Third Follow up | | | 10/9/2013 | | DONE |
Tisha Gallop
|
|
|
|
Print Statement | | | 10/9/2013 | | DONE |
Tisha Gallop
|
|
|
mailed to Steed Const
|
Third Notice | | 9/4/2013 | 10/1/2013 | | DONE |
|
|
|
9/11/13 contractor called said will send it in next couple of days --- mailed with letter 9/30/13
|
Third Notice | | 8/4/2013 | 8/30/2013 | | DONE |
|
|
|
mailed to Steed
|
Third Notice | | 7/7/2013 | 7/30/2013 | | DONE |
|
|
|
faxed
|
Telephone call | | | 7/8/2013 | | DONE |
Tisha Gallop
|
|
|
called Jason Hibbard/Steed Const and left vm received FV over fax; need real final values not copy of initial, including ele, mech, & plmb.
|
Third Notice | | 6/9/2013 | 7/2/2013 | | DONE |
|
|
|
faxed
|
Second Notice | | 5/3/2013 | 6/4/2013 | | DONE |
Christina Prado
|
|
|
mailed 6-5-13
|
First Notice | 4/9/2013 | 4/9/2013 | 4/23/2013 | | DONE |
Tom Arcoraci
|
|
|
|
BLD-Final | 4/8/2013 | 4/9/2013 | 4/9/2013 | A | PASS |
Tom Arcoraci
|
|
|
Tim-PLease call prior to inspection Phone #: ###-####
|
DOC - Permit Finaled | 4/9/2013 | 4/9/2013 | 4/9/2013 | P | PASS |
Tom Arcoraci
|
|
|
|
FIRE-Final Inspection | 4/8/2013 | 4/8/2013 | 4/8/2013 | P | PASS |
Forrest France
|
|
|
Fire life safety final approved.
|
FIRE-Final Inspection | 4/4/2013 | 4/5/2013 | 4/5/2013 | P | PASS |
Troy Cobbley
|
|
|
Fire life safety passed
|
FIRE-Final Inspection | 2/20/2013 | 2/21/2013 | 2/21/2013 | A | FAIL |
Forrest France
|
|
|
Modifications to the fire alarm system will be necessary due to remodel work (FIR permit required). Remainder of fire life safety inspection items passed.
|
BLD-Final | 2/20/2013 | 2/21/2013 | 2/21/2013 | A | NR |
Tom Arcoraci
|
|
|
Tim-PLease call prior to inspection Phone #: ###-####
|
FIRE-Conference | 2/12/2013 | 2/12/2013 | 2/12/2013 | P | DONE |
Troy Cobbley
|
|
|
This entry is for future inspectors note. I noted the the existing ceiling mounted horn/strobe spacing appears to be blocked by the new freezer walls.
|
Issue PAID IN FULL permit | | | 11/21/2012 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (TLW) | 11/13/2012 | | 11/19/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 11/13/2012 | | 11/19/2012 | | PASS |
Tim L. Woodard
|
|
|
Permit approved with structural calculation attached on 7 ft. fence. TLW
|
Routing - PLANNING | 11/19/2012 | | 11/19/2012 | | PASS |
Sarah Schafer
|
|
|
No Zoning cert required for Chain link fence behind building per: Sarah Schafer / Colleen Carroll. TLW
|
1st review completed | | | 11/19/2012 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/19/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 11/19/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Inspection Record Card- Bld | | | 11/19/2012 | | DONE |
|
|
|
|
Telephone call | | | 11/19/2012 | | DONE |
Christina Prado
|
|
|
called Tom to advise permit is ready and gave fees due
|
Permit Ready to Issue | | | 11/19/2012 | | DONE |
Christina Prado
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/13/2012 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 11/13/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/13/2012 | | |
Christina Prado
|
|
|
|
Intake Approval | | | 11/8/2012 | | FAIL |
Tim L. Woodard
|
|
|
Tom,
Please upload the #518 Checklist and also form #304 Registered Design Proffessional form into the Documents folder of this case. Please modify the plan sheets to comply with the Electronic Submittal Guide. The Electronic submittals required a clear stamping area provided 3 inches off the bottom right corner for "Batch Stamping".
Thanks.
Call if you have any questions.
Tim Woodard
208 384 3817
|
Application received | | | 11/2/2012 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 2 2012 3:05PM
|