Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberBLD12-03086
StatusFinaled
Name VERTICAL CORP
Site Address 3072 S BOWN WAY
Project NameEastside Cycles
Customer Number 
ePlanReviewNo
Description
(EASTSIDE CYCLES – Bown Crossing Market Place - BLDG D – 1st Story) This building is fire sprinklered for story increase. To remodel a 1,680 square foot retail sales tenant space on the 1st story of an existing 7,100 square foot, 2 story building. This tenant space was previously occupied under BLD07-03215 (by JONATHON'S FLORAL DESIGN). Work is to include: interior nonbearing walls to create an office, relocate a mopsink, installation of interior pocket door with accessible hardware, and interior finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 6/9/20136/10/2013 DONE
Third Notice 4/28/20136/4/2013 DONE
faxed
Second Notice 4/1/20134/23/2013 DONE
First Notice 3/7/20133/22/2013 DONE
Faxed 3-22-13
Permanent Occupancy  2/25/2013 DONE
BLD-Final2/19/20132/20/20132/20/2013APASS
DetailsJim Storey
Todd Phone #: ###-####
FIRE-Final Inspection2/19/20132/19/20132/19/2013PPASS
DetailsForrest France
Corrections verified for completion. Fire life safety finaled.
FIRE-Final Inspection2/14/20132/14/20132/15/2013PFAIL
DetailsForrest France
Repair three exit signs/EM lights on battery backup, provide current certification for the fire extinguishers.
FIRE-Sprinkler Rough-in2/5/20132/5/20132/5/2013APART
DetailsForrest France
Project related fire sprinkler permit work completed and passed inspections.
FIRE-Conference1/18/20131/18/20131/18/2013PDONE
DetailsForrest France
Regarding project related fire sprinkler work.
Print Occupancy Form  11/29/2012 DONE
Telephone call  11/29/2012 DONE
DetailsChristina Prado
called Tom to advise permit is ready and GC is required
Permit Ready to Issue  11/29/2012 DONE
DetailsChristina Prado
Issue PAID IN FULL permit  11/29/2012 DONE
DetailsBarbara Stitt
1st review completed  11/28/2012 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  11/28/2012 DONE
DetailsTim L. Woodard
Case Summary (BLD)  11/28/2012 DONE
DetailsTim L. Woodard
Plan assigned to (TLW)  11/28/2012 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK11/26/2012 11/28/2012 PASS
DetailsTim L. Woodard
Routing - PUBLIC WORKS11/21/2012 11/26/2012 PASS
DetailsConnie Baumgartner
Routing PW Sewer Rating11/26/2012 11/26/2012 PASS
DetailsConnie Baumgartner
Routing - Addressing11/23/2012 11/23/2012 PASS
DetailsApril Wing
Plans ACCEPTED BY PLAN TECH  11/21/2012 DONE
DetailsChristina Prado
Intake Approval  11/21/2012 PASS
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  11/21/2012 DONE
DetailsChristina Prado
Application received 11/21/2012