Third Notice | | 2/2/2014 | 2/7/2014 | | DONE |
|
|
|
|
Print Statement | | | 2/7/2014 | | DONE |
Tisha Gallop
|
|
|
mailed to Jordan Wilcomb Const.
|
Second Notice | | 1/9/2014 | 1/28/2014 | | DONE |
|
|
|
mailed
|
First Notice | | 11/23/2013 | 12/30/2013 | | DONE |
|
|
|
Faxed 12-30-13
|
BLD-Final | 11/12/2013 | 11/13/2013 | 11/13/2013 | A | PASS |
Dave Hannah
|
|
|
TJ Phone #: ###-####
|
Permanent Occupancy | | | 11/13/2013 | | DONE |
Christina Prado
|
|
|
|
FIRE-Final Inspection | 11/5/2013 | 11/6/2013 | 11/6/2013 | A | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
BLD-Final | 10/31/2013 | 10/31/2013 | 11/1/2013 | P | NR |
Dave Hannah
|
|
|
TJ Wilcomb Phone #: ###-#### needs fire finals signed off first
|
Temporary Occupancy | 10/25/2013 | 1/23/2014 | 10/25/2013 | | DONE |
Christina Prado
|
|
|
|
Zoning Approval | 10/24/2013 | 10/24/2013 | 10/24/2013 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Conference | 9/27/2013 | 10/1/2013 | 10/2/2013 | A | PEND |
Dave Hannah
|
|
|
10:30am please-John Sanchez Phone #: ###-#### ada sinks in restrooms
|
Change Expiration Date Only | | | 8/8/2013 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Other | 8/2/2013 | 8/5/2013 | 8/5/2013 | P | PASS |
Dave Hannah
|
|
|
soffit for exterior canopy - john Phone #: ###-####
|
BLD-Final | 7/26/2013 | 7/29/2013 | 7/30/2013 | P | PART |
Dave Hannah
|
|
|
john Phone #: ###-#### ok for temp occ needs to get other trades to pemp and fix ada restroom and finish ext and one handrail
|
FIRE-Final Inspection | 7/26/2013 | 7/29/2013 | 7/29/2013 | A | PART |
Forrest France
|
|
|
Final pending revised plan sheet for changes to the meeting rooms/hallway, missing exit discharge lighting, post signage at the fire riser and alarm panel rooms, project related fire alarm permit final also pending.
|
Temporary Occupancy | 7/29/2013 | 10/27/2013 | 7/29/2013 | | DONE |
Christina Prado
|
|
|
|
Zoning Approval Temp | 7/29/2013 | 7/29/2013 | 7/29/2013 | | DONE |
Andrea Tuning
|
|
|
The applicant has posted a bond for the landscape improvements. The parking lot striping and the exterior facade improvements are also incomplete at this time. Derick O-Neil has allowed a 90 day temporary occupancy with the lnadscaping bonding in place.
|
FIRE-Final Inspection | 7/25/2013 | 7/26/2013 | 7/26/2013 | A | NR |
Forrest France
|
|
|
john - life safety Phone #: ###-####
|
BLD-Final | 7/25/2013 | 7/26/2013 | 7/26/2013 | P | NR |
Dave Hannah
|
|
|
john Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 7/23/2013 | 7/24/2013 | 7/24/2013 | A | PART |
Dave Hannah
|
|
|
john Phone #: ###-#### ok to cover ceiling on west side
|
BLD-Other | 7/12/2013 | 7/12/2013 | 7/12/2013 | P | PART |
Jim Sly
|
|
|
structural celing cover//John Phone #: ###-#### Framing for hard lid ceiling in Ext. patio area.....OK.
|
BLD-Ceiling Grid Inspection | 6/19/2013 | 6/20/2013 | 6/21/2013 | A | PART |
Dave Hannah
|
|
|
john Phone #: ###-#### ok to cover ceilings with hard lids
|
BLD-Framing/Rough-in | 6/3/2013 | 6/4/2013 | 6/6/2013 | P | PASS |
Dave Hannah
|
|
|
john Phone #: ###-#### ok to cover ext walls
|
BLD-Framing/Rough-in | 5/29/2013 | 5/30/2013 | 6/4/2013 | A | PART |
Dave Hannah
|
|
|
John Phone #: ###-#### ok to cover int walls
|
FIRE-Supply Line Cover | 5/23/2013 | 5/23/2013 | 5/23/2013 | A | PART |
Forrest France
|
|
|
UG fire supply line okayed for cover
|
FIRE-Conference | 5/7/2013 | 5/8/2013 | 5/13/2013 | P | DONE |
Forrest France
|
|
|
On site conference regarding project schedule, fire sprinkler and alarm permit work.
