BLD-Final | 8/1/2013 | 8/2/2013 | 10/20/2014 | P | CANC |
Tony Young
|
|
|
Jeff Phone #: ###-#### Inspection cancelled from web by: Stephanie Anthony
|
BLD-Final | 7/30/2013 | 7/31/2013 | 8/6/2013 | P | PART |
Tony Young
|
|
|
Jeff Phone #: ###-####,, fire place chase was signed of by mechanical inspector,, need roof cap on fireplace stack
|
BLD-Final | 7/22/2013 | 7/22/2013 | 7/30/2013 | A | NR |
Tony Young
|
|
|
Jeff Phone #: ###-####,, need roof on fire place area
|
BLD-Final | 7/18/2013 | 7/19/2013 | 7/22/2013 | P | PASS |
Tony Young
|
|
|
Jeff Phone #: ###-####
|
BLD-Wall cover | 5/13/2013 | 5/14/2013 | 5/14/2013 | A | PART |
Tony Young
|
|
|
Shane Phone #: ###-####,, verify chase seal by the kitchen,, fire place?/// ok to cover except the fireplace,, changing it out,, will need an inspection on the fiureplace area
|
BLD-Energy code compliance | 5/10/2013 | 5/13/2013 | 5/13/2013 | A | FAIL |
Tony Young
|
|
|
Shane Phone #: ###-####,, need a fireplace permit?,, seal chase top by kitchen per prior correction notice
|
BLD-Energy code compliance | 5/9/2013 | 5/10/2013 | 5/10/2013 | A | NR |
Tony Young
|
|
|
Shane Phone #: ###-####
|
BLD-Framing/Rough-in | 5/8/2013 | 5/8/2013 | 5/8/2013 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### >> Inspection requested via web by SHANE JAYO,, ok to insulate,, shear ok now
|
BLD-Framing/Rough-in | 5/7/2013 | 5/8/2013 | 5/8/2013 | A | NR |
Tony Young
|
|
|
Phone #: ###-#### >> Inspection requested via web by SHANE JAYO
|
BLD-Framing/Rough-in | 5/3/2013 | 5/6/2013 | 5/6/2013 | P | FAIL |
Tony Young
|
|
|
Phone #: ###-#### >> Inspection requested via web by SHANE JAYO,, correction posted
|
BLD-Foundation | 3/14/2013 | 3/15/2013 | 3/15/2013 | P | PART |
Tony Young
|
|
|
Bill Phone #: ###-####,, work in progress, ok when ready
|
BLD-Footing | 3/13/2013 | 3/13/2013 | 3/13/2013 | P | PASS |
Jim Sly
|
|
|
shane Phone #: ###-####
|
Issue PAID IN FULL permit | | | 3/13/2013 | | DONE |
|
|
|
|
PubWorks Subgrade Approval | 3/11/2013 | 3/11/2013 | 3/11/2013 | | DONE |
Jason C. Taylor
|
|
|
Subgrade approval recieved by geotechnical enginner footing inspection can be scheduled with the building department. Jason Taylor ###-####.
|
Plan assigned to (CDM) | 11/19/2012 | 11/19/2012 | 12/19/2012 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PUBLIC WORKS GRADING | 12/14/2012 | | 12/19/2012 | | PASS |
Jim Wyllie
|
|
|
Prior to scheduling a footing inspection, applicant's geotechnical engineer shall provide a letter to Public Works approving footing subgrade. Jim Wyllie (###-####)
|
Routing - PLAN CHECK | 12/19/2012 | | 12/19/2012 | | PASS |
Carl D Madsen
|
|
|
|
Case Summary (BLD) | | | 12/19/2012 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/19/2012 | | |
|
|
|
|
Inspection Record Card- Bld | | | 12/19/2012 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 12/19/2012 | | |
|
|
|
|
Telephone call | | | 12/19/2012 | | |
|
|
|
12-19-12 called Jayo Construction left message permit ready and fee given ///dld
|
Plan resubmittals received | | | 12/13/2012 | | |
Tisha Gallop
|
|
|
received two copies of pages 5 of 12, 6 of 12 and engineering; taken to Carl Madsen
|
Routing - PLANNING | 12/6/2012 | | 12/7/2012 | | PASS |
Susan Riggs
|
|
|
|
1st review completed | | | 12/6/2012 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 11/28/2012 | | 12/6/2012 | | FAIL |
Carl D Madsen
|
|
|
Need to provide a beam schedule or the engineers stamped redlined set to match the engineering. Den window needs to meed emergency escape and rescue opening requirements. E-Mailed the applicant. 12-6-12 CDM
|
Routing - Erosion and Sediment | 12/4/2012 | | 12/4/2012 | | PASS |
Kimberly M. Johnson
|
|
|
|
Routing - MECHANICAL | 11/24/2012 | | 12/4/2012 | | PASS |
Troy James
|
|
|
|
Routing - FIRE | | | 12/3/2012 | | PASS |
Scott Arellano
|
|
|
OK per Scott A 12-3-12 CDM
|
Plan resubmittals received | | | 11/29/2012 | | DONE |
Christina Prado
|
|
|
Received two ESC Narratives as well as two ESC plans;routed to Carl Madsen
|
Routing - PUBLIC WORKS | | | 11/28/2012 | | FAIL |
Connie Baumgartner
|
|
|
Failed by Jim Wylie
|
Routing PW Grading-Hillside | 11/23/2012 | | 11/28/2012 | | FAIL |
Jim Wyllie
|
|
|
Building foundation encroaches into fill slope between lots 13 and 14. Provisions to convey stormwater runoff to the back and / or front of lot 13 not shown. JIm Wyllie (###-####)
|
Routing - PUBLIC WORKS | 11/20/2012 | | 11/23/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Route to Impact Fee Review | 11/19/2012 | 11/23/2012 | 11/20/2012 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - Addressing | 11/19/2012 | | 11/20/2012 | | PASS |
April Wing
|
|
|
|
Application received | | 11/6/2012 | 11/19/2012 | | DONE |
Tisha Gallop
|
|
|
|
Intake Approval | | | 11/16/2012 | | PASS |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/16/2012 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/16/2012 | | DONE |
Tisha Gallop
|
|
|
|
Intake Approval | | | 11/6/2012 | | FAIL |
Tisha Gallop
|
|
|
Need engineered plan sheets stamped and Man J
|