Third Notice | | 2/26/2013 | 2/27/2013 | | DONE |
|
|
|
|
Third Notice | | 2/2/2013 | 2/21/2013 | | DONE |
|
|
|
mailed to First Team Restoration
|
Second Notice | | 1/13/2013 | 1/28/2013 | | DONE |
|
|
|
|
First Notice | 12/17/2012 | 12/17/2012 | 1/3/2013 | | DONE |
Jim Sly
|
|
|
mailed 01-03-13
|
BLD-Final | 12/17/2012 | 12/17/2012 | 12/17/2012 | P | PASS |
Jim Sly
|
|
|
Brandon Phone #: ###-#### No need for Plumb permit.....Just changed out toilet.
|
DOC - Permit Finaled | 12/17/2012 | 12/17/2012 | 12/17/2012 | P | PASS |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 11/19/2012 | 11/20/2012 | 11/20/2012 | A | PASS |
Jim Storey
|
|
|
Brandon Phone #: ###-####
|
Issue PAID IN FULL permit | | | 11/19/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (DRS) | 11/16/2012 | 11/16/2012 | 11/16/2012 | | PASS |
Dan Stuart
|
|
|
|
Plan assigned to (CDM) | 11/14/2012 | 11/14/2012 | 11/16/2012 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/16/2012 | | PASS |
Dan Stuart
|
|
|
|
Inspection Record Card- Bld | | | 11/16/2012 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/16/2012 | | |
|
|
|
|
Telephone call | | | 11/16/2012 | | |
|
|
|
11-16-12 called Fires Team Restoration permit ready and fee given . Also need GC Form ///dld
|
Routing - PLAN CHECK | 11/16/2012 | | 11/16/2012 | | PASS |
Dan Stuart
|
|
|
Copy of floor plan from our records with repairs indicated and a piture of the wall damaged are attached to this permit.
|
1st review completed | | | 11/16/2012 | | PASS |
Dan Stuart
|
|
|
|
Telephone call | | | 11/14/2012 | | DONE |
|
|
|
Called Jim Storey to review scope of damage and if engineering analysis for structural repair was needed. Jim said no need for structural engineer. Reviewed with Jason Blais - okay per Jim's analysis.
|
Plans ACCEPTED BY PLAN TECH | | | 11/14/2012 | | DONE |
Christina Prado
|
|
|
|
Application received | | 11/14/2012 | | | |
|
|
|
|
Routing - PLAN CHECK | 11/14/2012 | | | | |
Carl D Madsen
|
|
|
|