Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD12-02867
StatusFinaled
Name BECK CONSTRUCTION INC
Site Address 1900 E SHAW MOUNTAIN RD
Project Name 
Customer Number 
ePlanReviewNo
Description
(WUI ZONE A)Permit for the construction of a new 1,850 sq. ft., one story single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 270 sq. ft. of covered patio/porch, and a 895 sq. ft. attach garage per the approved plans, plan review report and any notations. A letter from the applicant’s geotechnical engineer indicating that the footing sub-grade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946 CDM

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
. R-1B zoning and setbacks per planning. CDM
Fire Sprinklers are not required.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
PubWorks Occupancy Approval3/25/20153/25/20153/25/2015 DONE
DetailsJason C. Taylor
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.

A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.
BLD-Final4/3/20144/4/20144/4/2014PPASS
DetailsDave Hannah
Phone #: ###-#### >> Inspection requested via web by Gary Beck
DOC - Permit Finaled4/4/20144/4/20144/4/2014PPASS
DetailsDave Hannah
BLD-Wall cover9/4/20139/4/20139/4/2013PPASS
DetailsDave Hannah
Phone #: ###-#### >> Inspection requested via web by Gary Beck
BLD-Energy code compliance8/28/20138/29/20138/29/2013APART
DetailsDave Hannah
Phone #: ###-#### >> Inspection requested via web by Gary Beck energy seal package ok
BLD-Framing/Rough-in8/28/20138/29/20138/29/2013APASS
DetailsDave Hannah
Phone #: ###-#### >> Inspection requested via web by Gary Beck
BLD-Other8/19/20138/20/20138/21/2013APART
DetailsDave Hannah
One hour soffit assembly for WUI. Phone #: ###-#### >> Inspection requested via web by Gary Beck ok to start covering soffits boxs around light cans ok
BLD-Wall Bracing7/29/20137/30/20137/30/2013APASS
DetailsDave Hannah
Please inspect early if possible. Thanks for your help. Phone #: ###-#### >> Inspection requested via web by Gary Beck
BLD-Foundation6/12/20136/12/20136/13/2013PPASS
DetailsDave Hannah
ben Phone #: ###-#### if possible around 2:30
BLD-Footing6/10/20136/10/20136/11/2013PPASS
DetailsDave Hannah
Ben Phone #: ###-####
PubWorks Subgrade Approval6/4/20136/4/20136/4/2013 DONE
DetailsJason C. Taylor
Revised subgrade approval recieved. Footing elements may be placed and building department may be scheduled. Jason Taylor ###-####.
PubWorks Subgrade Approval6/3/20136/3/20136/3/2013 FAIL
DetailsJason C. Taylor
Subgrade report was received from geotechnical engineer. Subgrade report was not acceptable as fill material was not tested properly. Compaction tests must be submitted prior to placement of foundation elements. Jason Taylor ###-####.
Issue PAID IN FULL permit  5/28/2013 DONE
OVERRIDE  5/8/2013  
Plan assigned to (CDM)10/29/201210/29/20125/8/2013 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK4/19/2013 5/8/2013 PASS
DetailsCarl D Madsen
Case Summary (BLD)  5/8/2013 DONE
PLANS/APPL TAKEN TO FRONT DESK  5/8/2013 DONE
Inspection Record Card- Bld  5/8/2013 DONE
Telephone call  5/8/2013 DONE
DetailsChristina Prado
called Gary to advise permit is reay for pick up pending Rp and payment
Permit Ready to Issue  5/8/2013 DONE
DetailsChristina Prado
Routing - FIRE  5/7/2013 PASS
Routing - Erosion and Sediment4/25/2013 4/26/2013 PASS
DetailsKimberly M. Johnson
Routing - MECHANICAL4/24/2013 4/25/2013 PASS
DetailsTroy James
Routing - PLANNING4/23/2013 4/24/2013 PASS
DetailsTodd Tucker
Routing PW Grading-Hillside4/23/2013 4/23/2013 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing sub-grade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Plan resubmittals received  4/19/2013 DONE
DetailsTisha Gallop
received two copies of structural calcs, ESC narrative, drainage calcs, O & M Manual, engineering detail, reduced site plan, full size plan sheets Cover, A-1.0, A-2.0, A-3.0, A-4.0, A-4.1, A-5.0, A-6.0, and three copies of plan sheets GD-1, GD-2, STR-1; taken to Carl Madsen
Routing - PLAN CHECK11/8/2012 11/18/2012 FAIL
DetailsCarl D Madsen
Conditioned crawl, Rated vents and one hour soffits.
1st review completed  11/18/2012 FAIL
Case Summary (BLD)  11/18/2012 DONE
Routing - Erosion and Sediment11/7/2012 11/8/2012 PASS
DetailsKimberly M. Johnson
Routing - MECHANICAL11/8/2012 11/8/2012 PASS
DetailsTroy James
Routing - MECHANICAL11/6/2012 11/7/2012 FAIL
DetailsTroy James
emailed correction to A1 heating
Routing - PLANNING11/5/2012 11/6/2012 PASS
DetailsTodd Tucker
Driveway as shown on plans is too wide. Must reduce width of driveway in the front setback to a maximum of 33 feet as redlined on plans.
Route to Impact Fee Review10/29/201211/1/201211/5/2012 PASS
DetailsCindy M. Gould
Routing - PUBLIC WORKS10/31/2012 11/5/2012 PASS
DetailsConnie Baumgartner
Routing PW Grading-Hillside10/31/2012 11/5/2012 PASS
DetailsJim Wyllie
Comply with conditions as stated in letter to Gary Beck dated 11-05-12. Jim W. (###-####)
Routing PW Sewer Rating11/5/2012 11/5/2012 PASS
DetailsConnie Baumgartner
Plan resubmittals received  11/2/2012 DONE
DetailsTisha Gallop
received two copies of Geotech Report and Grading & Drainage Stormwater Volume Calcs. ; put with plans in Jim Wylies box since he still has plans.
Routing - Addressing10/29/2012 10/30/2012 PASS
DetailsApril Wing
Application received 10/29/201210/29/2012 DONE
Recd Pcfee & Taken To Pln CK  10/29/2012 DONE
Plans ACCEPTED BY PLAN TECH  10/29/2012  
Intake Approval  10/29/2012 PASS