BLD-Final | 5/6/2013 | 5/8/2013 | 5/8/2013 | A | PASS |
Mike Jordan
|
|
|
Ron Smith--Please call at least 30 mins prior to inspection Phone #: ###-####. Finaled by inspector #316 on 5-7-13.
|
DOC - Permit Finaled | 5/8/2013 | 5/8/2013 | 5/8/2013 | P | PASS |
Mike Jordan
|
|
|
Finaled by inspector #316 on 5-7-13.
|
BLD-Energy code compliance | 2/27/2013 | 2/27/2013 | 2/27/2013 | P | PART |
Tom Arcoraci
|
|
|
ron - call 30 mins prior Phone #: ###-#### ok to cover if sprinks are ok
|
BLD-Framing/Rough-in | 2/25/2013 | 2/25/2013 | 2/25/2013 | P | PASS |
Jim Sly
|
|
|
RON PLEASE CALL 30 MIN BEFORE GOING OUT Phone #: ###-####
|
BLD-Wall Bracing | 2/4/2013 | 2/4/2013 | 2/4/2013 | P | PASS |
Jim Sly
|
|
|
Ron Smith Phone #: ###-####
|
BLD-Other | 12/17/2012 | 12/17/2012 | 12/17/2012 | P | PASS |
Jim Sly
|
|
|
ken - stem wall Phone #: ###-####
|
BLD-Footing | 12/12/2012 | 12/12/2012 | 12/12/2012 | P | PASS |
Jim Sly
|
|
|
Ken Patton-Late afternoon please Phone #: ###-####
|
OVERRIDE | | | 11/29/2012 | | |
|
|
|
|
Plan assigned to (CDM) | | 11/6/2012 | 11/29/2012 | | PASS |
Carl D Madsen
|
|
|
|
Telephone call | | | 11/29/2012 | | DONE |
Tisha Gallop
|
|
|
called Ron and told him permit is ready and fee.
|
Inspection Record Card- Bld | | | 11/29/2012 | | DONE |
Tisha Gallop
|
|
|
|
Issue PAID IN FULL permit | | | 11/29/2012 | | DONE |
|
|
|
|
Plan resubmittals received | | | 11/29/2012 | | DONE |
|
|
|
Tall wall engineering was E-Mailed on 11-28-12 CDM
|
Routing - PLAN CHECK | 11/29/2012 | | 11/29/2012 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/29/2012 | | |
|
|
|
|
Case Summary (BLD) | | | 11/29/2012 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/29/2012 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/29/2012 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | 11/15/2012 | | 11/27/2012 | | FAIL |
Carl D Madsen
|
|
|
Tall wall engineering for 16' tall garage walls. Called applicant and designer. 11-26-12 CDM
|
1st review completed | | | 11/27/2012 | | FAIL |
|
|
|
|
Routing - MECHANICAL | 11/8/2012 | | 11/15/2012 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 11/6/2012 | 11/9/2012 | 11/8/2012 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PUBLIC WORKS | 11/7/2012 | | 11/8/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLANNING | 11/8/2012 | | 11/8/2012 | | PASS |
David Moser
|
|
|
|
Routing - Addressing | 11/6/2012 | | 11/7/2012 | | PASS |
April Wing
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/6/2012 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 11/6/2012 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/6/2012 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 11/5/2012 | | FAIL |
Christina Prado
|
|
|
Needs reduced site plan, manual J, building height, water heater/Furnace elevation, wall insulation and CO2 called out on plans
|
Application received | | | 11/4/2012 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 4 2012 11:57AM
|