Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD12-03081
StatusFinaled
Name AERO CONSTRUCTION
Site Address 1181 N MILWAUKEE ST
Project NameDutch Bros Coffee Tenant Impro
Customer Number 
ePlanReviewYes
Description
(DUTCH BROTHERS COFFEE) Permit is to remodel an existing 819 square foot drive-thru building. This building was originally approved by the State as a Modular Building and moved onto the site under BLD95-00978. Work includes: construction of new interior non-bearing walls to create new storage room, construction of new exterior parapets, installation of new plumbing, installation of new doors / accessible hardware, installation of new glass roll down door, installation of new exterior glazing in existing storefront, and interior finishes. This building is not fully Fire Sprinklered. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  9/23/2013 DONE
DetailsChristina Prado
Second Notice 7/13/20137/30/2013 DONE
First Notice 6/21/20137/3/2013 DONE
Permanent Occupancy  6/11/2013 DONE
DetailsTisha Gallop
BLD-Final6/6/20136/6/20136/6/2013PPASS
DetailsMike Jordan
Derek Phone #: ###-####. OK for perm occ.
FIRE-Final Inspection6/6/20136/6/20136/6/2013PPASS
DetailsTroy Cobbley
life safety passed
FIRE-Final Inspection6/6/20136/6/20136/6/2013PFAIL
DetailsTroy Cobbley
Post the building address and provide remove the three dead bolts.
Zoning Approval6/6/20136/6/20136/6/2013 PASS
DetailsJosh Wilson
Print Occupancy Form  6/6/2013 DONE
DetailsBarbara Stitt
BLD-Ceiling Grid Inspection5/22/20135/23/20135/23/2013APASS
DetailsMike Jordan
Eric Phone #: ###-####
BLD-Ceiling Grid Inspection5/22/20135/22/20135/22/2013PPASS
DetailsMike Jordan
Eric Phone #: ###-####
BLD-Framing/Rough-in4/26/20134/29/20134/29/2013PPASS
DetailsMike Jordan
Eric Phone #: ###-####. Interior steel stud wal for dry storage room.
Print Occupancy Form  2/28/2013 DONE
Permit Ready to Issue  2/28/2013  
Issue PAID IN FULL permit  2/28/2013 DONE
Plan resubmittals received  2/8/2013 DONE
DetailsTim L. Woodard
E-Plan Revisions Recieved. TLW
Routing - PLAN CHECK2/8/2013 2/8/2013 PASS
DetailsTim L. Woodard
Approved with redlines. TLW
PLANS/APPL TAKEN TO FRONT DESK  2/8/2013 DONE
DetailsTim L. Woodard
Plan assigned to (TLW)1/30/2013 2/8/2013 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK1/30/2013 2/7/2013 FAIL
DetailsTim L. Woodard
Needs accessible route into and out of. TLW
1st review completed  2/7/2013 FAIL
DetailsTim L. Woodard
Routing - FIRE1/30/2013 2/4/2013 PASS
DetailsScott Arellano
Approved with comments.
Routing PW Sewer Rating1/31/2013 1/31/2013 PASS
DetailsConnie Baumgartner
Routing - PLUMBING1/30/2013 1/31/2013 PASS
DetailsDaryl Spivey
1. May require additional backflow protection with the addition and or changing of equipment.
2. a DCVA will be required on water service if there is not one installed at present time.
Routing - PLANNING1/30/2013 1/31/2013 PASS
DetailsJosh Wilson
Routing - Addressing1/30/2013 1/31/2013 PASS
DetailsApril Wing
Routing - PUBLIC WORKS1/30/2013 1/31/2013 PASS
DetailsBeverly Mountain
Payment Received  1/30/2013 DONE
Payment received via Govolutions
Intake Approval  1/30/2013 PASS
DetailsTim L. Woodard
Intake Approval  11/28/2012 FAIL
DetailsTim L. Woodard
Need checklist uploaded and structural engineering. TLW
Application received  11/21/2012 DONE
Application submitted via PDS Online on Nov 21 2012 2:18PM