Print Occupancy Form | | | 12/7/2017 | | DONE |
|
|
|
|
Permanent Occupancy | | | 12/7/2017 | | DONE |
|
|
|
|
BLD-Conference | 12/28/2015 | 12/29/2015 | 12/29/2015 | A | CANC |
Mike Jordan
|
|
|
Still in space? never called in their final to get their occupancy . Same tenant is still occ. A final inspection has been done.
|
BLD-Final | 12/29/2015 | 12/29/2015 | 12/29/2015 | A | PASS |
Mike Jordan
|
|
|
Ok for perm occ.
|
FIRE-Final Inspection | 4/25/2014 | 4/25/2014 | 4/25/2014 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 11/9/2012 | 11/13/2012 | 11/13/2012 | P | NR |
Jim Sly
|
|
|
Kha Phone #: ###-####
|
FIRE-Final Inspection | 11/9/2012 | 11/13/2012 | 11/13/2012 | A | FAIL |
Troy Cobbley
|
|
|
Life safety will be ok to final when verification has been provided that the annual inspection for the existing fire sprinkler system has been performed. Jeremy with Boise Fire is currently working with the building owner on this issue.
|
Plan assigned to (CDM) | 10/29/2012 | 10/29/2012 | 11/9/2012 | | DEFR |
Carl D Madsen
|
|
|
Review defered to Tim W.
|
Routing - PLAN CHECK | 10/29/2012 | | 11/9/2012 | | PASS |
Tim L. Woodard
|
|
|
Approved
|
Plan assigned to (TLW) | 11/9/2012 | | 11/9/2012 | | DONE |
Tim L. Woodard
|
|
|
|
1st review completed | | | 11/9/2012 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/9/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 11/9/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 11/9/2012 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/9/2012 | | |
|
|
|
|
Telephone call | | | 11/9/2012 | | |
|
|
|
11-9-12 called Kha permit ready for pick up ///dld
|
Issue PAID IN FULL permit | | | 11/9/2012 | | DONE |
Christina Prado
|
|
|
|
Application received | | 10/29/2012 | 10/29/2012 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/29/2012 | | DONE |
Tisha Gallop
|
|
|
|