First Notice | 1/22/2013 | 1/22/2013 | 1/28/2013 | | DONE |
Tom Arcoraci
|
|
|
mailed 1/29/13/// complete 2-6-13
|
BLD-Final | 1/18/2013 | 1/22/2013 | 1/22/2013 | A | PASS |
Tom Arcoraci
|
|
|
Kelley (or chuck ###-####) Phone #: ###-####
|
DOC - Permit Finaled | 1/22/2013 | 1/22/2013 | 1/22/2013 | P | PASS |
Tom Arcoraci
|
|
|
|
FIRE-Final Inspection | 1/18/2013 | 1/22/2013 | 1/22/2013 | A | PASS |
Forrest France
|
|
|
Fire life safety inspection passed.
|
BLD-Other | 1/15/2013 | 1/15/2013 | 1/15/2013 | P | PASS |
Jim Storey
|
|
|
anchor inspection please-Kelly Phone #: ###-#### 2nd phase si report ok to stock.
|
BLD-Final | 12/27/2012 | 12/27/2012 | 12/27/2012 | P | PART |
Jim Storey
|
|
|
kelly Phone #: ###-#### 2nd phase ok to stock.
|
BLD-Final | 12/14/2012 | 12/17/2012 | 12/17/2012 | A | PART |
Jim Sly
|
|
|
KELLY -MID MORNING OR ###-#### DERIK Phone #: ###-#### Inspection of racking.......Engineering for hold down bolting ......all racking , sheet #'s 1 and 4......Coolers 1 and 2 OK. MTI special insp report reviewed ...all bolting Passed.
|
Issue PAID IN FULL permit | | | 11/26/2012 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 11/15/2012 | 11/15/2012 | 11/23/2012 | | PASS |
Carl Westfall
|
|
|
DARIGOLD INC. - RACKING (14 days - Dec. 3)
|
Routing - PLAN CHECK | 11/15/2012 | | 11/23/2012 | | PASS |
Carl Westfall
|
|
|
Drawings approved with "red lines".
|
Routing - FIRE | 11/23/2012 | | 11/23/2012 | | PASS |
Scott Arellano
|
|
|
Plans are approved as shown. However, modifications to the existing automatic sprinkler system in this facility may be required for the improvements planned. The tenant improvement plans shall be reviewed by a licensed fire sprinkler contractor, to determine what, if any, modifications are necessary to maintain code compliance within the TI project area. A fire sprinkl permit will be required for any necessary modifications.
|
1st review completed | | | 11/23/2012 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/23/2012 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/23/2012 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/23/2012 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 11/23/2012 | | DONE |
Christina Prado
|
|
|
called Kelly to advise permit is ready and gave fees due
|
Pending Assignment by JCB | 11/14/2012 | | 11/15/2012 | | DONE |
Jason Blais
|
|
|
|
Application received | | 11/13/2012 | 11/14/2012 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Intake Approval | | | 11/14/2012 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/14/2012 | | DONE |
Barbara Stitt
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/14/2012 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 11/13/2012 | | FAIL |
|
|
|
Need special inspection form.
|