Second Notice | | 6/14/2013 | 6/14/2013 | | DONE |
Christina Prado
|
|
|
complete 6-14-2013
|
First Notice | | 5/10/2013 | 6/4/2013 | | DONE |
Christina Prado
|
|
|
mailed 6-5-13
|
Permanent Occupancy | | | 4/30/2013 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 4/24/2013 | 4/26/2013 | 4/26/2013 | P | PASS |
Tom Arcoraci
|
|
|
jake Phone #: ###-####
|
FIRE-Final Inspection | 4/24/2013 | 4/26/2013 | 4/26/2013 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Framing/Rough-in | 4/9/2013 | 4/10/2013 | 4/10/2013 | P | PASS |
Mike Jordan
|
|
|
jake Phone #: ###-####. Steel studs for cloud now supported from top chords of joist.
|
BLD-Framing/Rough-in | 4/8/2013 | 4/9/2013 | 4/9/2013 | A | FAIL |
Mike Jordan
|
|
|
Jake Dawson Phone #: ###-####. Stell stud framing for "cloud" must be suspended from top chords of ceiling joist.
|
FIRE-Conference | 3/28/2013 | 3/28/2013 | 3/28/2013 | P | DONE |
Troy Cobbley
|
|
|
Jake and I discussed the need to maintain the fire protection on the abandoned side of the wall. This fire protection would include sprinklers and fire alarm for the smoke evac system.
|
BLD-Framing/Rough-in | 3/26/2013 | 3/27/2013 | 3/27/2013 | P | PART |
Mike Jordan
|
|
|
jake Phone #: ###-####. Interior steel steud framed walls ok. Pending electrical rough in inspection.
|
BLD-Framing/Rough-in | 3/21/2013 | 3/22/2013 | 3/22/2013 | A | PART |
Mike Jordan
|
|
|
jake Phone #: ###-####Storefront columns only ok to sheet.
|
Issue PAID IN FULL permit | | | 3/4/2013 | | DONE |
|
|
|
|
(F) Reprint permit | | | 3/4/2013 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/18/2012 | | 1/30/2013 | | PASS |
Tim L. Woodard
|
|
|
Approved with resubmittals. TLW
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/30/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 1/30/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 1/30/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 1/30/2013 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 1/30/2013 | | DONE |
|
|
|
spoke with linsay permit ready fees given need gc
|
Permit Ready to Issue | | | 1/30/2013 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 12/5/2012 | | 1/30/2013 | | PASS |
Tim L. Woodard
|
|
|
|
Plan resubmittals received | | | 1/22/2013 | | DONE |
|
|
|
rec'd two copies of sheets CS; IS1; A1; M1; E0; E2; response letters and transmittal - taken to Tim W
|
Routing - FIRE | 12/17/2012 | | 12/18/2012 | | PASS |
Scott Arellano
|
|
|
Attached plan review comments to plans.
|
1st review completed | | | 12/18/2012 | | FAIL |
|
|
|
Failed Plan check.
|
Routing - PLAN CHECK | 12/7/2012 | | 12/17/2012 | | FAIL |
Tim L. Woodard
|
|
|
Refer to plan review report. TLW
|
Routing PW Sewer Rating | 12/7/2012 | | 12/7/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PUBLIC WORKS | | | 12/7/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 12/5/2012 | | 12/6/2012 | | PASS |
April Wing
|
|
|
|
Application received | | 12/5/2012 | 12/5/2012 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/5/2012 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/5/2012 | | DONE |
|
|
|
|