Telephone call | | | 12/29/2015 | | DONE |
|
|
|
GC is going to look up project and call make for final inspections
|
FIRE-Final Inspection | 1/29/2013 | 1/30/2013 | 1/30/2013 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 1/14/2013 | 1/15/2013 | 1/15/2013 | P | PART |
Mike Jordan
|
|
|
Steve Hart Phone #: ###-####. ok for temp occ. pending structural calcs for new rtu and special inspection report.
|
FIRE-Final Inspection | 1/14/2013 | 1/15/2013 | 1/15/2013 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with Scott Arellano's permission until the fire alarm aspect of the project has been addressed. A permit needs to be pulled to tie in one duct smoke detector to the existing fire alarm system. The second duct smoke detector either needs to be connected as well or removed since it appears to meet the exception of the mechanical code for supplying air within a single compartment.
|
FIRE-Conference | 1/10/2013 | 1/10/2013 | 1/10/2013 | P | DONE |
Troy Cobbley
|
|
|
I went over life safety requirements with the builder. Specifically the exit sign placement and the apparent need for a fire alarm permit due to the Mechanical drawings indicating two new duct smoke detectors on RTU-1 abd RTU-2.
|
BLD-Ceiling Grid Inspection | 1/8/2013 | 1/9/2013 | 1/9/2013 | P | PASS |
Mike Jordan
|
|
|
steve Phone #: ###-####
|
BLD-Framing/Rough-in | 12/31/2012 | 12/31/2012 | 12/31/2012 | P | PASS |
Jim Storey
|
|
|
Steve Phone #: ###-#### wall and hardceilling ok to cover
|
BLD-Framing/Rough-in | 12/18/2012 | 12/19/2012 | 12/19/2012 | P | PASS |
Mike Jordan
|
|
|
steve Phone #: ###-####. Interior steel walls only ok. No grid or restroom walls at this time.
|
Issue PAID IN FULL permit | | | 12/14/2012 | | DONE |
|
|
|
|
1st review completed | | | 11/26/2012 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/26/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 11/26/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 11/26/2012 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 11/26/2012 | | DONE |
|
|
|
emailed westley permit ready fees given
|
Permit Ready to Issue | | | 11/26/2012 | | DONE |
|
|
|
|
Plan assigned to (TLW) | | | 11/26/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 11/19/2012 | | 11/26/2012 | | PASS |
Tim L. Woodard
|
|
|
Calculations on roof framing details will be provided prior to inspections on new roof framing for new RTU locations. TLW
|
Routing - PUBLIC WORKS | 11/19/2012 | | 11/21/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Rating | 11/21/2012 | | 11/21/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 11/20/2012 | | 11/20/2012 | | PASS |
April Wing
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/19/2012 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 11/19/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/19/2012 | | DONE |
Christina Prado
|
|
|
|
Application received | | 11/19/2012 | | | |
|
|
|
|