Permit Information
Permit NumberBLD12-02908
StatusFinaled
Name CONGER MANAGEMENT GROUP
Site Address 4450 E WARM SPRINGS AVE
Project NameWarm Springs Creek
Customer Number 
ePlanReviewNo
Description
(Warm Springs Creek cleanout) Rough grading permit to modify a 700 lf portion of Warm Springs Creek in the Harris Ranch development.Clearn out channel and placement of fill on West side. Reference ESC12-00539 and CFH12-00027//leg
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/23/20191/23/20191/23/2019PDONE
DetailsBrandon Shaw
final for grading
DOC - Permit Finaled1/23/20191/23/20191/23/2019PPASS
DetailsBrandon Shaw
PubWorks Occupancy Approval6/18/20156/18/20156/18/2015 DONE
DetailsJason C. Taylor
Project completed. Permit may be finaled. JCT
Routing - PUBLIC WORKS GRADING8/2/2013 8/2/2013 PASS
DetailsJason C. Taylor
Recieved engineers approval for project. Bond cannot be released until project is completely revegetated. Jason Talyor ###-####.
Issue PAID IN FULL permit  1/4/2013 DONE
DetailsTisha Gallop
Plan assigned to (LEG) Tisha11/2/2012 12/21/2012 DONE
DetailsTisha Gallop
Routing - PLAN CHECK11/23/2012 12/21/2012 PASS
DetailsTisha Gallop
Tisha Gallop
Inspection Record Card- Bld  12/21/2012 DONE
DetailsTisha Gallop
PLANS/APPL TAKEN TO FRONT DESK  12/21/2012 DONE
DetailsTisha Gallop
Permit Ready to Issue  12/21/2012 DONE
DetailsTisha Gallop
Telephone call  12/21/2012 DONE
DetailsTisha Gallop
called Jim Conger and told him permit is ready, fee and need Gc form and bond.
Routing - PUBLIC WORKS12/11/2012 12/20/2012 PASS
DetailsConnie Baumgartner
Routing PW Drainage12/20/2012 12/20/2012 PASS
DetailsJason C. Taylor
see Jim Wylie, bond required
Plan resubmittals received  12/11/2012 DONE
DetailsTisha Gallop
Jim Wylie received cut sheet for material being used via e-mail; plans routed to PW.
Routing PW Drainage12/11/2012 12/11/2012 FAIL
DetailsJim Wyllie
Need more plan copies. Developer has been notified. Need to have Grading Permit Conditions list signed by engineer and developer. Jim Wyllie (###-####)
Routing - Erosion and Sediment11/29/2012 11/29/2012 PASS
DetailsKimberly M. Johnson
ESC plan mod approved per redlines 11/29/2012. Plan mod includes the additional scope of work for the Warm Springs Creek widening project (3 acres disturbance).
Plan resubmittals received  11/28/2012 DONE
DetailsChristina Prado
received two copies of SWPPP Adendum, ESC permit, Planning approval copies, and site plans for ESC12-00539; gave to Kim for further review
Routing - PUBLIC WORKS11/2/2012 11/23/2012 FAIL
DetailsConnie Baumgartner
Failed by Jim Wylie
Routing PW Drainage11/5/2012 11/21/2012 FAIL
DetailsJim Wyllie
Routing - Erosion and Sediment11/21/2012 11/21/2012 FAIL
DetailsKimberly M. Johnson
This application is for the permit modification of ESC 12-00539. The permit modification application to ESC 12-00539 failed for the following reasons. 1) Need submittal of the sections of the SWPPP that have been revised. This includes but is not limited to a description of new BMPs that will be required for this additional scope, methods that will be used to perform work in the dry and/or a dewatering plan, new discharge location(s), ect. 2) Drawing showing any drainage easements (Boise does not have jurisdiction of wiork performed on canals, ditches and other water conveyance facilities which occur within the fee title lands, ROW or easements for such facilities), location of BMPs in the area of new disturbance, and BMP installation details not otherwise listed. Other items to note: The EPA permit number referenced in the applicant's cover letter IDR10CO46 is not associated with this project. The EPA permit number referenced in the cover letter IDR10CR48 indicates coverage under the 2008 CGP (expired) and not the 2012 CGP. No plan modification has been applied for with the EPA for this additional scope of work. Lastly, Warm Springs Creek appears to meet the definition of Waters of the U.S. because a direct link exists to the Boise River. Approval of the Boise City ESC modification does not relieve the applicant of addtitional permitting requirements with other entities. Called Jim Conger (left message) and Jeff Korsen (left message)
Routing - Addressing11/5/2012 11/5/2012 PASS
DetailsApril Wing
Changed address and parcel to reflect correct location
Application received 11/1/201211/2/2012 DONE
DetailsTisha Gallop
Intake Approval  11/2/2012 PASS
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  11/2/2012 DONE
DetailsTisha Gallop
First Notice1/23/20191/23/2019   
DetailsBrandon Shaw