Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD12-03248
StatusFinaled
Name SAJO INC
Site Address 350 N MILWAUKEE ST Unit: 1170
Project NameBTS - #1170 ALDO
Customer Number 
ePlanReviewNo
Description
(ALDO – BTS SPACE # 1170) Permit is to remodel an existing 1,710 square retail tenant space with in a covered mall building. This tenant space was last remodeled under BLD00-03463 for “Bakers” (shoe store). Scope of work includes: new mechanical system, new suspended gypsum board ceiling, new accessible counter, minor changes to existing partition walls, new lighting, new accessible doors / hardware, new glass store front system, and interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department, The smoke evacuation system shall remain operational as originally installed under the 1985 UBC. NOTE: a separate sign permit for interior mall signage is required before sign installation. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 5/2/20135/29/2013 DONE
DetailsChristina Prado
complete 5-29-13
First Notice 3/22/20134/22/2013 DONE
DetailsChristina Prado
mailed 4-23-13
Permanent Occupancy  3/12/2013 DONE
DetailsBarbara Stitt
BLD-Final3/6/20133/11/20133/11/2013PPASS
DetailsMike Jordan
Kevin Phone #: ###-####. Ok for perm occ.
FIRE-Final Inspection3/6/20133/11/20133/11/2013APASS
DetailsTroy Cobbley
life safety passed
FIRE-Conference3/8/20133/8/20133/8/2013PDONE
DetailsTroy Cobbley
Went over life safety requirements with job superintendant
BLD-Conference2/14/20132/14/20132/14/2013PDONE
DetailsMike Jordan
kevin Phone #: ###-####
FIRE-Conference2/12/20132/13/20132/13/2013ADONE
DetailsTroy Cobbley
Kevin and I went over duct detector placement on the new hvac unit and placement of the fire extinguishers. I also noted that the plans showed 10' racks but actually the racks are 12'. I asked him to discuss with plan review.
BLD-Framing/Rough-in2/4/20132/5/20132/5/2013APASS
DetailsMike Jordan
Kevin Phone #: ###-####. Hardlids, popouts and storefront ok.
BLD-Framing/Rough-in2/1/20132/4/20132/4/2013PCANC
DetailsMike Jordan
KEVIN Phone #: ###-#### Inspection cancelled from web by: Barbara Stitt
Issue PAID IN FULL permit  1/22/2013 DONE
DetailsTisha Gallop
Plan assigned to (TLW)12/19/2012 1/4/2013 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  1/4/2013 DONE
DetailsTim L. Woodard
Case Summary (BLD)  1/4/2013 DONE
DetailsTim L. Woodard
Print Occupancy Form  1/4/2013 DONE
Permit Ready to Issue  1/4/2013 DONE
DetailsTisha Gallop
Telephone call  1/4/2013 DONE
DetailsTisha Gallop
called Tim Schenk and told him permit is ready, fee and need GC form.
Routing - PLAN CHECK12/21/2012 1/3/2013 PASS
DetailsTim L. Woodard
1st review completed  1/3/2013 DONE
DetailsTim L. Woodard
Routing - PUBLIC WORKS12/19/2012 12/21/2012 PASS
DetailsBeverly Mountain
Routing - Addressing12/20/2012 12/20/2012 PASS
DetailsApril Wing
Application received 12/14/201212/19/2012 DONE
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  12/19/2012 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  12/19/2012 DONE
DetailsTisha Gallop
Intake Approval  12/19/2012 PASS
DetailsTim L. Woodard