Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD12-02884
StatusFinaled
Name ST LUKES REG MED CNTR
Site Address 100 E IDAHO ST
Project NameSoTow Woman’s Clinic - Ultraso
Customer Number 
ePlanReviewYes
Description
This project consists of a (1,974 s.f.) remodel of an existing medical office / clinic space located on the fourth level of the MSTI building located at 100 east Idaho Street, Boise, Idaho. The entire building is fire sprinkled including the area of this tenant improvement. Work includes select interior demolition within the existing space and remodeling to create three private offices, three ultra-sound rooms, one NST room with 2 stations a combination conference / kitchen room, a new accessible restroom and support closets; suspended ceiling system, electrical, mechanical, plumbing, sprinkler and alarm system modifications as needed for new tenant. Separate applications, plans and permits are required before any sprinkler system or alarm system work can be done, as regulated by the fire department. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  8/5/2013 DONE
DetailsTisha Gallop
e-mailed to Virna McEntee and Curtis Weedop at St Lukes
Third Notice 7/7/20137/29/2013 DONE
Third Notice 6/9/20137/2/2013 DONE
e-mailed to Curits
Second Notice 5/3/20136/4/2013 DONE
emailed Curtis 6-4-13
First Notice 4/19/20134/23/2013 DONE
Permanent Occupancy  4/9/2013 DONE
DetailsBarbara Stitt
BLD-Final3/25/20133/26/20133/26/2013APASS
DetailsDave Hannah
Daryl Phone #: ###-####
FIRE-Final Inspection3/21/20133/22/20133/22/2013APASS
DetailsForrest France
Fire life safety inspection passed.
FIRE-Sprinkler Rough-in2/28/20132/28/20133/1/2013PPART
DetailsForrest France
BLD-Ceiling Grid Inspection2/27/20132/27/20132/27/2013PPASS
DetailsDave Hannah
daryl- before 3 if possible Phone #: ###-####
BLD-Framing/Rough-in1/23/20131/23/20131/23/2013PPASS
DetailsTom Arcoraci
Daryl Phone #: ###-####
FIRE-Sprinkler Rough-in1/10/20131/10/20131/14/2013PNR
DetailsForrest France
CHANGE STATUS TO (ISS)  12/11/2012 DONE
DetailsDarla L Downs
Print Occupancy Form  12/11/2012 DONE
Issue PAID IN FULL permit  12/11/2012  
Plan assigned to (DRS)11/6/201211/6/201211/21/2012 PASS
DetailsDan Stuart
eplanreview
Permit Ready to Issue  11/21/2012 DONE
DetailsDarla L Downs
Routing - PLAN CHECK11/19/2012 11/21/2012 PASS
DetailsDan Stuart
Plans red lined for clarification.
PLANS/APPL TAKEN TO FRONT DESK  11/21/2012 PASS
DetailsDan Stuart
1st review completed  11/19/2012 PASS
DetailsDan Stuart
Routing - FIRE11/15/2012 11/19/2012 PASS
DetailsScott Arellano
Attached comments to permit case and e-plan folder.
Routing - PUBLIC WORKS11/15/2012 11/16/2012 PASS
DetailsConnie Baumgartner
Routing - PLUMBING11/15/2012 11/16/2012 PASS
DetailsDaryl Spivey
Per plans and 2003 UPC.
Routing PW Sewer Rating11/16/2012 11/16/2012 PASS
DetailsConnie Baumgartner
Routing - PLAN CHECK11/15/2012 11/15/2012 PEND
DetailsDan Stuart
Pending other agency review and approval. Plans red lined with code clarification notes / code sections.
Intake Approval  11/6/2012 PASS
Payment Received  10/30/2012 DONE
Payment received via Govolutions
Application received  10/30/2012 DONE
Application submitted via PDS Online on Oct 30 2012 11:05AM