BLD-Final | 4/1/2013 | 4/1/2013 | 4/1/2013 | P | PASS |
Mike Jordan
|
|
|
Phone #: 6088231 >> Inspection requested via mobile web by Rustin
|
DOC - Permit Finaled | 4/1/2013 | 4/1/2013 | 4/1/2013 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Conference | 2/20/2013 | 2/21/2013 | 2/21/2013 | A | DONE |
Mike Jordan
|
|
|
Phone #: 6088231 >> Inspection requested via mobile web by Rustin
|
BLD-Energy code compliance | 2/21/2013 | 2/21/2013 | 2/21/2013 | A | PASS |
Mike Jordan
|
|
|
Phone #: 6088231 >> Inspection requested via mobile web by Rustin
|
BLD-Framing/Rough-in | 2/21/2013 | 2/21/2013 | 2/21/2013 | A | PASS |
Mike Jordan
|
|
|
Phone #: 6088231 >> Inspection requested via mobile web by Rustin
|
BLD-Framing/Rough-in | 2/19/2013 | 2/19/2013 | 2/19/2013 | P | FAIL |
Mike Jordan
|
|
|
Phone #: 6088231 >> Inspection requested via mobile web by Rustin. Provide remainder of straps as noted on plan review, complete footing work for stairs.
|
BLD-Framing/Rough-in | 2/15/2013 | 2/19/2013 | 2/19/2013 | A | FAIL |
Mike Jordan
|
|
|
Phone #: 6088231 >> Inspection requested via mobile web by Rustin. Pleas provide truss enginnering to complete framing inspection, repair holdown at garage portal frame, provide tempered glazing at window by back door, follow all piont loads to foundation, provide straps at double top plate breaks up stairs and were rake wall intersects with ponywall. Provide sleepers at overbuild (were mech flue and vent are). Correction notice posted. No cover at this time.
|
BLD-Framing/Rough-in | 2/14/2013 | 2/14/2013 | 2/14/2013 | P | NR |
Mike Jordan
|
|
|
Phone #: 6088231 >> Inspection requested via mobile web by Rustin. Needs to complete airseal package prior to framing inspection.
|
BLD-Wall Bracing | 2/12/2013 | 2/13/2013 | 2/13/2013 | A | PASS |
Mike Jordan
|
|
|
Phone #: 6088231 >> Inspection requested via mobile web by Rustin
|
BLD-Wall Bracing | 2/7/2013 | 2/8/2013 | 2/8/2013 | A | FAIL |
Mike Jordan
|
|
|
Phone #: 6088231 >> Inspection requested via mobile web by Rustin. Missing braced wall panel on west wall, also missing areas on south wall upstairs.
|
BLD-Wall Bracing | 2/5/2013 | 2/5/2013 | 2/5/2013 | P | FAIL |
Mike Jordan
|
|
|
Phone #: 6088231 >> Inspection requested via mobile web by Rustin. Repair holddown in pfh. Pick up all missing panels.
|
BLD-Wall Bracing | 2/4/2013 | 2/5/2013 | 2/5/2013 | A | NR |
Mike Jordan
|
|
|
Phone #: 6088231 >> Inspection requested via mobile web by Rustin. No approved plans on site.
|
Elevation Cert Rec'd-Final | | | 1/29/2013 | | PASS |
|
|
|
|
BLD-Foundation | 1/16/2013 | 1/16/2013 | 1/16/2013 | P | PASS |
Tom Arcoraci
|
|
|
jay Phone #: ###-####
|
BLD-Footing | 1/15/2013 | 1/15/2013 | 1/15/2013 | P | PASS |
Mike Jordan
|
|
|
1 pm - Jay Phone #: ###-####
|
Override - Parcel Holds | 1/15/2013 | 1/1/1900 | 1/15/2013 | | |
|
|
|
footing only
|
Issue PAID IN FULL permit | | | 1/14/2013 | | DONE |
|
|
|
|
OVERRIDE | | | 1/11/2013 | | |
|
|
|
|
Telephone call | | | 1/11/2013 | | DONE |
Tisha Gallop
|
|
|
called Stetson Homes and told Debbie permit is ready and fee.
|
Elevation Cert Rec'd-Prelim | | | 1/11/2013 | | FAIL |
|
|
|
Foundation and finish floor elevations on sheet A9 of the second plan set are not shown. Add these elevations before plans can be approved. Jim Wyllie (###-####)
|
CHANGE STATUS TO (REV) | | | 1/11/2013 | | DONE |
Tisha Gallop
|
|
|
still needs to pass Floodplain
|
Elevation Cert Rec'd-Prelim | | | 1/11/2013 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/11/2013 | | DONE |
Barbara Stitt
|
|
|
|
Routing - PUBLIC WORKS | 1/11/2013 | | 1/11/2013 | | PASS |
Beverly Mountain
|
|
|
|
Inspection Record Card- Bld | | | 1/11/2013 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Bld | | | 1/11/2013 | | DONE |
Tisha Gallop
|
|
|
|
Override - Parcel Holds | | | 1/11/2013 | | |
|
|
|
|
Permit Ready to Issue | | | 1/11/2013 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (CDM) | | 12/7/2012 | 1/10/2013 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 1/10/2013 | | 1/10/2013 | | PASS |
Carl D Madsen
|
|
|
|
Case Summary (BLD) | | | 1/10/2013 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/10/2013 | | |
|
|
|
|
Plan resubmittals received | | | 1/8/2013 | | DONE |
Christina Prado
|
|
|
received two sets of plan sheets marked A2, A6 & A7; routed to Carl Madsen for review
|
Telephone call | | | 12/28/2012 | | DONE |
|
|
|
builder called checking on permit. read correction list and told him to contact Jim Wyllie
|
1st review completed | | | 12/19/2012 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 12/19/2012 | | 12/19/2012 | | FAIL |
Carl D Madsen
|
|
|
Supporting structure needs to be indicated on the second floor framing and roofing plan and the walls and openings need to be indicated on the wall bracing plan for clarity. The drag strut connection per the engineering needs to be indicated on the plans. Sent E-Mail to the applicant 12-19-12 CDM
|
Routing - MECHANICAL | 12/18/2012 | | 12/19/2012 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 12/17/2012 | | 12/18/2012 | | PASS |
Todd Tucker
|
|
|
The southern patio post must be moved out of the easement and comply with the 30 foot rear yard setback.
|
Routing - PUBLIC WORKS | | | 12/17/2012 | | FAIL |
Connie Baumgartner
|
|
|
FAILED BY JIM WYLIE
|
Routing PW Flood Plain | 12/7/2012 | | 12/14/2012 | | FAIL |
|
|
|
Elevation certificate not provided. Finish floor elevation to be greater than 2685.8. Jim Wyllie (###-####)
|
Route to Impact Fee Review | 12/7/2012 | 12/12/2012 | 12/11/2012 | | PASS |
Cindy M. Gould
|
|
|
|
Application received | | 12/7/2012 | 12/7/2012 | | DONE |
Christina Prado
|
|
|
|
Routing PW Sewer Rating | 12/7/2012 | | 12/7/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/7/2012 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 12/7/2012 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/7/2012 | | DONE |
Christina Prado
|
|
|
|
Routing - Addressing | 12/7/2012 | | 12/7/2012 | | PASS |
April Wing
|
|
|
|