BLD-Final | 2/11/2013 | 2/12/2013 | 2/12/2013 | A | PASS |
Mike Jordan
|
|
|
garage access code 1234 Phone #: ###-#### >> Inspection requested via web by Bryan Pecht
|
DOC - Permit Finaled | 2/12/2013 | 2/12/2013 | 2/12/2013 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 2/8/2013 | 2/11/2013 | 2/11/2013 | A | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Bryan Pecht. Provide blower door test results and post, provide the required energy cert and post. Provide adequate slope from foundation.
|
BLD-Wall cover | 1/10/2013 | 1/11/2013 | 1/11/2013 | P | PASS |
Mike Jordan
|
|
|
>> Inspection requested via web by Bryan Pecht
|
BLD-Energy code compliance | 1/8/2013 | 1/9/2013 | 1/9/2013 | A | PASS |
Mike Jordan
|
|
|
>> Inspection requested via web by Bryan Pecht
|
BLD-Framing/Rough-in | 1/7/2013 | 1/8/2013 | 1/8/2013 | A | PASS |
Mike Jordan
|
|
|
>> Inspection requested via web by Bryan Pecht
|
BLD-Framing/Rough-in | 1/6/2013 | 1/7/2013 | 1/7/2013 | P | FAIL |
Mike Jordan
|
|
|
>> Inspection requested via web by Bryan Pecht. Provide truss engineering, Provide straps at portal frame in dinning room, see sheet A5. Strap beam from front covered patio at exterior wall. Correction notice posted.
|
BLD-Framing/Rough-in | 1/4/2013 | 1/4/2013 | 1/4/2013 | P | NR |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Bryan Pecht. Needs mechanical rough in inspection.
|
BLD-Framing/Rough-in | 1/2/2013 | 1/3/2013 | 1/3/2013 | P | NR |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Bryan Pecht. Needs mech ri inspection.
|
BLD-Wall Bracing | 12/19/2012 | 12/20/2012 | 12/20/2012 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Bryan Pecht
|
BLD-Wall Bracing | 12/18/2012 | 12/19/2012 | 12/19/2012 | A | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Bryan Pecht. Work in progress, missing blocking.
|
BLD-Footing | 11/28/2012 | 11/28/2012 | 11/28/2012 | P | PASS |
Mike Jordan
|
|
|
jerry Phone #: ###-####
|
Issue PAID IN FULL permit | | | 11/26/2012 | | DONE |
Tisha Gallop
|
|
|
|
OVERRIDE | | | 11/21/2012 | | |
|
|
|
|
Plan assigned to (CDM) | 11/1/2012 | 11/1/2012 | 11/21/2012 | | PASS |
Carl D Madsen
|
|
|
|
Telephone call | | | 11/21/2012 | | DONE |
|
|
|
Spoke with Bryan OK to CS-PF in areas designated on the plans. 11-20-12 CDM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/21/2012 | | |
|
|
|
|
Inspection Record Card- Bld | | | 11/21/2012 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 11/21/2012 | | DONE |
Barbara Stitt
|
|
|
Called Bryan and told him that permit is ready and fees due on 11-21-12 @ 11:00am//BAS
|
Permit Ready to Issue | | | 11/21/2012 | | DONE |
Barbara Stitt
|
|
|
|
1st review completed | | | 11/18/2012 | | FAIL |
|
|
|
|
Case Summary (BLD) | | | 11/18/2012 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/8/2012 | | 11/18/2012 | | PASS |
Carl D Madsen
|
|
|
Wall bracing 11-18-12 CDM
|
Routing - MECHANICAL | 11/5/2012 | | 11/8/2012 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 11/2/2012 | | 11/5/2012 | | PASS |
Todd Tucker
|
|
|
|
Route to Impact Fee Review | 11/1/2012 | 11/6/2012 | 11/2/2012 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PUBLIC WORKS | | | 11/2/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Application received | | 11/1/2012 | 11/1/2012 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 11/1/2012 | | PASS |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/1/2012 | | DONE |
Barbara Stitt
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/1/2012 | | DONE |
Barbara Stitt
|
|
|
|
Routing - Addressing | 11/1/2012 | | 11/1/2012 | | PASS |
April Wing
|
|
|
|