Second Notice | | 5/10/2013 | 5/2/2013 | | DONE |
|
|
|
|
First Notice | | 4/8/2013 | 4/30/2013 | | DONE |
Barbara Stitt
|
|
|
Mailed 4-30-13
|
Print Occupancy Form | | | 3/29/2013 | | DONE |
Tisha Gallop
|
|
|
|
Permanent Occupancy | | | 3/29/2013 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 3/26/2013 | 3/26/2013 | 3/27/2013 | P | PASS |
Dave Hannah
|
|
|
Ed Phone #: ###-####
|
Zoning Approval | 3/27/2013 | 3/27/2013 | 3/27/2013 | | PASS |
Josh Wilson
|
|
|
|
BLD-Final | 3/13/2013 | 3/13/2013 | 3/15/2013 | P | PART |
Dave Hannah
|
|
|
ed - call 15 mins prior Phone #: ###-#### everything is ok but I need mti final letter on spec inspection
|
FIRE-Final Inspection | 3/13/2013 | 3/13/2013 | 3/14/2013 | P | PASS |
Forrest France
|
|
|
Fire life safety approved pending the 1A rated extinguisher is replaced with a min 2A10BC as discussed and per review comments.
|
BLD-Other | 2/19/2013 | 2/20/2013 | 2/20/2013 | A | PASS |
Dave Hannah
|
|
|
rebar//Ed Phone #: ###-#### cmu wall ok to grout
|
BLD-Other | 2/12/2013 | 2/13/2013 | 2/13/2013 | A | PASS |
Dave Hannah
|
|
|
Concrete re-enforecement inspection--Ed--PLease call prior to inspection Phone #: ###-####
|
FIRE-Alarm Testing | 2/6/2013 | 2/6/2013 | 2/6/2013 | P | PASS |
Forrest France
|
|
|
Project related fire alarm permit work completed and passed inspection.
|
BLD-Other | 2/4/2013 | 2/4/2013 | 2/4/2013 | P | PART |
Dave Hannah
|
|
|
ed Phone #: ###-#### concrete drive ok to place concrete
|
BLD-Energy code compliance | 1/24/2013 | 1/25/2013 | 1/25/2013 | A | PASS |
Dave Hannah
|
|
|
Ed Phone #: ###-####
|
BLD-Framing/Rough-in | 1/22/2013 | 1/22/2013 | 1/23/2013 | P | PART |
Tony Young
|
|
|
ed please call before going out Phone #: ###-####,, walls ok,, (front portal not ready) ok to insulate,, prior to cover there needs to be a mechanical inspection to see the condensate drain line
|
BLD-Conference | 1/14/2013 | 1/15/2013 | 1/15/2013 | A | DONE |
Dave Hannah
|
|
|
Ed Phone #: ###-####
|
FIRE-Conference | 1/10/2013 | 1/11/2013 | 1/11/2013 | A | DONE |
Forrest France
|
|
|
On site conference with contractor regarding fire sprinkler and fire alarm system modifications that may be necessary due to the remodel work and change of use.
|
Issue PAID IN FULL permit | | | 1/8/2013 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (CJW) | 12/6/2012 | 12/6/2012 | 1/7/2013 | | PASS |
Carl Westfall
|
|
|
REIFSCHNEIDER GARAGE (20 days - Jan 1)
|
Routing - PLAN CHECK | 12/31/2012 | | 1/7/2013 | | PASS |
Carl Westfall
|
|
|
Drawings approved after the resubmittal review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/7/2013 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/7/2013 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 1/7/2013 | | |
|
|
|
|
Telephone call | | | 1/7/2013 | | |
|
|
|
1-7-13 called Thomas Zabala permit ready and fee given ///dld
|
Plan resubmittals received | | | 1/2/2013 | | DONE |
Tisha Gallop
|
|
|
received two copies of response, supplemental structural calcs, and plan sheets G-002, G-003, A-102, A-201, A-301, A-501, A-601, S5.0; taken to Carl Westgall.
|
Route to Impact Fee Review | 12/21/2012 | 12/27/2012 | 12/31/2012 | | PASS |
Cindy M. Gould
|
|
|
No impact fees
|
Routing - FIRE | 12/21/2012 | 12/21/2012 | 12/31/2012 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans.
|
1st review completed | | | 12/31/2012 | | FAIL |
|
|
|
Failed Plan Check.
|
Routing - PLAN CHECK | 12/11/2012 | | 12/21/2012 | | FAIL |
Carl Westfall
|
|
|
The IBC plan review was started on Dec 20 and was finished the next day. Revised drawings were required. See the plan review report.
|
Routing - Design Review | 12/11/2012 | | 12/11/2012 | | PASS |
Josh Wilson
|
|
|
Josh Wilson - DRH12-00325
|
Routing - Erosion and Sediment | 12/7/2012 | | 12/11/2012 | | PASS |
Kimberly M. Johnson
|
|
|
|
Routing - PLANNING Land Div | 12/11/2012 | | 12/11/2012 | | PASS |
Dave Abo
|
|
|
Unit G-9 in Tenth and Main Condominiums.
|
Routing - Addressing | 12/6/2012 | | 12/7/2012 | | PASS |
April Wing
|
|
|
|
Routing - PUBLIC WORKS | | | 12/7/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Rating | 12/7/2012 | | 12/7/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Plan resubmittals received | | | 12/6/2012 | | DONE |
Christina Prado
|
|
|
received one full new set of plans stamped by ACHD. Gave to Carl Westfall to be added with plan sheets
|
Pending Assignment by JCB | 12/5/2012 | | 12/6/2012 | | DONE |
Jason Blais
|
|
|
|
Application received | | 12/5/2012 | 12/5/2012 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 12/5/2012 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/5/2012 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/5/2012 | | DONE |
|
|
|
|
Intake Approval | | | 12/5/2012 | | PASS |
Sam Zahorka
|
|
|
|