Second Notice | | 7/8/2013 | 7/8/2013 | | DONE |
|
|
|
completed 7-9-13
|
First Notice | | 6/17/2013 | 6/28/2013 | | DONE |
|
|
|
mailed 7-1-13
|
BLD-Final | 6/6/2013 | 6/7/2013 | 6/7/2013 | A | PASS |
Jim Sly
|
|
|
tony Phone #: ###-#### OK for Perm Occ.
|
Permanent Occupancy | | | 6/7/2013 | | DONE |
Christina Prado
|
|
|
|
Temporary Occupancy | 5/31/2013 | 8/29/2013 | 5/31/2013 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 5/29/2013 | 5/30/2013 | 5/30/2013 | P | PART |
Mike Jordan
|
|
|
Tony Phone #: ###-####. Ok for temp occ. Needs to remove keyed lock from exterior door to activity room.
|
FIRE-Final Inspection | 5/29/2013 | 5/30/2013 | 5/30/2013 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 5/28/2013 | 5/29/2013 | 5/29/2013 | P | FAIL |
Troy Cobbley
|
|
|
Provide all city approved small documents, provide panic hardware at all noted exits, provide remote annunciators/testing for the duct smoke detectors, provide correct occupant load sign number, provide testing of the exit signs/emergency lights.
|
Zoning Approval | 5/28/2013 | 5/28/2013 | 5/28/2013 | | DONE |
Andrea Tuning
|
|
|
|
PubWorks Occupancy Approval | 5/28/2013 | 5/28/2013 | 5/28/2013 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Ceiling Grid Inspection | 5/16/2013 | 5/17/2013 | 5/17/2013 | P | PASS |
Jim Sly
|
|
|
tony Phone #: ###-####
|
BLD-Conference | 5/15/2013 | 5/16/2013 | 5/16/2013 | A | PASS |
Jim Sly
|
|
|
Tony Phone #: ###-####
|
BLD-Energy code compliance | 4/15/2013 | 4/16/2013 | 4/16/2013 | A | PASS |
Jim Sly
|
|
|
Tony Phone #: ###-####
|
BLD-Framing/Rough-in | 4/15/2013 | 4/15/2013 | 4/15/2013 | P | PASS |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 4/11/2013 | 4/12/2013 | 4/15/2013 | P | PASS |
Jim Sly
|
|
|
tony Phone #: ###-####
|
BLD-Framing/Rough-in | 3/29/2013 | 4/1/2013 | 4/1/2013 | A | PASS |
Jim Sly
|
|
|
Shear wall and roof nailing Phone #: ###-#### >> Inspection requested via web by Kent Olsen
|
BLD-Foundation | 2/25/2013 | 2/26/2013 | 2/27/2013 | A | PART |
Jim Sly
|
|
|
tony Phone #: ###-#### Select walls.....OK pending MTI inspection,tests and approvals.
|
BLD-Foundation | 2/21/2013 | 2/22/2013 | 2/22/2013 | P | PART |
Jim Sly
|
|
|
Tony Phone #: ###-#### East Stem Wall OK pending MTI insp. tests and approvals.
|
BLD-Foundation | 2/19/2013 | 2/20/2013 | 2/20/2013 | P | PART |
Jim Sly
|
|
|
tony Phone #: ###-#### East and West walls OK pending MTI insp, tests and approvals.
|
BLD-Foundation | 2/14/2013 | 2/15/2013 | 2/15/2013 | A | PART |
Jim Sly
|
|
|
tony Phone #: ###-#### Footings at South and East walls OK pending MTI insp. tests and approvals. 3000 PSI design .
|
Permit Ready to Issue | | | 2/1/2013 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 2/1/2013 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/1/2013 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/29/2013 | | 1/31/2013 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/31/2013 | | DONE |
John Menard
|
|
|
|
Plan assigned to (JCM) | 12/13/2012 | | 1/31/2013 | | PASS |
John Menard
|
|
|
|
Plan resubmittals requested | | | 1/29/2013 | | DONE |
John Menard
|
|
|
Plan resubmittals requested thru ProjectDox. JCM
|
Plan Reviewer's activity | | | 1/29/2013 | | PASS |
John Menard
|
|
|
Reviewed and approved structural revisions. JCM
|
1st review completed | | | 1/7/2013 | | FAIL |
John Menard
|
|
|
Failed Structural and Building
|
Plan resubmittals requested | | | 1/7/2013 | | DONE |
John Menard
|
|
|
ProjectDox
|
Routing - PLAN CHECK | 12/13/2012 | | 1/7/2013 | | FAIL |
John Menard
|
|
|
|
Routing - PLANNING Land Div | 12/13/2012 | | 1/4/2013 | | PASS |
Todd Tucker
|
|
|
|
Routing PW Solid Waste | 12/13/2012 | | 1/4/2013 | | PASS |
Peter J. McCullough
|
|
|
Carts only
|
Plan resubmittals received | | | 12/27/2012 | | DONE |
|
|
|
rec'd two copies of SWPP plans - taken to John M.
Route to Kim Johnson. Called PD. This plan was prepared for federal NPDES permitting and implementation. No review needed. -KMJ 1/7/2013
|
Routing - FIRE | 12/13/2012 | | 12/21/2012 | | PASS |
Scott Arellano
|
|
|
Plans are approved as shown. Attached Fire Code plan review report to plans.
|
Routing Off Site - STRUCTURAL | 12/13/2012 | | 12/20/2012 | | FAIL |
John Menard
|
|
|
|
Routing PW Drainage | 12/13/2012 | | 12/19/2012 | | PASS |
Brian Murphy
|
|
|
|
Routing - PUBLIC WORKS | 12/13/2012 | | 12/19/2012 | | PASS |
John Menard
|
|
|
|
Routing PW Sewer Design | 12/13/2012 | | 12/18/2012 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Route to Impact Fee Review | 12/13/2012 | | 12/17/2012 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLUMBING | 12/14/2012 | | 12/14/2012 | | PASS |
Daryl Spivey
|
|
|
Per plans and 2003 UPC.
|
Routing - Erosion and Sediment | 12/13/2012 | | 12/14/2012 | | PASS |
Kimberly M. Johnson
|
|
|
|
Routing - Addressing | 12/13/2012 | | 12/14/2012 | | PASS |
April Wing
|
|
|
Address changed to 4552 N Eagle Rd from 4728 N Fan Palm Ave. eff 1/2/13 See Address Doc.
|
Routing - Design Review | 12/13/2012 | | 12/13/2012 | | PASS |
Andrea Tuning
|
|
|
|
Intake Approval | | | 12/13/2012 | | PASS |
John Menard
|
|
|
|
Pending Assignment by JCM | 12/13/2012 | | 12/13/2012 | | DONE |
John Menard
|
|
|
|
Routing PW Street Lights | 12/13/2012 | | 12/13/2012 | | PASS |
Mike D Hedge
|
|
|
No street lights required.
|
Routing PW Sewer Rating | 12/13/2012 | | 12/13/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Application received | | | 12/6/2012 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 6 2012 9:18AM
|