DOC - Permit Finaled | | | 12/23/2015 | | DONE |
|
|
|
|
BLD-Final | 4/23/2013 | 4/24/2013 | 4/26/2013 | A | DONE |
Tony Young
|
|
|
|
BLD-Other | 4/23/2013 | 4/23/2013 | 4/23/2013 | P | CANC |
Tony Young
|
|
|
double 5/8 sheet rock on sofits inspection please-John Phone #: ###-####,, wrong permit
|
BLD-Final | 11/27/2012 | 11/27/2012 | 11/27/2012 | P | PASS |
Tony Young
|
|
|
Kelly Phone #: ###-####
|
BLD-Final | 11/21/2012 | 11/27/2012 | 11/27/2012 | A | PASS |
Tony Young
|
|
|
Kelly Phone #: ###-####
|
FIRE-Final Inspection | 11/21/2012 | 11/21/2012 | 11/23/2012 | P | PASS |
Forrest France
|
|
|
Fire life safety okay pending removal of the manual thumbturn at the main entry/exit and "door to remain... " signage is posted. Items to be completed prior to structural final as agreed.
|
BLD-Final | 11/21/2012 | 11/21/2012 | 11/21/2012 | P | PART |
Tony Young
|
|
|
Kelly Phone #: ###-####,, temp occ ok,, need to change lock on front door,, need sign to be unlocked..
|
Plan assigned to (TLW) | 11/14/2012 | | 11/21/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 11/14/2012 | | 11/21/2012 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 11/21/2012 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/21/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 11/21/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 11/21/2012 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 11/21/2012 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 11/21/2012 | | DONE |
Barbara Stitt
|
|
|
Called Kelly and told her that her permit is ready on 11-21-12 @ 10:15am//BAS
|
Issue PAID IN FULL permit | | | 11/21/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/14/2012 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/14/2012 | | DONE |
Christina Prado
|
|
|
|
Application received | | 11/14/2012 | | | |
|
|
|
|