pw insp.
|
BLD-Final | 4/25/2013 | 4/26/2013 | 4/26/2013 | P | DEFR |
Jim Storey
|
|
|
ray please call for access Phone #: ###-####
|
BLD-Energy code compliance | 3/7/2013 | 3/8/2013 | 3/8/2013 | A | PASS |
Jim Storey
|
|
|
Ray Phone #: ###-####
|
BLD-Framing/Rough-in | 3/7/2013 | 3/8/2013 | 3/8/2013 | A | PASS |
Jim Storey
|
|
|
Ray Phone #: ###-####
|
BLD-Framing/Rough-in | 3/4/2013 | 3/5/2013 | 3/5/2013 | P | PART |
Jim Storey
|
|
|
Ray Phone #: ###-#### mech failled// no under floor accesses// mlb floor roof support need 2-117/8 under fire place.
|
Plan resubmittals received | | | 3/5/2013 | | DONE |
|
|
|
new manual j
|
Routing - MECHANICAL | 3/5/2013 | | 3/5/2013 | | PASS |
Troy James
|
|
|
resubmitted acca report
|
BLD-Other | 2/25/2013 | 2/25/2013 | 2/25/2013 | A | PART |
Jim Storey
|
|
|
double king studs needed for framing insp.
|
BLD-Wall Bracing | 2/25/2013 | 2/25/2013 | 2/25/2013 | A | PASS |
Jim Storey
|
|
|
exterior ok to cover
|
BLD-Other | 2/15/2013 | 2/19/2013 | 2/19/2013 | A | PASS |
Jim Storey
|
|
|
under floor inspection--Carlos Phone #: ###-####
|
BLD-Footing | 2/4/2013 | 2/5/2013 | 2/5/2013 | A | PASS |
Jim Storey
|
|
|
jared Phone #: ###-####
|
BLD-Other | 1/2/2013 | 1/2/2013 | 1/2/2013 | P | PASS |
Jim Storey
|
|
|
jared- basement Phone #: ###-#### walls sealled ok to back fill.
|
BLD-Footing | 12/27/2012 | 12/28/2012 | 12/28/2012 | A | PASS |
Jim Storey
|
|
|
Jerad Phone #: ###-####
|
Routing PW Grading-Hillside | 12/20/2012 | | 12/20/2012 | | PASS |
Jim Wyllie
|
|
|
Received footing subgrade approval from geotechnical engineer. Okay to schedule a footing inspection. Jim Wyllie (###-####)
|
BLD-Footing | 12/18/2012 | 12/18/2012 | 12/19/2012 | P | PART |
Jim Storey
|
|
|
JEROD Phone #: ###-#### ft ok pendind pw sign off.
|
Plan assigned to (CDM) | 10/26/2012 | 10/26/2012 | 12/13/2012 | | DONE |
Carl D Madsen
|
|
|
Project Dox
|
OVERRIDE | | | 12/11/2012 | | |
|
|
|
|
Inspection Record Card- Bld | | | 12/11/2012 | | DONE |
Barbara Stitt
|
|
|
|
Issue PAID IN FULL permit | | | 12/11/2012 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Bld | | | 12/11/2012 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/11/2012 | | 12/11/2012 | | PASS |
Carl D Madsen
|
|
|
|
Permit Ready to Issue | | | 12/11/2012 | | DONE |
Barbara Stitt
|
|
|
|
Routing - MECHANICAL | 11/29/2012 | | 11/29/2012 | | PASS |
Troy James
|
|
|
eplan
|
1st review completed | | | 11/15/2012 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 10/29/2012 | | 11/15/2012 | | FAIL |
Carl D Madsen
|
|
|
Shear wall engineering is required. 11-15-12 CDM
|
Route to Impact Fee Review | 10/26/2012 | 10/31/2012 | 11/5/2012 | | PASS |
Cindy M. Gould
|
|
|
|
Routing PW Grading-Hillside | 10/26/2012 | | 11/2/2012 | | PASS |
Jim Wyllie
|
|
|
Retaining wall plans not provided. Drainage swale along east property line is too steep. Jim Wyllie (###-####) Approved in Eplan review CDM
|
Routing - MECHANICAL | 10/26/2012 | | 10/30/2012 | | FAIL |
Troy James
|
|
|
eplan, pressure losses for duct summary
|
Routing - FIRE | 10/29/2012 | | 10/29/2012 | | PASS |
Scott Arellano
|
|
|
No comments.
|
Routing - Addressing | 10/26/2012 | | 10/29/2012 | | PASS |
April Wing
|
|
|
|
Routing - PUBLIC WORKS | 10/26/2012 | | 10/29/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Erosion and Sediment | 10/26/2012 | | 10/29/2012 | | PASS |
Kimberly M. Johnson
|
|
|
|
Routing PW Sewer Rating | 10/29/2012 | | 10/29/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Payment Received | | | 10/26/2012 | | DONE |
|
|
|
Payment received via Govolutions
|
Plans ACCEPTED BY PLAN TECH | | | 10/26/2012 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 10/26/2012 | | PASS |
Barbara Stitt
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/26/2012 | | DONE |
Christina Prado
|
|
|
|
Routing - PLANNING | | | 10/26/2012 | | PASS |
|
|
|
|
Application received | | | 10/25/2012 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 25 2012 10:27AM
|
Intake Approval | | | 10/25/2012 | | FAIL |
|
|
|
|