BLD-Final | 12/20/2012 | 12/20/2012 | 12/20/2012 | A | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 12/20/2012 | 12/20/2012 | 12/20/2012 | P | PASS |
Jim Sly
|
|
|
|
FIRE-Final Inspection | 12/14/2012 | 12/18/2012 | 12/18/2012 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
Issue PAID IN FULL permit | | | 12/13/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (DRS) | 12/6/2012 | 12/6/2012 | 12/12/2012 | | PASS |
Dan Stuart
|
|
|
|
Routing - FIRE | 12/10/2012 | | 12/12/2012 | | PASS |
Scott Arellano
|
|
|
Plans are approved as shown. A separate Fire Sprinkler permit is required.
|
1st review completed | | | 12/12/2012 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 12/12/2012 | | 12/12/2012 | | PASS |
Dan Stuart
|
|
|
Plans to permit desk to process and issue permit.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/12/2012 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 12/12/2012 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 12/12/2012 | | DONE |
|
|
|
LM for charles permit ready fees given need gc
|
Permit Ready to Issue | | | 12/12/2012 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/6/2012 | | 12/10/2012 | | PASS |
Dan Stuart
|
|
|
Approved with comments attached. Routing to fire code anlyst for review.
|
Plans ACCEPTED BY PLAN CHECK | | | 12/6/2012 | | DONE |
Dan Stuart
|
|
|
Plans accepted for intake. Owner rep to email a completed Statement of Special Inspection document for the rack anchorage bolts installation in hardended concrete,directly to me. Required before permit can be issued.
|
Intake Approval | | | 12/6/2012 | | PASS |
Dan Stuart
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/6/2012 | | DONE |
Christina Prado
|
|
|
|
CHANGE STATUS TO (REV) | | | 12/6/2012 | | DONE |
Christina Prado
|
|
|
|
Application received | | 12/6/2012 | | | |
|
|
|
|