Permit Information
Permit NumberBLD12-03165
StatusFinaled
Name VERTICAL CORP
Site Address 246 N 8TH ST
Project NameThe Fidelity Building
Customer Number 
ePlanReviewYes
Description
(BITTERCREEK ALEHOUSE / RED FEATHER LOUNGE - REMODEL) Fire sprinkler system used to substitute for 1-hr fire-resistance-rated construction. To remodel an existing restaurant tenant space (3,677 square feet at the grade level and 389 square feet on the mezzanine level) located within an existing historic building. No portion of the basement is approved for public occupancy. The code upgrades required to allow the public in the basement room at the bottom of the spiral stairway will be done under a separate permit. Work is to include interior nonbearing walls, new entry vestibules with gypsum board ceilings, new exterior doors, furred walls over interior windows, restaurant equipment, relocated Class II hood, and finishes. A new beam will be provided in the basement to strengthen the floor above. The existing grease hoods will be maintained. No new grease hoods are proposed. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The existing restrooms are required to be maintained accessible to the disabled. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 6/14/20136/19/2013 DONE
DetailsChristina Prado
completed 6-19-2013
First Notice 5/30/20136/4/2013 DONE
DetailsChristina Prado
mailed 6-5-13
FIRE-Final Inspection5/17/20135/20/20135/20/2013APASS
DetailsForrest France
Correction items field verified. Fire life safety passed.
BLD-Final5/17/20135/20/20135/20/2013APASS
DetailsDave Hannah
Kent Phone #: ###-####
Permanent Occupancy  5/20/2013 DONE
DetailsBarbara Stitt
BLD-Final5/9/20135/10/20135/10/2013PPART
DetailsJim Sly
Late in the day, if possible. thx Phone #: ###-#### >> Inspection requested via web by Todd Weltner
OK for Temp Occ .OK for Perm when Fire Alarm, Fire Life, and Plumbing Perms. Corrections....Check (2) doors and hardware at front of Bldg. Check lower part of handrail at stairway to Mezzanine.
FIRE-Final Inspection5/9/20135/10/20135/10/2013PPART
DetailsForrest France
Final pending project related fire alarm permit (under review), install three missing exit signs per approved plan and as discussed, post max. occupant load signs, doors and hardware at the main entry to be completed. Temporary occuapncy approved with conditions.
FIRE-Alarm Testing5/9/20135/10/20135/10/2013APART
DetailsForrest France
Completed functional test of two relocated manual pull stations and verification of offsite monitoring.
Zoning Approval5/10/20135/10/20135/10/2013 PASS
DetailsJosh Wilson
BLD-Framing/Rough-in5/2/20135/2/20135/3/2013PPASS
DetailsDave Hannah
Kent-ceiling grid inspection please Phone #: ###-####
BLD-Framing/Rough-in4/19/20134/19/20134/19/2013APASS
DetailsDave Hannah
Please call Kent to coordinate. Request inspection at 11:00. thx Phone #: ###-#### >> Inspection requested via web by Todd Weltner
Print Occupancy Form  4/16/2013 DONE
DetailsTisha Gallop
Issue PAID IN FULL permit  4/16/2013 DONE
DetailsTisha Gallop
Permit Ready to Issue  4/15/2013 DONE
DetailsTisha Gallop
Plan assigned to (CJW)2/22/20132/22/20134/8/2013 PASS
DetailsCarl Westfall
BITTERCREEK ALEHOUSE/RED FEATHER LOUNGE (20 days - March 20) ePlanReview
Routing - PLAN CHECK4/4/2013 4/8/2013 PASS
DetailsCarl Westfall
Drawings approved with "red lines" after the resubmittal review.
PLANS/APPL TAKEN TO FRONT DESK  4/8/2013 DONE
Plan resubmittals received  4/4/2013 DONE
Plan Reviewer's activity  3/29/2013 DONE
Because the ePlan standards were not followed, the uploaded sheets were deleted and the workflow was sent back to the Architect. The revised drawings were not given the exact name as the drawings they were intended to replace.
Plan resubmittals requested  3/21/2013 DONE
Finished workflow in ePlan
1st review completed  3/20/2013  
Routing - FIRE2/22/2013 3/20/2013 PASS
DetailsScott Arellano
Attached comments to plans.
Routing - PLAN CHECK2/22/2013 3/19/2013 FAIL
DetailsCarl Westfall
The IBC plan review was started on March 8 and was finished on March 19. Revised drawings were required. See the plan review report.
Routing - PLUMBING2/22/2013 2/26/2013 PASS
DetailsBill VanDegrift
1) vent connections must be made 6" above flood level of fixtures.
2) R.P.will be required upstream of the filter system.
Routing - Addressing2/22/2013 2/25/2013 PASS
DetailsApril Wing
Change the address from 242 N 8th St to 246 N 8th St to reflect correct address for site.
Routing - PUBLIC WORKS2/22/2013 2/22/2013 PASS
Details
Routing - Design Review2/22/2013 2/22/2013 PASS
DetailsAndrea Tuning
Andrea Tuning - DRH12-00335
Routing PW Environmental2/22/2013 2/22/2013 PASS
DetailsWalt Baumgartner
Ensure any plumbing pipe changes routes all kitchen wastewater to existing Grease INterceptor
Routing Off Site - C.D.H2/22/2013 2/22/2013 PASS
DetailsByron Grover
Routing PW Sewer Rating2/22/2013 2/22/2013 PASS
Details
Pending Assignment by JCB2/22/2013 2/22/2013 DONE
DetailsJason Blais
Intake Approval  2/21/2013 PASS
Old plan intake void. New plan intake approved.
Intake Approval  1/3/2013 FAIL
Sheets still not oriented properly.
Intake Approval  1/3/2013 PASS
Plan intake approved
Intake Approval  12/6/2012 FAIL
Please refer to the circled items on the plan intake checklist. Architectural sheets not oriented properly, planning approval of exterior changes not provided, and new beam in the basement not designed. Please resolve these items.
Application received  12/4/2012 DONE
Application submitted via PDS Online on Dec 4 2012 11:23AM