Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD12-03012
StatusFinaled
Name INFINITY DESIGN INC
Site Address 1350 W HILL RD
Project NameHunter residence
Customer Number 
ePlanReviewYes
Description
Permit for the construction of a new 2786 sq. ft., three story (first story 1328 sq. ft., second story 662 sq. ft.. basement 796 sq. ft.) single family dwelling with 5 bedrooms, 3.5 bathrooms, approximately 122 sq. ft. of covered patio/porch and a 596 sq. ft. attached garage per the approved plans, plan review report and any notations. R-1B zoning and setbacks per planning. This buidling is required to be fire sprinklered in accordance with NFPA 13D as a code alternate to meeting Fire Department Vehicle access requirements. CDM/SJA A letter from the applicant’s geotechnical engineer indicating that the footing sub-grade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/20/20145/21/20145/21/2014APASS
DetailsTony Young
Larry Phone #: ###-####
DOC - Permit Finaled5/21/20145/21/20145/21/2014PPASS
DetailsTony Young
c of o issued
BLD-Final5/19/20145/20/20145/20/2014APEND
DetailsTony Young
Larry Phone #: ###-####,, inside all ok,, just need hillside
PubWorks Occupancy Approval5/20/20145/20/20145/20/2014 DONE
DetailsJason C. Taylor
A bond for the sites final grading/revegetation/ and driveway has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.
BLD-Final5/19/20145/19/20145/19/2014PNR
DetailsTony Young
Larry Phone #: ###-####
BLD-Final5/15/20145/19/20145/19/2014ANR
DetailsTony Young
Larry Phone #: ###-####
BLD-Final5/16/20145/16/20145/16/2014PNR
DetailsTony Young
Larry Phone #: ###-####,, walkthrough only,, need trades, handrail per code,, hillside
BLD-Final5/15/20145/15/20145/15/2014PNR
DetailsTony Young
Larry Phone #: ###-####.. need trades,, hillside 1st
BLD-Footing5/1/20145/2/20145/2/2014APASS
DetailsJim Sly
james - pouring at 1 Phone #: ###-####
For stairway.
BLD-Energy code compliance2/6/20142/7/20142/7/2014PPASS
DetailsTony Young
Larry Phone #: ###-####
BLD-Energy code compliance2/6/20142/7/20142/7/2014APASS
DetailsTony Young
Larry Phone #: ###-####
BLD-Framing/Rough-in2/5/20142/6/20142/6/2014APASS
DetailsTony Young
Larry Phone #: ###-####
BLD-Framing/Rough-in1/24/20141/27/20141/27/2014PPART
DetailsTony Young
larry Phone #: ###-####,, ok to start insulation,, will do seal pack from foam,, NEEDS FURTHER APPROVALS FROM TRADES PRIOR TO COVER
BLD-Framing/Rough-in10/17/201310/17/201310/17/2013PPASS
DetailsJim Storey
Shear insepction please--Larry Phone #: ###-####
BLD-Foundation7/25/20137/26/20137/25/2013PPART
DetailsTony Young
basement wall - james Phone #: ###-####
BLD-Other7/24/20137/25/20137/25/2013APART
DetailsTony Young
basement wall - james Phone #: ###-####,, work in progress,, ok house walls including retaining walls
BLD-Footing7/17/20137/18/20137/18/2013APART
DetailsTony Young
james Phone #: ###-####,, house and garage ftgs
PubWorks Subgrade Approval7/18/20137/18/20137/18/2013 DONE
DetailsJason C. Taylor
Recieved subgrade approval from geotechnical engineer for entire building footprint. Building department may be scheduled for footing inspections. Jason Taylor ###-####.