|
BLD-Conference | 5/7/2013 | 5/8/2013 | 5/8/2013 | P | DONE |
Jim Sly
|
|
|
Johna Sanchez-at 2:30 please Phone #: ###-#### Met with contractor. OK'd the use of fiberglass insulation for fireblocking if installed properly..
|
BLD-Framing/Rough-in | 5/2/2013 | 5/3/2013 | 5/6/2013 | A | PART |
Dave Hannah
|
|
|
john Phone #: ###-#### ok to one side elec room
|
BLD-Framing/Rough-in | 3/26/2013 | 3/27/2013 | 3/28/2013 | A | PASS |
Dave Hannah
|
|
|
Roof inspection please-John Phone #: ###-####
|
BLD-Framing/Rough-in | 3/19/2013 | 3/19/2013 | 3/21/2013 | P | PART |
Dave Hannah
|
|
|
John Phone #: ###-#### roof sheeting north half ok to cover after they finish edge nailing
|
BLD-Footing | 3/15/2013 | 3/18/2013 | 3/19/2013 | P | PASS |
Dave Hannah
|
|
|
john Phone #: ###-#### ADA ramp
|
BLD-Concrete | 3/11/2013 | 3/12/2013 | 3/12/2013 | P | PASS |
Dave Hannah
|
|
|
concrete slab- John Phone #: ###-####
|
BLD-Foundation | 3/4/2013 | 3/5/2013 | 3/5/2013 | A | PASS |
Dave Hannah
|
|
|
stem wall, pre column insp//john Phone #: ###-####
|
BLD-Footing | 2/26/2013 | 2/27/2013 | 2/27/2013 | A | PASS |
Dave Hannah
|
|
|
jon Phone #: ###-####
|
Issue PAID IN FULL permit | | | 2/12/2013 | | DONE |
|
|
|
|
(F) Reprint permit | | | 2/12/2013 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/12/2013 | | DONE |
|
|
|
|
OVERRIDE | | | 2/8/2013 | | |
|
|
|
|
Plan assigned to (CJW) | 12/14/2012 | 12/14/2012 | 2/8/2013 | | PASS |
Carl Westfall
|
|
|
CSHQA ARCHITECTS - WILCOMB OFFICE BUILDING (10 days - Dec 27) ePlanReview ***PRIORITY PROCESSING - LEED PLATINUM***
|
Routing - PLAN CHECK | 2/7/2013 | | 2/8/2013 | | PASS |
Carl Westfall
|
|
|
Drawings approved after the 3rd review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/8/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/8/2013 | | DONE |
Christina Prado
|
|
|
Spoke with Tj with Jordan WIlcomb Const - Verbally gave new value over the phone so I quoted him total fees due. Will bring in forms 302 & 306 as well as ACHD when ready to pick up
|
Plan resubmittals received | | | 2/7/2013 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/5/2013 | | 2/6/2013 | | DONE |
Carl Westfall
|
|
|
Rrouting completed
|
Routing PW Solid Waste | 2/4/2013 | | 2/6/2013 | | PASS |
Peter J. McCullough
|
|
|
|
Routing PW Geothermal | 2/4/2013 | | 2/6/2013 | | PASS |
Jarom Gray
|
|
|
|
Routing - FIRE | 2/4/2013 | | 2/5/2013 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
Routing - PLAN CHECK | 1/28/2013 | | 2/5/2013 | | FAIL |
Carl Westfall
|
|
|
Completed the 2nd plan review. Corrections to the plans required. See the abbreviated 2nd plan review report.
|
Routing - PLANNING | 2/4/2013 | | 2/5/2013 | | PASS |
David Moser
|
|
|
The parking layout is OK as per the V2 C3 Grading and Drainage Plan. The angled parking can not block the trash room door.
