Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD12-03211
StatusFinaled
Name BENITON CONSTRUCTION
Site Address 8055 W GODDARD RD
Project NameCapitol High - Hallway Remodel
Customer Number 
ePlanReviewNo
Description
(CAPITAL HIGH SCHOOL – Hallway Remodel – Sprinkler Upgrade) Permit is to remodel the existing hallways within the school and extend the sprinkler system to them. This building is partially fire sprinklered there is an informal upgrade agreement outline attached to BLD11-00450 to show the intent to have the building fully spinklered in phases over the next 5 years. Approval contingent upon adhering to the approved plans on file. Work to include: installation of a new suspended ceiling, new lighting / switching, new accessible doors / hardware, continuation of sprinkler and alarm system into hallways / gymnasium, and finishes in compliance with chapter 8 of the 2009 IBC. This building is partial Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 10/9/201310/8/2013 DONE
DetailsChristina Prado
finaled 10-08-2013
Second Notice 9/7/201310/4/2013 DONE
First Notice8/23/20138/23/20138/28/2013 DONE
DetailsJim Sly
mailed 8-29-13
BLD-Final8/22/20138/23/20138/23/2013PPASS
DetailsJim Sly
russ Phone #: ###-####
Sprinkler head in janitors room, Emerg. light in breezeway and smoke seal on stairway door.....OK Cert of Compliance issued.
DOC - Permit Finaled8/23/20138/23/20138/23/2013PPASS
DetailsJim Sly
FIRE-Final Inspection8/21/20138/22/20138/22/2013APASS
DetailsTroy Cobbley
Life safety passed. One fire door was having problems latching and was in the process of being repaired and one additional emergency light is needed in the second floor breezeway. These items were going to be shown to the building inspector.
BLD-Final8/21/20138/21/20138/21/2013PNR
DetailsJim Sly
russ please call 30 before going out Phone #: ###-####
Need Fire life, sprinkler and alarm finals.
BLD-Conference8/19/20138/20/20138/20/2013ADONE
DetailsJim Sly
Russ Phone #: ###-####
BLD-Ceiling Grid Inspection8/1/20138/2/20138/2/2013APART
DetailsMike Jordan
russ Phone #: ###-####. Ceiling grid at cafateria and shop corridor. Pending eelctrical rough in inspection.
BLD-Ceiling Grid Inspection7/26/20137/29/20137/29/2013APART
DetailsJim Sly
matt Phone #: ###-####
Main floor ceiling grid OK except Shop corridor and Cafeteria.
BLD-Framing/Rough-in7/22/20137/23/20137/23/2013APART
DetailsJim Sly
ceiling grid inspection 2nd floor-Russ Phone #: 871-094
2nd Flr ceiling grid....OK.
BLD-Framing/Rough-in7/8/20137/9/20137/9/2013APART
DetailsJim Sly
russ Phone #: ###-####
OK to cover covered (E. to W.) walkway.....Far North end of main Bldg. MTI inspected all welding.
Issue PAID IN FULL permit  4/15/2013 DONE
DetailsTisha Gallop
(F) Reprint permit  4/15/2013 DONE
DetailsTisha Gallop
OVERRIDE  1/8/2013  
Telephone call  1/8/2013 DONE
DetailsChristina Prado
left message with Scott Henson advising permit is ready pending payment, GC & RP
Permit Ready to Issue  1/8/2013 DONE
DetailsChristina Prado
Plan assigned to (TLW)1/3/2013 1/7/2013 DONE
DetailsTim L. Woodard
Reassigned to Tim W. due to no ESC approvals on file. TLW
Routing - Erosion and Sediment1/4/2013 1/7/2013 PASS
DetailsKimberly M. Johnson
PLANS/APPL TAKEN TO FRONT DESK  1/7/2013 DONE
DetailsTim L. Woodard
Routing - MECHANICAL12/26/2012 1/3/2013 PASS
DetailsTroy James
Routing - PLAN CHECK1/3/2013 1/3/2013 PASS
DetailsTim L. Woodard
Approved with an e-mail from Scott Henson outlining compliance with the 20% accessibility requirement. TLW
Routing - ELECTRICAL1/3/2013 1/3/2013 PASS
DetailsTim L. Woodard
Reviewed plans with Doug Poety (Electrical Division Supervisor) and found no correction items. The work will be field inspected for full compliance with the 2008 NEC. TLW
PLANS/APPL TAKEN TO FRONT DESK  1/3/2013 DONE
DetailsTim L. Woodard
Case Summary (BLD)  1/3/2013 DONE
DetailsTim L. Woodard
Inspection Record Card- Bld  1/3/2013 DONE
DetailsTisha Gallop
Plan assigned to (TLW)12/13/2012 1/3/2013 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK12/21/2012 12/21/2012 PEND
DetailsTim L. Woodard
Need updated long range phasing plan. TLW
1st review completed  12/21/2012 DONE
DetailsTim L. Woodard
Routing - PUBLIC WORKS12/10/2012 12/13/2012 PASS
DetailsConnie Baumgartner
Please route to Brian Murphy
Routing PW Drainage12/12/2012 12/13/2012 PASS
DetailsBrian Murphy
Routing - Addressing12/11/2012 12/11/2012 PASS
DetailsApril Wing
Routing PW Sewer Rating12/11/2012 12/11/2012 PASS
DetailsConnie Baumgartner
Plans ACCEPTED BY PLAN TECH  12/10/2012 DONE
DetailsChristina Prado
Intake Approval  12/10/2012 PASS
DetailsTim L. Woodard
Recd Pcfee & Taken To Pln CK  12/10/2012 DONE
DetailsChristina Prado
Application received 12/10/2012