CHANGE STATUS TO (ISS)  7/2/2013 DONE
DetailsChristina Prado
Plan assigned to (CDM)6/11/20136/11/20136/25/2013 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK6/11/2013 6/25/2013 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  6/25/2013 DONE
FEE PAYMENT ACTIONS  6/25/2013 DONE
DetailsBarbara Stitt
No fees charged on plan modification of revised site plan per Carl Madsen//BAS 6-25-13 there are only 2 sheets for the plan mod C1.0 Site Plan & C2.0 Grading Plan
Routing PW Grading-Hillside6/24/2013 6/24/2013 PASS
DetailsJason C. Taylor
New grading plan approved. Jason Taylor ###-####
Routing - PLANNING6/17/2013 6/17/2013 PASS
DetailsDavid Moser
Talked with Larry Keller and they will increase turn around area in front of garage doors to over 20 feet.
Issue PAID IN FULL permit  6/4/2013 DONE
DetailsChristina Prado
Expiration Notice4/23/20135/14/20134/23/2013 DONE
DetailsChristina Prado
Plan assigned to (CDM)12/18/201212/18/20124/15/2013 PASS
DetailsCarl D Madsen
ePlan review
Routing - PLAN CHECK4/15/2013 4/15/2013 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  4/15/2013 DONE
Inspection Record Card- Bld  4/15/2013 DONE
DetailsTisha Gallop
Permit Ready to Issue  4/15/2013 DONE
DetailsTisha Gallop
Routing - MECHANICAL4/11/2013 4/11/2013 PASS
DetailsTroy James
Routing - PLAN CHECK4/4/2013 4/4/2013 FAIL
DetailsCarl D Madsen
Routing - PLANNING4/1/2013 4/1/2013 PASS
DetailsDavid Moser
Routing PW Grading-Hillside4/1/2013 4/1/2013 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing sub-grade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####


Routing - MECHANICAL2/20/2013 2/20/2013 FAIL
DetailsTroy James
corrections from previous review has not been addressed
EPLAN
Routing PW Grading-Hillside2/20/2013 2/20/2013 FAIL
DetailsJason C. Taylor
Geotechnical report needs updated, grading plan shows fill outside property boundaries, retaining walls need engineering. Call Jason Taylor at ###-#### for details.
Routing - PLAN CHECK12/18/2012 1/7/2013 FAIL
DetailsCarl D Madsen
Engineering has used a soil bearing pressure of 4000 PSF Geotechnical report indicates a soil bearing of 1200 PSF. 1-7-13 CDM
1st review completed  1/7/2013 FAIL
Route to Impact Fee Review12/18/201212/21/201212/31/2012 PASS
DetailsCindy M. Gould
Routing - MECHANICAL12/18/2012 12/21/2012 FAIL
DetailsTroy James
eplan
Routing PW Grading-Hillside12/18/2012 12/20/2012 FAIL
DetailsJason C. Taylor
Category 1 Hillside appplication needed. Revised plans are to be submitted via ePlan Review per Larry Keller.
Routing - Addressing12/18/2012 12/19/2012 PASS
DetailsApril Wing
Routing - PUBLIC WORKS12/18/2012 12/19/2012 PASS
DetailsConnie Baumgartner
Routing - FIRE12/19/2012 12/19/2012 PASS
DetailsScott Arellano
Plans are approved with the shown fire sprinkler system as an acceptable code alternate to IFC 503.1.1. The Fire Sprinker system shall be designed in accordance with NFPA 13D and permitted separately.

Routing - Erosion and Sediment12/18/2012 12/18/2012 CANC
DetailsKimberly M. Johnson
No review needed. See ESC12-00768
Routing - PLANNING12/18/2012 12/18/2012 FAIL
DetailsDavid Moser
Requires Cat I Planning application
Plans ACCEPTED BY PLAN TECH  12/18/2012 DONE
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  12/18/2012 DONE
DetailsChristina Prado
Intake Approval  12/7/2012 PASS
DetailsBarbara Stitt
Failed for Structural calcs and geo-technical report needed//12-7-12//BAS
Application received  11/14/2012 DONE
Application submitted via PDS Online on Nov 14 2012 1:03PM