BLD-Final | 8/14/2013 | 8/15/2013 | 8/15/2013 | A | FAIL |
Dave Hannah
|
|
|
ryan Phone #: ###-#### no barrier around pool
|
BLD-Footing | 11/21/2012 | 11/26/2012 | 11/27/2012 | P | PASS |
Dave Hannah
|
|
|
ryan Phone #: ###-####
|
Routing PW Grading-Hillside | 11/20/2012 | | 11/20/2012 | | PASS |
Jim Wyllie
|
|
|
Received conditional subgrade approval from geotechnical engineer. Okay to schedule a pool subgrade inspection. Contractor shall comply with recommendtions contained in the geotechnical engineer's inspection report. Jim Wyllie (###-####)
|
Issue PAID IN FULL permit | | | 11/9/2012 | | DONE |
Tisha Gallop
|
|
|
|
Routing PW Grading-Hillside | 11/8/2012 | | 11/8/2012 | | PASS |
Jim Wyllie
|
|
|
A letter from the applicant's geotechnical engineer indicating that the swimming pool subgrade is acceptable must be approved by Public Works prior to scheduling a BUilding Department inspection. Jim Wyllie (###-####)
|
Permit Ready to Issue | | | 11/8/2012 | | DONE |
Christina Prado
|
|
|
|
Meeting | | | 11/8/2012 | | DONE |
Christina Prado
|
|
|
Per Kim Johnson with ESC it is ok for the existing ESC12-00888 to be used for this pool permit as well.
|
Routing Walk-In (PW Hillside) | 11/7/2012 | 11/7/2012 | 11/7/2012 | P | PASS |
|
|
|
|
Routing Walk-In (BLD) | 11/7/2012 | 11/7/2012 | 11/7/2012 | P | PASS |
Carl D Madsen
|
|
|
|
Case Summary (BLD) | | | 11/7/2012 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/7/2012 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/7/2012 | | |
|
|
|
|
1st review completed | | | 11/7/2012 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 11/7/2012 | | 11/7/2012 | P | PASS |
Josh Wilson
|
|
|
In ground pool ok per R-1A zone.
|
Application received | | 11/7/2012 | | | |
|
|
|
|