|
Routing - PLUMBING | 2/4/2013 | | 2/4/2013 | | PASS |
Bill VanDegrift
|
|
|
per pans and ISPC
|
Routing - FIRE | 2/1/2013 | | 2/1/2013 | | FAIL |
Scott Arellano
|
|
|
Correction needed on plumbing plan P2.2 which shows fire service line running underneath building. See changemark on plan.
|
Plan resubmittals received | | | 1/28/2013 | | DONE |
|
|
|
Resubmittal review delayed because of other committments and time frames. 8.5 hours overtime was worked that week after the resubmittal came in.
|
1st review completed | | | 1/7/2013 | | FAIL |
Carl Westfall
|
|
|
|
Routing - PLAN CHECK | 12/14/2012 | | 1/7/2013 | | FAIL |
Carl Westfall
|
|
|
|
Routing - FIRE | 12/18/2012 | | 1/2/2013 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans.
|
Routing PW Street Lights | 12/18/2012 | | 12/20/2012 | | PASS |
Mike D Hedge
|
|
|
Street Light inspection required.
|
Routing PW Solid Waste | 12/18/2012 | | 12/20/2012 | | FAIL |
Peter J. McCullough
|
|
|
|
Routing - PLUMBING | 12/14/2012 | | 12/18/2012 | | FAIL |
Bill VanDegrift
|
|
|
1. UPC 1101.11.2- provide secondary roof drainage sized per section 1101.11.1
2. UPC 419 future water for urinal must be tied to water closet supply drop
3. UPC 313.6 provide freeze protection information for domestic water at solar system.
|
Routing PW Sewer Rating | 12/14/2012 | | 12/17/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Design | 12/14/2012 | | 12/17/2012 | | DONE |
Jon R. Gunnerson
|
|
|
Really for geothermal.
|
Routing - PLANNING | 12/14/2012 | | 12/17/2012 | | FAIL |
David Moser
|
|
|
David Moser - CUP12-00045, the end angled parking space shall be removed since it blocks access to the indoor trash room.
|
Routing - Design Review | 12/14/2012 | | 12/17/2012 | | PASS |
Andrea Tuning
|
|
|
Andrea Tuning - DRH12-00316
|
Routing - Erosion and Sediment | 12/14/2012 | | 12/17/2012 | | PASS |
Kimberly M. Johnson
|
|
|
|
Routing - Addressing | 12/14/2012 | | 12/17/2012 | | PASS |
|
|
|
|
Routing PW Geothermal | 12/14/2012 | | 12/17/2012 | | FAIL |
|
|
|
|
Payment Received | | | 12/14/2012 | | DONE |
|
|
|
Payment received via Govolutions
|
Intake Approval | | | 12/14/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Pending Assignment by JCB | 12/14/2012 | | 12/14/2012 | | DONE |
Jason Blais
|
|
|
|
Plan Reviewer's activity | | | 12/14/2012 | | DONE |
Jason Blais
|
|
|
Emailed architect to have him contact ACHD for evaluation of any impact fees due. Written verification from ACHD will need to be provided to our Permit Counter prior to the building permit being issued.
|
Routing - PUBLIC WORKS | 12/14/2012 | | 12/14/2012 | | PASS |
Beverly Mountain
|
|
|
|
Intake Approval | | | 12/12/2012 | | FAIL |
Tim L. Woodard
|
|
|
Hello Ted,
Thank you for using the new E-plan system. I will need a #528 Major TI Checklist filled out and uploaded prior to completing the full prescreen review. However; I did notice that sheet #304 Registered Design Professional Form was not signed by the owner. That sheet will need to be signed by the owner prior to the review taking place. I was able to correct sheet # A2.3 and make that sheet horizontal vs. vertical orientation. Also the survey appears to not have the required stamping area required; since that sheet is for reference we will not require that sheet to be corrected either. At this point we just need the checklist filled out and uploaded to help in determining if the required items are available and sheet # 304 signed by the owner.
Best regards,
Tim Woodard
###-####
twoodard@cityofboise.org
|
Application received | | | 12/7/2012 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 7 2012 7:54AM
|