FIRE-Conference | 12/18/2012 | 12/19/2012 | 12/20/2012 | P | CANC |
Troy Cobbley
|
|
|
Anita Phone #: ###-#### Still waiting for a clarification for the building code officail on the exit hardware.
|
FIRE-Conference | 12/11/2012 | 12/18/2012 | 12/18/2012 | A | DONE |
Troy Cobbley
|
|
|
Anita and I spoke about the life safety requirements. It appears everything is ok except for the hardware at the sliding glass door exit. I have spoke to Tim Woodard about it and he is going to conference with Jason and get back to me.
|
Issue PAID IN FULL permit | | | 12/11/2012 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (TLW) | 11/21/2012 | | 12/3/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 11/26/2012 | | 12/3/2012 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 12/3/2012 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/3/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 12/3/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Telephone call | | | 12/3/2012 | | DONE |
Christina Prado
|
|
|
called Anita to advise permit is ready for pick up
|
Print Occupancy Form | | | 12/3/2012 | | DONE |
Christina Prado
|
|
|
|
Override - Parcel Holds | | | 12/3/2012 | | |
|
|
|
|
Permit Ready to Issue | | | 12/3/2012 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 11/26/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Application received | | 11/21/2012 | 11/21/2012 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/21/2012 | | DONE |
Tisha Gallop
|
|
|
|