BLD-Final | 6/2/2015 | 6/2/2015 | 6/3/2015 | P | PASS |
Jim Storey
|
|
|
would like call ahead; John Phone #: ###-####
|
DOC - Permit Finaled | 6/3/2015 | 6/3/2015 | 6/3/2015 | P | PASS |
Jim Storey
|
|
|
|
BLD-Energy code compliance | 3/5/2014 | 3/6/2014 | 3/6/2014 | A | PASS |
Jim Storey
|
|
|
Please call 10min prior for access - John Phone #: ###-####
|
BLD-Framing/Rough-in | 11/22/2013 | 11/25/2013 | 11/25/2013 | A | PART |
Jim Storey
|
|
|
John Phone #: ###-#### pending ele ri
|
BLD-Footing | 9/30/2013 | 10/1/2013 | 10/1/2013 | P | PASS |
Jim Storey
|
|
|
John Phone #: ###-####
|
BLD-Conference | 6/4/2013 | 6/5/2013 | 6/5/2013 | A | DONE |
Jim Sly
|
|
|
John-Please call 30 mins prior to inspection Phone #: ###-#### Met with homeowner and contractor.
|
OVERRIDE | | | 1/11/2013 | | |
|
|
|
|
Routing Walk-In (BLD) | 1/11/2013 | 1/11/2013 | 1/11/2013 | P | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 1/11/2013 | 1/11/2013 | 1/11/2013 | | PASS |
Perry Paine
|
|
|
|
Case Summary (BLD) | | | 1/11/2013 | | |
|
|
|
|
Inspection Record Card- Bld | | | 1/11/2013 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 1/11/2013 | | DONE |
Barbara Stitt
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/11/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/11/2013 | | DONE |
Barbara Stitt
|
|
|
|
Routing Walk-In (Zoning) | 12/14/2012 | 12/14/2012 | 12/14/2012 | P | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 12/14/2012 | 12/14/2012 | 12/14/2012 | P | FAIL |
Perry Paine
|
|
|
engineering required
|
Routing Walk-In (PW Hillside) | 12/13/2012 | 12/13/2012 | 12/14/2012 | P | DONE |
Jason C. Taylor
|
|
|
|
1st review completed | | | 12/14/2012 | | DONE |
|
|
|
|
Application received | | 12/13/2012 | | | |
|
|
|
|