Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD12-03138
StatusFinaled
Name UNICO PROPERTIES
Site Address 101 S CAPITOL BLVD Unit: 1600
Project NameUS Bank
Customer Number 
ePlanReviewNo
Description
(Andersen Banducci - US Bank – Ste# 1600) Permit is to remodel an existing 9,194 square foot office space into two smaller office spaces. This space will be 7,302 square feet. The other space will be 1,892 square feet and is permitted under BLD12-03225. Building permit approval contingent upon adhering to the approved plans on file. Work to include: [construction of interior non-bearing walls to create, 15 offices, a 630 sq. ft. break room, two conference rooms, two open office areas, two war rooms, a breakout space (break room), a shower room, and isolate off this area from the larger tenant space], installation of new break room sink, installation of new doors / hardware, installation of new tempered glazing, new lighting, and finishes in compliance with chapter 8 of the 2006 IBC. This building is fully fire sprinklered any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA #13 as regulated by the fire department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  7/23/2013 DONE
DetailsChristina Prado
Print Occupancy Form  6/11/2013 DONE
DetailsChristina Prado
Permanent Occupancy  6/11/2013 DONE
DetailsChristina Prado
MISC ACTIONS  6/10/2013 DONE
DetailsChristina Prado
per tenant request prior to building final - added tenant name and printed C of O. This is oked per Tim Woodard as the occupancy was already set
First Notice4/24/20134/24/20136/4/2013 DONE
DetailsDave Hannah
mailed 6-5-13
BLD-Final4/23/20134/23/20134/24/2013PPASS
DetailsDave Hannah
sam Phone #: ###-####
DOC - Permit Finaled4/24/20134/24/20134/24/2013APASS
DetailsDave Hannah
FIRE-Final Inspection4/23/20134/23/20134/23/2013PPASS
DetailsForrest France
Fire life safety final approved.
BLD-Final1/17/20131/18/20131/28/2013PPART
DetailsDave Hannah
sam Phone #: ###-#### ok for temp
FIRE-Final Inspection1/17/20131/18/20131/18/2013PPART
DetailsForrest France
Fire life safety passed with the exception of conference rooms 1603 and 1604- finishes underway.
BLD-Other1/10/20131/11/20131/11/2013APASS
DetailsDave Hannah
sam Phone #: ###-#### ceiling grid ok to cover
BLD-Framing/Rough-in1/8/20131/8/20131/9/2013PPASS
DetailsDave Hannah
sam Phone #: ###-#### plumbing walls ok to cover
BLD-Framing/Rough-in12/20/201212/20/201212/20/2012PPASS
DetailsDave Hannah
sam Phone #: ###-####
Issue PAID IN FULL permit  12/17/2012 DONE
Plan assigned to (TLW)11/29/2012 12/13/2012 PASS
DetailsTim L. Woodard
Routing - Addressing12/11/2012 12/13/2012 PASS
DetailsTim L. Woodard
Approved on routing slip. TLW
Routing - PLAN CHECK12/13/2012 12/13/2012 PASS
DetailsTim L. Woodard
Approved with redlines and plan review report. TLW
1st review completed  12/13/2012 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  12/13/2012 DONE
DetailsTim L. Woodard
Case Summary (BLD)  12/13/2012 DONE
DetailsTim L. Woodard
Inspection Record Card- Bld  12/13/2012 DONE
Telephone call  12/13/2012 DONE
DetailsChristina Prado
called Adrienne to advise permit is ready and GC is required prior to issuance
Permit Ready to Issue  12/13/2012 DONE
DetailsChristina Prado
Routing - PLAN CHECK12/3/2012 12/11/2012 PEND
DetailsTim L. Woodard
routed back to Addressing for BLD12-03225 to be given a suite number. TLW
1st review completed  12/11/2012 DONE
DetailsTim L. Woodard
Routing PW Sewer Rating12/3/2012 12/3/2012 PASS
DetailsConnie Baumgartner
Routing - PUBLIC WORKS11/29/2012 12/3/2012 PASS
DetailsConnie Baumgartner
Routing - Addressing11/30/2012 11/30/2012 PASS
DetailsApril Wing
Application received 11/29/201211/29/2012 DONE
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  11/29/2012 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  11/29/2012 DONE
DetailsTisha Gallop